Tender Value
₹29.4 L
EMD Value
₹29,363
Closing Date
23 Sept 2026, 5:00 pm
RAJAM NAGAR PANCHAYAT
Rajam
Construction of (a) 450mm Vent CC drain from back side of Penki Gowreswarao house to Connecting Existing drain at Ammavari colony 2nd line (b) 450mm Vent CC drain from Dasireddy Venkataramana house to Balla Eswararao house at Ammavari colony 4th line (c) 300mm Vent CC drain from Mavuduri Murali house to Nandigana Dalinaidu house at teachers colony (d) 450mm Vent CC drain from Maturu Venu house to open site at Dwarakanagar 2nd line (e) 450mm Vent Vent CC drain from Singireddy Suryanarayana house to Vantaram srinu house at Dwarakanagar (f) 300 mm Vent CC drain from Padmasri house to Jagannadham house of Ammavari colony 3 rd lane (g) CC drain from Gym Master house backside to old Sachivalayam (h) 450mm Vent CC drain from Suresh house to Maripi Tirupathi Rao house of Defence Colony (i) 450mm Vent CC drain from Anem Srinu house to existing major drain at Opp. Petrol Bunk Vastrapuri colony (j) 300 mm Vent CC drain on both sides from Chelluri Papinaidu house to Batta Bhagyathi house at Bhaga
984449
40/2026-27/E1-RMP
OPEN - NCB
Civil Engineering Works
VIZIANAGARAM, ANDHRA PRADESH
3 documents required · 3 mandatory
₹1,040
₹29,363
5 Sept 2026
5 Sept 2026
5 Sept 2026
Earthwork in excavation for road as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and base filling in trenches with excavated suitable material as per Tech. Specification 305 MORD, 304 MORTH. This rate including cost of all labour charges and other incidental charges etc., complete as per SS and as directed by the departmental officer incharge of work. RBR - EECD - 5 / i (Manual Means)
Collection, supply, spreading of crusher stone dust and rolling with hand roller, watering, consolidated charges, all labour charges, spreading charges etc., complete as per SS and as Directed by Departmental officer incharge of the work for road base. BLD - CSTN-2-8
Vibrated Plain Cement Concrete M20 grade (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (WITH & WITH OUT FORM WORK)Drain Bed-With out Form Work
Drain Side Walls-With Form Work
Removal of Wet Silt and sludge by manual means from sullage drains with aid of baskets and vessels.
Cutting open CC road surface including all labour chrages and othere incidental charges as per SS and as directed by the departmental engineer in charge of the work.
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH BRICK MASONRY WITH CEMENT MORTOR
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH Plain Cement Concrete
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH Reinforced Cement Concrete and prestressed Concrete
Earthwork in excavation for road as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and base filling in trenches with excavated suitable material as per Tech. Specification 305 MORD, 304 MORTH. This rate including cost of all labour charges and other incidental charges etc., complete as per SS and as directed by the departmental officer incharge of work. RBR - EECD - 5 / i (Manual Means)
Collection, supply, spreading of crusher stone dust and rolling with hand roller, watering, consolidated charges, all labour charges, spreading charges etc., complete as per SS and as Directed by Departmental officer incharge of the work for road base. BLD - CSTN-2-8
Vibrated Plain Cement Concrete (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (WITH & WITH OUT FORM WORK)-BED-WITH OUT FORM WORK
Vibrated Plain Cement Concrete (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (WITH & WITH OUT FORM WORK)-SIDE WALLS-WITH FORM WORK
Vibrated Plain Cement Concrete (1:2:4) nominal mix for plain concrete in open foundations using 20 mm graded size hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4-A-V-(i) (WITH & WITH OUT FORM WORK)-QUENET-WITH OUT FORM WORK
Vibrated reinforced cement concrete M 30 using 20 mm graded HBG metal including cost and conveyance of all materials land labour charges for centering, machine mixing, laying, vibrating and curing etc. including all other incidental charges of all T&P etc. for finished item of work as per MoRTH apecifications 1500, 1700, 2100 and 2702 and as directed by the depermental engineers in charge. RBR - FNDN 4 / g for COVER SLABS
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded - BLD - CSTN - 2 / 19.
Vibrated P.C.C. grade M 30 (Design Mix) MORTH 12.8 B using 20 mm graded stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the depermental engineers in charge. RBR-FNDN-4G-F-i-Road Approaches
Providing Gravel Filling in foundations from approved source as per drawing and technical specification this rate including cost and convenyance of materials, damping, watering and all incidental charges etc., complete as per ss and as directed by the departmetnal officer incharge of the work. But excluding seigniorage charges.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT.xlsx
TENDER_DOCUMENT • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .