Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance B 10 KRISHNA IND ESTATE BIDC GORWA VADODARA 390016 | VADODARA | VADODARA | GUJARAT | 390016 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹55,620
Closing Date
9 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE(AF) Bareilly
HQ CWE (AF) Bareilly
Provn of Civilian Community Hall Cum Recreation centre and Guard Room at MES Complex at AF Stn Bhowali and Construction of SATCOM Earth Station at AF Stn Bhowali
2022_MES_510926_1
30034/JO/12/E3
Limited
Consultancy Services
Item Rate
30 days
Bhowali
As per NIT
2 documents required · 2 mandatory
₹0
Exempted
11 Mar 2022
28 Feb 2022
11 Mar 2022
2 Mar 2022
9 Mar 2022
2 Mar 2022
2 Mar 2022 - 9 Mar 2022
30 days
Amount
Consultancy services for preparation & supply of architectural drawings (plan, section & elevations), structural design, preparation of BOQ & estimate, rate analysis for " Provision of Civilian community cum recreation centre and guard room at MES Complex at Air Force Bhowali"
(a) Preparation and submission of self sufficient architectural drawing inclding plan, section, elevation, other relevent detailed drawing and architectural.note complete with schedule of finishes a per Zonal Specification duly signed by the consultant. Note:- Site plan and line plan of proposed building will be provided by the CWE (AF) Bareilly. (b) Submission of internal electrification services inclding all fittings/fixtures drawings as per standard engineering practices on building layout plans and schematic diagram of electic fitting & fixtures.
(c) Preparation and submission of self sufficient structural designs & drgs including structural details, structural notes conforming to standards IS-456, IS-816, IS-875, IS-1893, IS-2062, SI-4326, IS-13920 and any other latest and relevant indian Standard of the building as per the line plan provided. The paramenters for structural design are as under:- (i) 01 x block of Community Hall at G/F and Gourd cum rest room at FF Accn/ size 16.19 x 8.09 M x 3.2 M ceiling hight, Total hight of Bldg= 3.2 x 2 = 6.4M with stair case, Total plinth area of Bldg = 173.11 Sqm
(ii) The design shall include the following parameters common in the bldg:- (aa) Reinforcement steel shall be Fe-500/500D grade TMT bars. The grade of concrete shall be M-25 (Design mix) (ab) Seismix Zone - IV, Area Bhowali, Nanital (UK). (ac) SBC 10.00 Ton/Sqm (Tentative) at 1.50 Mtr depth. The actual SBC shall be given by CWE (AF) Bareilly at later stage. The designer shall change the foundation detail after actual SBC is provided. No Extra claim shall be given for the same. (ad) Brick masonry in CM 1:6 with Flyash sub class 'B' bricks having minimum compressive strength 75 kg per sq cm . (ae) Foundation shall be RCC isolated/ Combined footing/ raft/ mat foundation as per requirement. (af) The structure shall be RCC framed construction with RCC roof and brick wall panneling (ag) Thickness of brick wall shall be 230 mm all as per line plan.
(iii) Any other relevant detail required shall be taken from ACWE B/R of HQ CWE (AF) Bareilly (aa) Supply of design calculations folders along with STAAD output file both in hard and soft copy-01 (copy each) (ab) Supply of 01 set of original tracing hard copy (A1 size) on 'Gateway' or equivalent brand tracing paper along with a soft copy of drawings, as directed. The design prepared by one designer shall be checked by another designer and both the persons shall sign the design calculations and drgs along with date. (ac) The supplier shall give free of cost clarification, if any, during complete execution period of the building. (ad) Any amendment required during execution shall be made by the consultant and requisite copies of amended sheets shall be submitted free of cost. (ae) The consultant shall discuss the architectural drg, preliminary deisgn & drg with ACWE B/R of HQ CWE (AF) Bareilly, before submitting the final architectural & structural design and drawings.
(af) The responsibility for the structural design & drawings prepared rests with the consultant. In case of any defect/ damage detected in the designed structure during, its design life and the same is attributed to faulty drawing/ design, the consultant will be laible for penalty of 10% of the total project cost. (ag) Third party vetting / proof checking. The consultant shall be responsible for third party vetting/ proof checking from IITs/NITs/ Or any Govt Engineering College duly signed by authorised signatory on behalf of the institute and not from a professor/ individual of the institute in his personal capacity. The third party vetting the design, drawing shall also be liable for ensuring that the design & drawings are in complaince as per the laid down standards, regulations adherence to NBC norms and sound engineering practices. The consultant is responsible for obtaining clarification from the vetting agency till the completion of project.
(ah) A certificate that all details have been throughly cheked and are in complaince to standards, codes, regulations in respect of safety, soundness and economy shall be obtained from the vetting agencies. (aj) The consultant on being issued the Job Order shall send his design team to HQ CWE (AF) Bareilly to discuss and finalize the design parameters and obtain clarifications on any other issues. The date of visit of the consultant's design team shall be decided in consultation with the HQ CWE (AF) Bareilly. (ak) On preparation of the design folder and preliminary structural drawings, the consultant shall send his design team to make a detailed power point presentation of the structural design and drawings to the HQ CWE (AF) Bareilly. The date of presentation by the consultant's design team shall be decided in consultation with the HQ CWE (AF) Bareilly.
(al) The final architectural & structural drawings duly vetted by authorities as mentioned shall be submitted to the HQ CWE (AF) Bareilly by the consultant's design team and the consultant's team should come prepared to make any corrections/ amendments to the same if required. (am) The consultant's design team shall have to visit to AGE (I) (AF) Bhowali under HQ CWE (AF) Bareilly at any time during the planning and execution of the work if required. (an) Nothing extra shall be payable for the above visits fo consultant's design team to HQ CWE (AF) Bareilly.
(ao) Consultancy for preparation of BOQ, estimate and rate analysis of above bldgs with supporting documents to be done separately for such as price list, quotations as under. (ap) Taking off quantities and preparation of estimate and abstract and duly priced bills of quantities for bldgs work (Lump Sum) and service within the scope of BOO based on MES SSR Part-II 2020 and market rates where SSR rates not available based on finalized drgs of bldgs. (iv) Preparation of market analysis of the building & services covered in the above mentioned work alongwith supporting details/ documents to analyse quoted rate for reasonability. (v) Schedule of electric supply shall be included in BOQ seperately.
Consultancy services for preparation & supply of architectural drawings (plan, section & elevations), structural design, preparation of BOQ & estimate, rate analysis for " Construction of SATCOM Earth Station at AF Station Bhowali"
(a) Preparation and submission of self sufficient architectural drawing inclding plan, section, elevation, other relevent detailed drawing and architectural.note complete with schedule of finishes a per Zonal Specification duly signed by the consultant. Note:- Site plan and line plan of proposed building will be provided by the CWE (AF) Bareilly. (b) Submission of internal electrification services inclding all fittings/fixtures drawings as per standard engineering practices on building layout plans and schematic diagram of electic fitting & fixtures.
(c) Preparation and submission of self sufficient structural designs & drgs including structural details, structural notes conforming to standards IS-456, IS-816, IS-875, IS-1893, IS-2062, SI-4326, IS-13920 and any other latest and relevant indian Standard of the building as per the line plan provided. The paramenters for structural design are as under:- (i) 01 x block of Earth Station (D/ S) Accn/ size 9.675 x 7.275M x 3.2m ceiling hight, Total hight of Bldg=3.2 x 2 = 6.4M with stair case, Total plinth area of Bldg = 142.73 sqm
(ii) The design shall include the following parameters common in the bldg:- (aa) Reinforcement steel shall be Fe-500/500D grade TMT bars. The grade of concrete shall be M-25 (Design mix) (ab) Seismix Zone - IV, Area Bhowali, Nanital (UK). (ac) SBC 10.00 Ton/Sqm (Tentative) at 1.50 Mtr depth. The actual SBC shall be given by CWE (AF) Bareilly at later stage. The designer shall change the foundation detail after actual SBC is provided. No Extra claim shall be given for the same. (ad) Brick masonry in CM 1:6 with Flyash sub class 'B' bricks having minimum compressive strength 75 kg per sq cm . (ae) Foundation shall be RCC isolated/ Combined footing/ raft/ mat foundation as per requirement. (af) The structure shall be RCC framed construction with RCC roof and brick wall panneling (ag) Thickness of brick wall shall be 230 mm all as per line plan.
(iii) Any other relevant detail required shall be taken from ACWE B/R of HQ CWE (AF) Bareilly (aa) Supply of design calculations folders along with STAAD output file both in hard and soft copy-01 (copy each) (ab) Supply of 01 set of original tracing hard copy (A1 size) on 'Gateway' or equivalent brand tracing paper along with a soft copy of drawings, as directed. The design prepared by one designer shall be checked by another designer and both the persons shall sign the design calculations and drgs along with date. (ac) The supplier shall give free of cost clarification, if any, during complete execution period of the building.
(ad) Any amendment required during execution shall be made by the consultant and requisite copies of amended sheets shall be submitted free of cost. (ae) The consultant shall discuss the architectural drg, preliminary deisgn & drg with ACWE B/R of HQ CWE (AF) Bareilly, before submitting the final architectural & structural design and drawings. (af) The responsibility for the structural design & drawings prepared rests with the consultant. In case of any defect/ damage detected in the designed structure during, its design life and the same is attributed to faulty drawing/ design, the consultant will be laible for penalty of 10% of the total project cost.
(ag) Third party vetting / proof checking. The consultant shall be responsible for third party vetting/ proof checking from IITs/NITs/ Or any Govt Engineering College duly signed by authorised signatory on behalf of the institute and not from a professor/ individual of the institute in his personal capacity. The third party vetting the design, drawing shall also be liable for ensuring that the design & drawings are in complaince as per the laid down standards, regulations adherence to NBC norms and sound engineering practices. The consultant is responsible for obtaining clarification from the vetting agency till the completion of project.
(ah) A certificate that all details have been throughly cheked and are in complaince to standards, codes, regulations in respect of safety, soundness and economy shall be obtained from the vetting agencies. (aj) The consultant on being issued the Job Order shall send his design team to HQ CWE (AF) Bareilly to discuss and finalize the design parameters and obtain clarifications on any other issues. The date of visit of the consultant's design team shall be decided in consultation with the HQ CWE (AF) Bareilly.
(ak) On preparation of the design folder and preliminary structural drawings, the consultant shall send his design team to make a detailed power point presentation of the structural design and drawings to the HQ CWE (AF) Bareilly. The date of presentation by the consultant's design team shall be decided in consultation with the HQ CWE (AF) Bareilly. (al) The final architectural & structural drawings duly vetted by authorities as mentioned shall be submitted to the HQ CWE (AF) Bareilly by the consultant's design team and the consultant's team should come prepared to make any corrections/ amendments to the same if required.
(am) The consultant's design team shall have to visit to AGE (I) (AF) Bhowali under HQ CWE (AF) Bareilly at any time during the planning and execution of the work if required. (an) Nothing extra shall be payable for the above visits fo consultant's design team to HQ CWE (AF) Bareilly. (ao) Consultancy for preparation of BOQ, estimate and rate analysis of above bldgs with supporting documents to be done separately for such as price list, quotations as under.
(ap) Taking off quantities and preparation of estimate and abstract and duly priced bills of quantities for bldgs work (Lump Sum) and service within the scope of BOO based on MES SSR Part-II 2020 and market rates where SSR rates not available based on finalized drgs of bldgs. (iv) Preparation of market analysis of the building & services covered in the above mentioned work alongwith supporting details/ documents to analyse quoted rate for reasonability. (v) Schedule of electric supply shall be included in BOQ seperately.
Venu Consultants Pvt Ltd
stage.html
html • 0.02 MB
finance_571008.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .