Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L I₹48.1 LAccepted-AOC | L I | Accepted-AOC Lowest One | |
| 2 | L 2₹53.4 LRejected-Finance | L 2 | Rejected-Finance As per NIT criteria | |
| 3 | L 3₹63.3 LRejected-Finance | L 3 | Rejected-Finance As per NIT criteria | |
| 4 | Rejected-Technical | - | Rejected-Technical As per NIT requirement | |
| 5 | Rejected-Technical | - | Rejected-Technical As per NIT requirement |
Tender Value
₹67.4 L
EMD Value
₹1.3 L
Closing Date
24 Feb 2020, 6:00 pmClosed
Assistant General Manager Engg-Elect
Assistant General Manager Engg Elect, AAI, Tirupati Airport, Renigunta 517 520
ARMO of EM Installations at Tirupati airport SH Operation Comprehensive Annual Maintenance Contract of HVAC ic AHUs at NITB Tirupati Airport for the period of 2 years at Tirupati Airport Year 2020 to 2022
2020_AAI_42099_1
AAI/TPT/ENGG(E)/M-17/2019-20
Open Tender
AMC/ Maintenance Contracts
Item Rate
730 days
Tirupati Airport
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,180
Yes
Airports Authority of India
₹1.3 L
Yes
1 Sept 2020
5 Feb 2020
28 Feb 2020
6 Feb 2020
24 Feb 2020
12 Feb 2020
6 Feb 2020 - 11 Feb 2020
Amount
Operation and maintenance of entire HVAC system having centralised plant of 3 Nos. X 350 TR capacity water cooled Centralised AC Plant along with all its related equipments and associated accessories as per the list attached in the Annexure -I of Particular Specifications etc. installed at NITB, in shifts of operation as per the need basis on all days including Sunday and public holidays etc. complete as required as per the terms and conditions of the contract.
Comprehensive maintenance of entire high side and low side HVAC system having centralised plant of 3 Nos. X 350 TR capacity water cooled centrifugal chillers of Carrier Make including supply and fixing / repair / replacement of defective components, supply and charging of oil and refrigerant as and when required, carrying out preventive and breakdown maintenance as per manufacturer's & AAI guidelines, troubleshooting of faults , providing all replacement spares & consumables, maintenance of records/documentation etc as per terms and condtitions of contracts complete as required. Inspection to be carried out through OEM who got manufacturing facility of similar capacity of Chiller as approved by the engineer in charge once in a month for High side system chillers.
First Year
Second Year
PAN POLAR ENGINEERS PVT. LTD.
V Save Electronics Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .