Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21 LAccepted-AOC | ₹21 L Quoted ₹23.2 L | L1 | Accepted-AOC L1 Vendor |
| 2 | L2₹25.5 LRejected-Finance | ₹25.5 L | L2 | Rejected-Finance Not Admitted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | NIVA-TECH ENGINEERING L1 | SARA INDUSTRY L2 |
|---|---|---|---|---|---|
| 1.00Replacement of Complete Roof Tubes, Spool pieces in Screen tubes, Convection SH tubes and Metal build up in steam drum stub tube in Power Boiler # 4 (The Rate to be quoted rate without GST) | |||||
| 1.01 | Replacement of roof tubes complete in Boiler#4-8330900053 | 1 | LUMPSUM | 17,02,000 ₹17,02,000 Lowest | 18,55,300 ₹18,55,300 |
| 1.02 | Dismantling & Erection of Spool Pieces in screen tubes - Boiler # 4-8330900888 | 52 | NUMBER | 3,970 ₹2,06,440 Lowest | 4,450 ₹2,31,400 |
| 1.03 | Dismantling & Erection of Spool pieces in convection super heater tubes - Boiler # 4-8330900889 | 52 | NUMBER | 4,570 ₹2,37,640 Lowest | 5,150 ₹2,67,800 |
| 1.04 | Metal build up in Steam drum stub tube by welding at roof tube area in Boiler # 4-8330900890 | 52 | NUMBER | 3,310 ₹1,72,120 Lowest | 3,700 ₹1,92,400 |
| Sl.NoBidder Name | |||||
| 1 | NIVA-TECH ENGINEERING (BID ID -1618079) | 19,00,000 | Not Quoted | - | - |
| 2 | SARA INDUSTRY (BID ID -1633895) | 19,00,000 | Not Quoted | - | - |
Tender Value
Refer Docs
EMD Value
₹52,500
Closing Date
23 Feb 2026, 3:00 pmClosed
GM (TOS and Stores)
TOS Kagithapuram
Replacement of Complete Roof Tubes, Spool pieces in Screen tubes, Convection SH tubes and Metal build up in steam drum stub tube in Power Boiler4 at Unit1.
2026_TNPL_651751_1
TNPL/TOS/U1/ 252613007348
Open Tender
Boiler related works
Tender cum Auction
365 days
TOS Kagithapuram
Tenderer should have the experience as per PQ criteria and shall submit the supporting documents for the same.
5 documents required · 5 mandatory
₹0
₹52,500
15 May 2026
9 Feb 2026
24 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
Replacement of Complete Roof Tubes, Spool pieces in Screen tubes, Convection SH tubes and Metal build up in steam drum stub tube in Power Boiler # 4 (The Rate to be quoted rate without GST)
Replacement of roof tubes complete in Boiler#4-8330900053
Dismantling & Erection of Spool Pieces in screen tubes - Boiler # 4-8330900888
Dismantling & Erection of Spool pieces in convection super heater tubes - Boiler # 4-8330900889
Metal build up in Steam drum stub tube by welding at roof tube area in Boiler # 4-8330900890
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Tendernotice_3.pdf
PDF • 0.15 MB
Tendernotice_4.pdf
PDF • 0.20 MB
BOQ_781526.xls
BOQ • 0.35 MB
DATECORRIGENDUM28022026.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].