Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹38.4 LAdmitted-Finance AT BANTALA SINGH DEULI P O BANTALA SINGH P S PIPILI DIST PURI PIN 752104 | PIPILI | PURI | ODISHA | 752104 | -20.65% | ₹38.4 L | L1 | Admitted-Finance |
| 2 | L2₹39.7 L+₹1.3 L (3.40%)Admitted-Finance AT ANLOI VILLAGE CHAUPUR P O MODARI P S DHANG DIST PURI PIN 752015 STATE ODISHA | PURI | PURI | ODISHA | 752015 | -17.95% | ₹39.7 L+₹1.3 L (3.40%) | L2 | Admitted-Finance |
| 3 | L3₹41.0 L+₹2.6 L (6.74%)Admitted-Finance AT KATHUAREDI PO BENTAPUR PS BRAHMAGIRI DIST PURI ODISHA | PURI | PURI | ODISHA | -15.30% | ₹41.0 L+₹2.6 L (6.74%) | L3 | Admitted-Finance |
Tender Value
₹48.4 L
EMD Value
₹49,000
Closing Date
17 Jun 2026, 5:00 pmClosed
SE, RWSS DIVISION, PURI
O/O SE, RWSS DIVISION, PURI, WATER WORKS ROAD, PURI-752002
Construction of Sub-Divisional Water Testing Laboratory at RWSS Sub-Division, DELANG in Puri District.
2026_RWSS_131409_1
RWSS DIVISION PURI 07 OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
RWSS SUB-DIVISION, DELANG
Please Refer Tender Documents.
3 documents required · 3 mandatory
₹6,000
Yes
₹49,000
Yes
5 Aug 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
6 Jun 2026 - 11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. GROUND FLOOR
A-1) Supplying all materials, labour, T&P for earth work in excavation in foundation in all kinds of soil with in 50m initial lead and1.50m initial lift including rough dressing and breaking clods to maximum5cm to 7cm in size and laying in layers not exceeding 0.30min depth and as per the direction of EIC. | 1 | Cum | 1 | ₹1 |
| 2 | A-2) Supplying all materials, labour, T&P for filling foundation and plinth with excavated earth(in all kinds of soil) well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | - | Cum | 1 | - |
| 3 | A-3) Supplying all materials, labour, T&P and providing Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | - | Cum | - | - |
| 4 | A-4) Supplying all materials, labour, T&P and providing Smooth Centering and shuttering for RCC work including cost carriage royalty of all materials and dismentalling them after casting etc all complete as directed by E.I.C.
A) Footing & Plinth Beam | - | Sqm | - | - |
| 5 | A-4 B) Column & Beam (Ground Floor) | 1 | Sqm | 1 | ₹1 |
| 6 | A-4 C ) Column & Beam (1st Floor) | - | Sqm | - | - |
| 7 | A-4 D) Lintel | - | Sqm | - | - |
| 8 | A-4 E ) Roof Slab & Chajja (Ground Floor) | 0.6 | Sqm | 1 | ₹0.6 |
| 9 | A-4 F ) Roof Slab & Chajja (1st Floor) | - | Sqm | 1 | - |
| 10 | A-4 G ) Staircase | - | Sqm | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_595077.xls
BOQ • 0.35 MB
DTCN_WTL_Building_Delang.pdf
Tender Documents • 1.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .