Divisional Engineer/East/Palakkad section: Left over works in connection with : CTR (P) 23.293 Km (between PTJ-SRR, SRR-CLT) such as provision for ballasted track for a total length of 0.800 Km duly demolishing existing damaged CC apron at Rd No.4 of PGT yard ( Km 533.800-534.600 (on B line)) and RCC side drain for a length of 800 mtrs.
PGT-Works-2026-N01-02
PGT-Works-2026-N01-02
Open
6 Months
Palakkad, Kerala
₹0
₹2.1 L
28 Jan 2026
28 Jan 2026
5 Feb 2026
converting to ballasted track.- USSOR items
PGT yard Rd 4 - CTR (P) 0. 800 Km duly demolishing exg damaged CC apron and converting to
ballasted track.- USSOR items
S No. Item Description of Item Unit Qty Rate Amount
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
2 065020 Renewal of existing SEJ with improved SEJ with Set 2.00 10318.13 20636.26
PSC sleepers under traffic block conditions as per
approved drawing including fixing of special size
bearing plate, rubber pad and other sleeper / rail
fittings, greasing to the fittings, leading rails,
sleepers & fittings to site, leading and stacking of
released materials within a lead of 250m, cutting
of Rails, drilling of holes, fixing of related fittings,
providing temporary connection with fishplates till
welding of SEJ is done and sleepers shall be given
initial packing to make track fit for 20KMPH speed.
Note: (1) Rail cutting and hole drilling shall be
paid separately. (2) One set comprise complete
SEJ on both rails at SEJ.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
3 083010 Lifting and packing for regrading the existing PSC TRM 800.00 211.20 168960.00
sleeper track to required height / level in stages
not exceeding 75mm or part thereof at a time,
providing permissible ramp for the track, insertion
of moorum / sand / stone ballast uniformly under
the existing track and placing the same to safe
approved gradient, gauge, cushion including
levelling and one round of through packing to
allow train movement at restricted speed of 30
kmph for a specified length with all leads & lifts
and fixing, marking, painting rail level pegs at
every 30m interval. Note: Lifting of track shall be
done in stages as per procedure prescribed in
latest edition of IRPWM to get the proposed final
level as per approved working profile, as directed
by Engineer in-charge.
4 083011 Extra for additional lift over 75mm for every TRM 2400.00 32.79 78696.00
50mm lift or part thereof up to 275mm for item
nos. 083010 for each TRM.
5 083030 Boxing and profiling of ballast as per procedure TRM 800.00 31.04 24832.00
prescribed in latest edition of IRPWM including
cess dressing on both sides of track. The work will
include removing excess ballast from track and
putting the same in crib and shoulder by leading
to a maximum of 50m including crossing of track,
deweeding on ballast section etc and as directed
by Engineer-In charge.
6 092030 25mm gap 'in-situ' welding during traffic block Each 32.00 1997.27 63912.64
using Railway's welding portion & Welder and
finishing of weld to meet the prescribed
tolerances and pass all stipulated tests with all
required labour, materials, consumables, tools,
equipments etc. to complete the work in all
respect as per IR's "Manual for Fusion Welding of
Rails by Alumino - Thermic Process" with latest
correction slips, including marking of welded joint,
painting weld collar with anticorrosive paint,
restoration of track near weld joint to original
position and fixing of joggled fish plate at new
weld, to be removed after passing of weld in USFD
test as directed by Engineer in charge. Note: 1.
Only welding portion and related accessories as
per Annexure - I and Welder shall be supplied by
Railways. 2. Hydraulic Weld trimmer shall be used
for chipping and profile Grinder for finishing. 3.
Required nos. of Joggled fish plates shall be
supplied by Railway at nearest P. Way Stores and
the same shall be returned at nearest P. Way
Store or at other location as per direction of
Engineer-in-Charge after release from track.
7 121010 Dismantling of existing LWR/SWR track of any TRM 800.00 249.73 199784.00
structure, removing rails, sleepers, fish plates,
cutting of rails, segregation and stacking of
released Rails, Sleepers and fitting at nominated
location in countable manner within a free lead of
500m, levelling of ballast to correct profile for
laying new track over it, all as per direction of
Engineer-in-Charge.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Linking of BG track (except at LC, Bridges and
SEJs) with any type of rail section and sleeper of
specified density, on ballast bed spread and
compacted with suitable roller, over prepared
formation including leading free rails/welded
panels available along the alignment on to
formation, leading and spreading all fittings and
fastenings, spreading of sleepers at specified
spacing, squaring, placing of rails over sleepers
and fixing rails to sleepers with all types of fittings
and fastenings to correct gauge & alignment,
lubrication of fittings and fastenings with
contractor's grease as per IRPWM standards with
contractors labour, tools, consumables, with all
lead, lifts etc. complete and raising, levelling and
initial packing of track to make it fit for 30 kmph
and meet other prerequisites prescribed in Indian
Railway Track Machine Manual for deployment of
Tamping Machine. Note: 1.Rail cutting and Hole
drilling shall be paid separately. 2.Spreading of
ballast and compaction shall be paid separately
under relevant item.
8 123041 For sleeper density of 1660 sleepers per km TRM 800.00 399.07 319256.00
First or Second Through Packing of track of all
sleeper density including giving a general lift, as
desired to eliminate sag after Deep Screening
work, lifting of track, lowering of track and major
realignment of curves and formation
rehabilitation as per procedure prescribed in
latest edition of IRPWM. Note: General lift is
normally 25 mm and isolated lift may be up to 50
9 131032 For PSC Sleeper Track with Sleeper Density of TRM 800.00 162.51 130008.00
De-stressing of LWR/CWR track of any density
under traffic line block with contractor's labours,
tools, equipments and consumables inclusive of
all lead & lift. Activities include cutting of
LWR/CWR into convenient panels of specified
length, removal of ERCs, liners, greasing of ERCs
and liner contact area, lifting rails and keeping
them on rollers provided at every 15 sleepers,
working out elongation of rail ends depending on
prevailing site conditions, pulling rails with the
help of Hydraulic Tensor to achieve the desired
elongation, cutting rails, as required, removing
rollers and placing rail in position, re-fixing ERCs
& liners and adjustment of gap at SEJs : Note: (1)
Welding of rail joints will be paid separately. (2)
Rail cutting and Hole drilling shall be paid
separately. (3) Opening and closing of LC if
required will be paid separately. (4) As per
procedure prescribed in latest edition of IRPWM &
CE's Circulars for destressing of LWR/CWR, if any.
10 135012 With Contractor's Hydraulic Rail tensor TRM 800.00 63.34 50672.00
11 136060 Replacing existing glued joint rail with cut rails or Each 2.00 2174.67 4349.34
with glued joint rail or insertion of glued joint by
cutting existing track under traffic condition by
cutting rails, refixing with all rail sleeper
fastenings and providing required gaps for
carrying out welding as an alternative to drilling
holes or joining rails with fish plates duly drilling
holes as required including stacking of released
material and as directed by engineer in-charge.
Note: (1) Drilling holes & rail cutting will be paid
separately. (2) Transportation of materials to the
site of work from supply points, if more than
250m, shall be paid separately.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Anti-corrosive painting of rail outside track on rail
bottom, web, foot and fishing plane with two
coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation, as a
complete job as per procedure prescribed in latest
edition of IRPWM.
Quick cutting with abrasive rail cutter of all types
of rail sections including wear resistant, head
hardened rails up to 110 UTS, with contractors
tools & plants, equipment, consumable with all
lead & lift etc. complete as directed by Engineer
in-charge. Abrasive Rail Cutter will be as per
RDSO Specification No. TM/SM/1 (Rev. 01 of 2012)
with latest status of RDSO; Rail Cutting Wheel
Abrasive Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
Drilling holes of 16 mm to 32 mm dia. with Rail
Drilling machine including chamfering with
appropriate chamfering tools in all types of rail
section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge. Rail
Drilling Machine will be as per RDSO Specification
No. TM/SM/3, dated 24.04.1991.
15 161050 Drilling holes of specified size for bond holes with Each 128.00 57.90 7411.20
7.2mm dia drill twist to correct spacing and
location on 60kg/52kg rails on cess or under
traffic block with contractor's tools and plant,
equipment, consumable, labour etc complete as
directed by the Engineer in charge at site.
Loading of tongue rail, stock rail, switch assembly
and crossings of any section and length, SEJ,
Glued joint etc. with / without P.Way fittings and
fastenings, in Wagon / Truck / trailer including
lead up to 250 metre and lift up to 5 metre.
16 171024 I n Wagon where mechanical handling is possible MT 8.00 158.01 1264.08
and traffic block is not required or in Truck/trailer.
Unloading of all type of rails of length 130 metre
and beyond from end unloading rake and keep
the panels in head-up position at specified
distance from centre of track clear from any
infringement.. Note: Contractor has to keep
Oxygen and Acetylene gas with cutter as standby
during the period of work.
Loading, leading and unloading of PSC Sleepers of
52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to
the nominated location under traffic in case road
carriage is not possible for different leads and lift
up to 5 metres.
contractor's Rail Dolly/Dip Lorry.
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
m a t e r i a l except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road vehicles
for different leads. Note: Lead shall be the
shortest motorable road length between the
points of loading and unloading.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
23 172048 Extra for every Km per MT beyond 150 Km over MT-Km 3500.00 3.82 13370.00
item no. 172047
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road vehicles
for different leads. Note: 1 . Lead shall be the
shortest motorable road length between the
points of loading and unloading. 2. Loading and
unloading shall be paid extra under relevant
27 172058 Extra for every Km per MT beyond 150 Km over MT-Km 3600.00 3.82 13752.00
item no. 172057
Unloading of Switches / Crossings / SEJ Rails /
Glued Joints of any rail section and length with or
w i t h o u t P.Way fittings & fastenings in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with lead up to 250 metre & lift up to
Collection, segregation and stacking of various
scattered P.Way materials at nominated stacking
location with serviceable and un-serviceable ones
separately within a lead up to 500 metre and lift
up to 5 metre including crossing of track(s)
wherever necessary as directed by Engineer-in-
29 173031 Rails, switches, crossings, SEJ, Glued Joints, Check MT 18.00 596.44 10735.92
30 173033 P.Way fittings of all types and other similar loose MT 8.00 457.03 3656.24
Hiring of machinery for minor miscellaneous
works for short duration including operator/driver,
fuel, lubricants and consumable. The contractor
shall arrange all statutory permits as required by
rules and regulations prevailing in the area of
work. Payment shall be made for actual working
31 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 100.00 975.39 97539.00
minimum 1.10 cum bucket capacity
Item Breakup - A-Provision for RCC side drain at PGT yard (800 mtrs)-DSR items
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Notesforschedule.pdf
ATTACHMENT
RDSODirectivesonATWeld.pdf
ATTACHMENT
AnnexureA-OT-01-02.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
providentFundstt.pdf
ATTACHMENT
Acs1to10.pdf
ATTACHMENT
ANNEXUREVNEWasperACS4.pdf
ATTACHMENT
AnnexureVaaspercorrectionslip2GCC2022.pdf Annexure V a
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
AnnexureVI-B.pdf
ATTACHMENT
AnnexureB-1.pdf
ATTACHMENT
CheckListandNEFTform.pdf
ATTACHMENT
Guidelinesforprotectionofcables.pdf
ATTACHMENT
Annexure.C6.pdf
ATTACHMENT
eBGaccountno..pdf
ATTACHMENT
E-TENDERNOTICE-PGT-OT-01-2026.pdf
ATTACHMENT
AnnexureVaaspercorrectionslip2GCC2022.pdf
ATTACHMENT
Download all tender documents and submit your bid