| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | ₹6.2 L Quoted ₹5.3 L | L1 | Accepted-AOC Lower Rate |
| 2 | L2₹5.5 L+₹22,872.41 (4.32%)Rejected-Finance | ₹5.5 L+₹22,872.41 (4.32%) | L2 | Rejected-Finance Biderr is not lowest one. |
| 3 | L3₹5.8 L+₹52,541.74 (9.94%)Rejected-Finance | ₹5.8 L+₹52,541.74 (9.94%) | L3 | Rejected-Finance Biderr is not lowest one. |
| 4 | L4₹6.3 L+₹1.1 L (19.9%)Rejected-Finance | ₹6.3 L+₹1.1 L (19.9%) | L4 | Rejected-Finance Biderr is not lowest one. |
| 5 | L5₹6.4 L+₹1.1 L (20.1%)Rejected-Finance | ₹6.4 L+₹1.1 L (20.1%) | L5 | Rejected-Finance Biderr is not lowest one. |
| Sl No | Description | Qty | Unit | RANVEER SINGH L1 | RAM PRASAD BHATT L5 | SANDEEP PRASAD L4 | RAJPAL SINGH L6 | SHIVRAJ SINGH L2 | RAJESH THAPLIYAL L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 102.03 | Cum | 323 ₹32,955.69 Lowest | 388 ₹39,587.64 | 386.34 ₹39,418.27 | 411 ₹41,934.33 | 334.14 ₹34,092.3 | 350 ₹35,710.5 |
| 2.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD | 105.17 | Cum | 3,163 ₹3,32,652.71 Lowest | 3,795 ₹3,99,120.15 | 3,792.8 ₹3,98,888.78 | 4,300 ₹4,52,231 | 3,280.32 ₹3,44,991.25 | 3,500 ₹3,68,095 |
| 3.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 , Nominal mix 1:2.4 (Hand mixing) | 6 | Cum | 5,456 ₹32,736 Lowest | 6,592 ₹39,552 | 6,589.02 ₹39,534.12 | 7,700 ₹46,200 | 5,698.86 ₹34,193.16 | 6,000 ₹36,000 |
| 4.00 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 195 | Sqm | 66.7 ₹13,006.5 Lowest | 81 ₹15,795 | 79.62 ₹15,525.9 | 100 ₹19,500 | 68.86 ₹13,427.7 | 70 ₹13,650 |
| 5.00 | Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 | 180 | Sqm | 152.8 ₹27,504 Lowest | 185 ₹33,300 | 183.39 ₹33,010.2 | 280 ₹50,400 | 175.93 ₹31,667.4 | 180 ₹32,400 |
| 6.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 38.17 | Cum | 1,858 ₹70,919.86 Lowest | 2,231 ₹85,157.27 | 2,228.55 ₹85,063.75 | 2,500 ₹95,425 | 1,927.47 ₹73,571.53 | 2,000 ₹76,340 |
| 7.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 , Nominal mix 1:3.6 (Hand mixing) | 3.3 | Cum | 4,937.6 ₹16,294.08 Lowest | 5,922 ₹19,542.6 | 5,919.74 ₹19,535.14 | 6,800 ₹22,440 | 5,120 ₹16,896 | 5,000 ₹16,500 |
| 8.00 | Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications).As per Item No. As per Item No. 1-5 | 3.37 | Cum | 825.2 ₹2,780.92 | 993 ₹3,346.41 | 989.07 ₹3,333.17 | 1,200 ₹4,044 | 855.44 ₹2,882.83 | 800 ₹2,696 Lowest |
Tender Value
₹8.0 L
EMD Value
₹24,000
Closing Date
15 Mar 2025, 1:00 pmClosed
EE ID RUDRAPRYAG
EXECUTIVE ENGINEER I.D RUDRAPRAYAG
Renovation of 9.6 km and construction of 6.4 km new Offshoot in 17 hill canals of Block Jakholi District Rudraprayag. ( Kot Jakhwari Minor).
2025_IRDCE_80894_1
03/eerpg17/24-25
Open Tender
Civil Works
Item Rate
180 days
JAKHOLI BLOCK
AS PER BIDDING DOCUMENT
5 documents required · 5 mandatory
₹1,180
EXECUTIVE ENGINEER IRRIGATION DIVISION RUDRAPRAYAG
₹24,000
Yes
O/O EE ID RPG
21 Aug 2025
3 Mar 2025
17 Mar 2025
3 Mar 2025
15 Mar 2025
3 Mar 2025
3 Mar 2025 - 4 Mar 2025
4 Mar 2025
Amount
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 , Nominal mix 1:2.4 (Hand mixing)
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 , Nominal mix 1:3.6 (Hand mixing)
Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications).As per Item No. As per Item No. 1-5
SHIVRAJ SINGH (BID ID -365860)
RAJESH THAPLIYAL (BID ID -366203)
SANDEEP PRASAD (BID ID -365948)
RAM PRASAD BHATT (BID ID -366142)
RAJPAL SINGH (BID ID -364700)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .