| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 502 31 45 15 41 JAYANTHI JACINTH APARTMENT PHASE 2 PRASANTHI NAGAR KURAMANNAPALEM VISAKHAPATNAM ANDHRA PRADESH 530046 UDYAM AP 10 0014243 | VISAKHAPATANAM | ANDHRA PRADESH | 530046 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
18 Jan 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Arnab Dey
GE(P) NAVY Kalinga
PAIR AND MAINT OF TRANSFORMER 150/250 KVA AT DSC LINE AND VCB 11 KVA AT 1 TO 6 SUB STATION AT TP AREA
2021_MES_411138_1
GE(P)/N/K/JOB/13 of 20-21
Limited
Miscellaneous Services
Item Rate
30 days
GE(P) NAVY Kalinga
PAIR AND MAINT OF TRANSFORMER 150/250 KVA AT DSC LINE AND VCB 11 KVA AT 1 TO 6 SUB STATION AT TP AREA
1 document required · 1 mandatory
₹0
Exempted
19 Jan 2021
9 Jan 2021
19 Jan 2021
11 Jan 2021
18 Jan 2021
11 Jan 2021
30 days
Amount
REPAIR TO TRANSFORMER 150 KVA 11KV/433 STEPDOWN DISTRIBUTION, MAKE VOLTAMP AT DSC FOUR STRUCTURE DISREPAIRS TO VEHICLE TATA MOBILE 207DI BA NO 11C-089394K
i) Draining out the Transformer oil to container and kept safely and disconnecting the LT and HT cable connections for replacement of Unserviceable LT and HT bushings completely 01 job
ii) Opening the Top cover of the Transformer and dismantling the damaged Unserviceable Bushing with brass stud completely 01 job
iii) supply and fixing New Bushings with Brass stud, Nut, washer oil seal completely 04 Nos set for LT side 01 job
iv) Material and labor for HT insulation Taping with H T !! KV Birla 3 M Insulation 01 No O1 Job.
v) Removing out the Damaged unserviceable Gasket and supply and fixing New neoprene gasket 6 mm thick for HT and Lt ,top cover and bushings Inspection cover, Vent Pipe etc completely 01 job
vi) Re filling of Transformer and checking oil leakages completely 01 job
vii) Toping up the new Transformer Oil for required level 30 liters, MAKE Power/Castrol.
viii) Supply and fixing New Breather assembly with silicajel for arresting the Moisture. 01 job
ix)Testing and commissioning the Transformer with load One job.
TRANSFORMER 250 KVA MAKE ITL AT GUARD ROOM TWO POLE Structure
i) Draining out the Transformer oil to container and kept safely and disconnecting the LT cable connections for replacement of Unserviceable LT bushings completely 01 job
ii)Opening the Top cover of the Transformer and dismantling the damaged Unserviceable Bushing with brass stud completely 01 job
iii)Supply and fixing New Bushings with Brass stud, Nut, washer oil seal complete set 04 Nos 01 job
iv)Removing out the unserviceable Gasket and supply and fixing New neoprene gasket 6 mm thick for LT bushings top cover and Inspection cover etc completely 01 job
v)Material and labor for HT insulation for HT cable Necessary cleaning, preparation for the smooth functioning the Transformer 01 Job
vi)Re filling of Transformer and checking oil leakages completely 01 job
vii)Toping up the new Transformer Oil for required level 40 liters, MAKE Power/Castrol.
viii)Supply and fixing New Breather assembly with silicajel for arresting the Moisture. 01 job
ix)Testing and commissioning the Transformer with load One job
REPAIRS/MAINTENANCE TO V CB 11KV AT SUB station TP Area Decarbonizing/cleaning complete HT 11KV 3 Phase
independent bus bar chamber of HT panel electrification connection completel,HT VCB switch gear Arrangement incoming and outgoing bus bar spout, circuit spout from the bus bar chamber, cleaning with CTC and ensure roper decarbonizing ,refixing the same after applying Becktrol solution to spout, checking all the connections,thitining the nut, bolts thimbles for incoming and out going system complete. Replacement of damaged space heater along with thermostat switches control fuses, epoxy insulators etc. and servicing and greasing to manual charging/spring charging mechanism, line CT s etc reassembling the complete VCB and Testing with load.
LAVANYA ENTERPRISES
SRI SAI BABA AGENCIES
G S ASSOCIATES
SABA ENTERPRISES
Grace Info Systems
ESWAR ENTERPRISES
stage.html
html • 0.03 MB
finance_459195.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .