Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | 1 | Accepted-AOC Emerged as L1 |
| Sl No | Description | Qty | Unit | R PACKIARAJ ENGINEERING L1 |
|---|---|---|---|---|
| 1.00 | 8337502188
DISMANTLING BY CUTTING AND ERECTION OF NON FLANGED SS PIPES - SIZE: 150NB | 50 | METRE | 359 ₹17,950 Lowest |
| 2.00 | 8337502190
DISMANTLING BY CUTTING AND ERECTION OF NON FLANGED SS PIPES - SIZE: 200NB | 50 | METRE | 510 ₹25,500 Lowest |
| 3.00 | 8330102265
Opening of window and rewelding in pieplines to facilitate cleaning of 150 NB SS pipeline (BPA) | 40 | NUMBER | 1,436 ₹57,440 Lowest |
| 4.00 | 8330102268
Opening of window and rewelding in pieplines to facilitate cleaning of 300 NB above SS pipeline (BPA) | 24 | NUMBER | 2,721 ₹65,304 Lowest |
| 5.00 | 8330102266
Opening of window and rewelding in pieplines to facilitate cleaning of 200 NB SS pipeline (BPA) | 15 | NUMBER | 1,913 ₹28,695 Lowest |
| 6.00 | 8337500499
FABRICATION & ERECTION OF SS PIPELINE USING INERT GAS WELDING – SIZE 50 NB – TNPL UNIT-2 | 80 | METRE | 442 ₹35,360 Lowest |
| 7.00 | 8337500330
Fabrication & erection of SS pipeline using inert gas welding size 80 NB | 80 | METRE | 575 ₹46,000 Lowest |
| 8.00 | 8337500331
Fabrication & erection of SS pipeline using inert gas welding size 100 NB | 80 | METRE | 679 ₹54,320 Lowest |
| 9.00 | 8337500501
FABRICATION & ERECTION OF SS PIPELINE USING INERT GAS WELDING – SIZE 150 NB – TNPL UNIT-2 | 80 | METRE | 830 ₹66,400 Lowest |
| 10.00 | 8337500450
Fabrication & Erection of 200 NB SS pipeline | 80 | METRE | 1,090 ₹87,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
19 Sept 2025, 3:00 pmClosed
A G M (TOS)
TAMIL NADU NEWSPRINT AND PAPERS LIMITED UNIT II (WORKS OFFICE), KAGITHANAGAR MONDIPATTI VILLAGE, K. PERIYAPATTI POST, MANAPPARAI TALUK, TIRUCHIRAPPALLI DISTRICT.
DISMANTLING AND ERECTION OF SS PIPELINES FOR DESCALING WORK IN PULPMILL AT TNPL UNIT- II, TRICHY.
2025_TNPL_599069_1
TNPL/TOS/U2/252623002143
Open Tender
Miscellaneous Services
Item Rate
365 days
TNPL UNIT - II, MONDIPATTI
The contractor should have carried out similar kind of work. If required, successful contractor should provide the order copy for reference to TNPL.
4 documents required · 4 mandatory
₹0
₹7,500
27 Nov 2025
1 Sept 2025
20 Sept 2025
1 Sept 2025
19 Sept 2025
1 Sept 2025
Amount
8337502188 DISMANTLING BY CUTTING AND ERECTION OF NON FLANGED SS PIPES - SIZE: 150NB
8337502190 DISMANTLING BY CUTTING AND ERECTION OF NON FLANGED SS PIPES - SIZE: 200NB
8330102265 Opening of window and rewelding in pieplines to facilitate cleaning of 150 NB SS pipeline (BPA)
8330102268 Opening of window and rewelding in pieplines to facilitate cleaning of 300 NB above SS pipeline (BPA)
8330102266 Opening of window and rewelding in pieplines to facilitate cleaning of 200 NB SS pipeline (BPA)
8337500499 FABRICATION & ERECTION OF SS PIPELINE USING INERT GAS WELDING – SIZE 50 NB – TNPL UNIT-2
8337500330 Fabrication & erection of SS pipeline using inert gas welding size 80 NB
8337500331 Fabrication & erection of SS pipeline using inert gas welding size 100 NB
8337500501 FABRICATION & ERECTION OF SS PIPELINE USING INERT GAS WELDING – SIZE 150 NB – TNPL UNIT-2
8337500450 Fabrication & Erection of 200 NB SS pipeline
8337500502 FABRICATION & ERECTION OF SS PIPELINE USING INERT GAS WELDING – SIZE 250 NB – TNPL UNIT-2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .