Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
29 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Conversation of AC Plants and Refrigeration Plants from R22 to 407C Gas System on MODU SAGAR BHUSHAN
2022_HSL_91155_1
20 / 22005 / 121 / AC and REF / 2022-23
Open Tender
Miscellaneous Services
Service
30 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹840
Yes
HSL
₹90,000
Yes
13 Oct 2022
16 Sept 2022
29 Sept 2022
16 Sept 2022
29 Sept 2022
16 Sept 2022
Amount
ACCOMMODATION AC COMPRESSOR: AC COMPRESSORS NO: 1, 2 AND 3: CAPACITY :120 TON, MAKE: CARRIER, MODEL: 5H-120. ALL THE 3 COMPRESSOR TO BE REMOVED FROM THE POSITION,SHIFTED TO WORKSHOP,OVERHAULED AND RE-INSTALLED. JOB IS INCLUDING REPLACEMENT OF ALL PRESSURE SWITCHES, TEMPERATURE GAUGES AND PRESSURE GAUGES AS REQUIRED, ALL SAFETY CUT OUT TO BE TESTED, ALIGNMENT TO BE CARRIED OUT AND SATISFACTORY TRIAL OF 72 HOURS SHOWNEDTO SHIPSTAFF. SPARE LIST IS ATTACHED AS ANNEXURE E01 WILL BE SUPPLIED BY RIG, OTHER SPARES AND CONSUMABLES IS PROCURE,SUPPLY AND FITMENT IN CONTRACTOR SCOPE.
AC COMPRESSOR NO 1 & 2 COUPLING SET TO BE REPLACED. PROCURMENT OF COUPLING SET ARE IN CONTRACTOR SCOPE.
AC COMPRESSOR NO 1,2 &3 FOUNDATION VIBRATION PADS TO BE REPLACED. PROCURMENT OF VIBRATION PADS ARE IN CONTRACTOR SCOPE.
AC CONDENSER: AC NO 1, 2 & 3 CONDENSERS TO BE REMOVED FROM PLACE,SHIFTED TO WORKSHOP,OVERHAULED,CHEMICALLY CLEANED,PRESSURE TESTED WITH NITROGEN GAS(AT 35 KG),IF ANY TUBING FOUND LEAKING, SAME SHOULD BE BLOCKED WITH PROPER PLUGS AND AGAIN PRESSURE TESTED, SHOWN TO SHIP STAFF,FITTED BACK IN POSITION WITH NEW ZINC ANODES,SS FATENERS AND JOINTS. ALL CONSUMABLES, BRAZING RODS, SS FASTENERS,ZINC ANODES,DRAIN COCKS,CHEMICALS,COPPER PLUGS ARE PROCURE, SUPPLY AND FITMENT IN CONTRACTOR SCOPE.SATISFACTORY TRIALS TO BE SHOWNED.
CONDENSER END COVERS BOTH SIDE TO BE REPLACED (MATERIAL-SS).PROCURE,SUPPLY AND FITMENT OF CONDENSER END COVERS ARE IN CONTRACTOR SCOPE.
AC COMPRESSOR OIL SEPARATOR: A.C COMPRESSOR OIL SEPARATOR 1, 2 AND 3 TO BE OVERHAULED.FLOAT ASSEMBLY TO BE OVERHAULED.ALL CONSUMABLES AND SPARES ARE PROCURE, SUPPLY AND FITMENT IN CONTRACTOR SCOPE.SATISFACTORY TRIALS TO BE SHOWNED.
AC SYSTEM TRIALS: AFTER INSTALLATION, THE TROUBLEFREE RUNNING OF WHOLE ACCOMODATION AC UNIT FOR 72 HOURS ON FULL LOAD SHALL BE DEMONSTRATED TO SHIP REPRESNTATIVES.ALL COMPRESSORS, CONDENSORS AND AHU SHALL BE TAKEN IN LINE WHILE DOING SO. VIBRATIONAL ANALYSIS AND CONDITIONAL MONITORING OF THE UNIT TO BE CHECK WHILE RUNNING ON FULL LOAD DURING TESTING, SHALL BE DONE BY CERTIFIED AGENCY. IF ANY DEFICIENES SHALL BE RECTIFIED. THE CERTIFICATES OF THE SAME SHALL BE HANDED OVER TO ONGC.
REF PLANT NO 1 AND 2 COMPRESSORS: MAKE: DAIKIN, MODEL: 4C552AF REF COMPRESSORS( 1 AND 2) TO BE REMOVED FROM THE POSITION,SHIFTED TO WORKSHOP,OVERHAULED AND RE-INSTALLED. JOB IS INCLUDING REPLACEMENT OF ALL PRESSURE SWITCHES, TEMPERATURE GAUGES AND PRESSURE GAUGES AS REQUIRED, ALL SAFETY CUT OUT TO BE TESTED, ALIGNMENT TO BE CARRIED OUT AND SATISFACTORY TRIAL OF 72 HOURS SHOWNEDTO SHIPSTAFF. SPARE LIST IS ATTACHED AS ANNEXURE E03 WILL BE SUPPLIED BY RIG, OTHER SPARES AND CONSUMABLES IS PROCURE,SUPPLY AND FITMENT IN CONTRACTOR SCOPE.
REF PLANT NO 1 AND 2 CONDENSERS: REF PLANT NO 1 AND 2 CONDENSERS TO BE REMOVED FROM PLACE,SHIFTED TO WORKSHOP,OVERHAULED,CHEMICALLY CLEANED,PRESSURE TESTED WITH NITROGEN GAS(AT 35KG),IF ANY TUBING FOUND LEAKING, SAME SHOULD BE BLOCKED WITH PROPER PLUGS AND AGAIN PRESSURE TESTED, SHOWN TO SHIP STAFF,FITTED BACK IN POSITION WITH NEW ZINC ANODES,SS FATENERS AND JOINTS. ALL CONSUMABLES, BRAZING RODS, SS FASTENERS,ZINC ANODES,DRAIN COCKS,CHEMICALS,COPPER PLUGS ARE PROCURE, SUPPLY AND FITMENT IN CONTRACTOR SCOPE.SATISFACTORY TRIALS TO BE SHOWNED.
CONDENSER INLET OUTLET VALVES TO BE REPLACED( GLOBE VALVE).VALVES PROCURE,SUPPLY AND FITMENT IN CONTRACTOR SCOPE
ACCOMMODATION A/C AHU: AHU COOLING COILS TO BE REMOVED FROM PLACE,SHIFTED TO WORKSHOP,OVERHAULED,CHEMICALLY CLEANED,PRESSURE TESTED WITH NITROGEN GAS,SHOWNTO SHIP STAFF,FITTED BACK IN POSITION,SYSTEM TO BE FLUSHED. (TESTING AT 10 KG/CM2)
INLET AIR AND OUTLET AIR TEMPERATURE GAUGE TO BE REPLACED (2 NOS EACH, 0-50 DEG CELSIUS, ADAPTER 1/2" INCH).PROCURMENT OF TEMPERATURE GAUGES WITH ADAPTERS ARE IN CONTRACTOR SCOPE.
AHU FOUNDATION ANTI VIBRATION PADS TO BE REPLACED (12 NOS/AHU). PROCURMENT OF ANTI VIBRATION PADS WITH FASTENERS ARE IN CONTRACTOR SCOPE.
AHU BLOWER DYNAMIC BALANCING TO BE CARRIED OUT AND TEST CERTIFICATE TO BE PROVIDED.
AHU BLOWER PULLEY AND MOTOR PULLEY TO BE REPLACED.PROCURMENT OF BLOWER PULLEY AND MOTOR PULLEY ARE IN CONTRACTOR SCOPE.
ALL AHU EXPANSION VALVES TO BE REPLACED( 4 PER/AHU).MAKE: EMERSON MODEL: SUITABLE FOR 404A GAS ,PROCURMENT OF EXPANSION VALVES ARE IN CONTRACTOR SCOPE.
AHU SHUT OFF VALVES TO BE OVERHAULED & PRESSURE TESTED,FITTED BACK AND SHOWN TO SHIP STAFF.
MAGNETIC VALVES TO BE REPLACED.MAKE-ELOMEK.PROCURMENT OF MAGNETIC VALVES ARE IN CONTRACTOR SCOPE.
CONVERSION OF AC PLANT FROM R-22 GAS TO 407C GAS: ACCOMMODATION AC PLANT HAVING THREE UNITS OF COMPRESSORS & THREE UNITS OF AHU'S. JOB TO BE CARRIED OUT AS PER SCOPE OF WORK MENTIONED IN ANNEURE-A. COMPLETE MATERIAL REQUIRED FOR SATISFACTORY PROVING OF THE SYSTEM TO BE SUPPLIED BY THE CONTRACTOR AND SATISFACTORY OPERATION TRIALS TO BE SHOWN TO HSL / SHIP STAFF.
CONVERSION OF REFRIGERATION PLANT FROM R-22 GAS TO 407C GAS: REFRIGERATION PLANT HAVING TWO UNITS OF COMPRESSOR AND COLD ROOM HAVING COMPARTMENTS VEGETABLE ROOM, MEAT ROOM & LOBBY. JOB TO BE CARRIED OUT AS PER SCOPE OF WORK MENTIONED IN ANNEURE-A. COMPLETE MATERIAL REQUIRED FOR SATISFACTORY PROVING OF THE SYSTEM TO BE SUPPLIED BY THE CONTRACTOR AND SATISFACTORY OPERATION TRIALS TO BE SHOWN TO HSL / SHIP STAFF.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .