Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
9 Mar 2026, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB Division
SUMBAL SONAWARI
EMPANELMENT OF CONSULTANTS FOR ARCHITECTURAL AND CONSULTANCY SERVICES FOR VARIOUS BUILDING, BRIDGE / ROAD WORKS OF RandB SUMBAL DIVSION
2026_PWDJK_304358_1
Consultancy NIT NO 86 OF 2025-26 SUMBAL DIVISION
Open Tender
Consultancy
Percentage
365 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Executive Engineer RnB Division
₹50,000
Executive Engineer RnB Division SUMBAL SONAWARI
24 Feb 2026
24 Feb 2026
10 Mar 2026
24 Feb 2026
9 Mar 2026
26 Feb 2026
26 Feb 2026
A. Building Type Structure 1. Conducting detailed topographical & contour survey using Total Station/GPS including mapping of natural & man-made features, contour interval 0.5m (hilly terrain) / 1m (plain area), preparation of site plan in AutoCAD, submission of digital contour map complete. 2. Soil Investigation & Geotechnical Study including boreholes upto required depth, SPT, collection of samples, laboratory testing, determination of safe bearing capacity, settlement analysis, groundwater table assessment and submission of detailed geotechnical report with foundation recommendations. 3.Concept architectural planning including site analysis, initial sketches, space planning and submission of concept plan. 4.Detailed architectural drawings including floor plans, elevations, sections, submission drawings, and approval drawings as per local bylaws complete. 5.3D visualization including exterior views (max 3 views) for presentation purpose. 6.Structural design including foundation design (based on soil report), columns, beams, slabs, staircase, retaining walls, truss/roofing system (if applicable), seismic analysis (as per IS 1893), preparation of detailed structural drawings with reinforcement detailing. Design shall comply with relevant IS codes. Structural calculation sheets (soft copy) must be submitted. Consultant responsible for design adequacy. 7.Electrical design including load calculation, layout plans, SLD, earthing plan complete. 8.Plumbing & sanitation design including water supply, drainage layout & septic/STP planning (if required). 9. Preparation of Detailed Project Report including project background, architectural & structural drawings, cost estimate based on latest SOR, detailed BOQ, specifications, bar chart/PERT chart, scheme compliance note, and compilation of all documents for submission to competent authority 10. Preparation of Preliminary Detailed Project Report (Pre-DPR) for building project including site reconnaissance, preliminary Total Station / GPS survey (where required), contour mapping, concept architectural layout, preliminary space planning, identification of structural system (RCC / Steel / Truss roofing etc.), approximate foundation type based on nearby soil data or limited trial pits (if available), rough quantity take-off, preparation of abstract cost estimate based on prevailing SOR, preliminary BOQ, concept drawings(plans & elevations), bar chart/PERT chart, scheme compliance note, and submission of Pre-DPR to competent authority for administrative approval complete.
B.Road Type 1. Conducting detailed geotechnical investigation for road alignment including preliminary site econnaissance, drilling of boreholes upto required depth (minimum 10m or till hard strata), conducting SPT at regular intervals, collection of disturbed & undisturbed samples, laboratory testing (CBR, grain size, Atterberg limits, shear parameters, etc.), determination of safe bearing capacity, slope stability analysis (where applicable), groundwater table assessment, and submission of comprehensive geotechnical report with pavement & foundation design recommendations complete in all respects. Borehole spacing and slope stability shall be as per IRC guidelines.Payment shall be made only after submission of signed geotechnical report with lab test certificates 2. Conducting detailed topographical survey using Total Station/GPS including alignment fixing, contour mapping (max 0.5m interval in hilly terrain), preparation of L-Section, cross-sections at 20m interval (or closer in difficult terrain), identification of utilities, preparation of KML file, submission of AutoCAD drawings & soft copies complete.In hilly / snow-bound / difficult terrain, cross-sections must reflect actual slope. 3. Conducting classified traffic survey (minimum 7 days), axle load data collection (if required), traffic growth projection, and preparation of traffic analysis report. 4.Design of minor cross drainage works (culverts upto 6m span) including hydraulic calculation, structural design & drawings complete. Designs must reference relevant IRC codes. Soft copy of design calculations shall be submitted. Consultant responsible for design adequacy. 5. Preparation of Detailed Project Report including project background, survey findings, design basis report, detailed cost estimate (SOR-based & non-SOR analysis), BOQ, structural drawings, technical specifications, environmental considerations, bar chart/PERT chart, and scheme compliance (NABARD/CRIF/PMGSY etc.) complete for submission to competent authority. 6. Preparation of tender documents including NIT, bid document, eligibility criteria, and technical specifications.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_988661.xls
BOQ • 0.42 MB
consextension.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .