Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
27 Nov 2026, 3:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Refer NIeT
Refer NIeT
Restoration of damage of pipeline with road restoration at sansad no. 5 and 6 at Bilkanda-II W/S Scheme in Barrackpore-II Block under Northn24 Pgs W/S Div-I, P.H.E, Dte.
2026_PHED_5087728_1
WBPHED/5e/AE(HQ-I)/NWSD1/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Refer NIeT
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,700
20 Nov 2026
20 Nov 2026
30 Nov 2026
20 Nov 2026
27 Nov 2026
20 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of Item | |||||
| 1.01 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
P - 240 / It-3.16 (a) of P.W. ( R ) Sch. 2018
(With effect from – 30/08/2018)
Depth up to 300 mm.
670.0 x 0.6 = 402.0 Sqm | 402 | sqm | 33.4 | ₹13,426.8 |
| 2 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
(c) Pakur Variety
670.0 x 0.6 x 0.15 = 60.30 cum | 60.3 | cum | 5,282.76 | ₹3,18,550.43 |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
670.0 x 0.6 x 0.15 = 60.30 cum | 60.3 | cum | 936.21 | ₹56,453.46 |
| 4 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, withnecessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101- 1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line.
ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.
iii)No part payment at any stage on account of supply of materials shall be entertained.
iv)Payment will be made on actual consumption of materials.
Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials & excluding cost of valve.
90 mm dia (OD) UPVC | 24 | Mtr. | 342 | ₹8,208 |
| 4.01 | 110 mm dia (OD) UPVC | 18 | Mtr. | 471 | ₹8,478 |
| 5 | Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).
90 mm dia (OD) UPVC | 24 | Mtr. | 0.88 | ₹21.12 |
| 5.01 | 110 mm dia (OD) UPVC | 18 | Mtr. | 1.08 | ₹19.44 |
| 6 | GST @ 18% | 1 | Nos | 72,928.3 | ₹72,928.3 |
| 7 | CESS @ 1% | 1 | Nos | 4,780.85 | ₹4,780.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
ANNEXURE_WBF2911.pdf
Tender Documents • 0.51 MB
BOQ_5216717.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .