Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance BAGH I ALI MARDAN KHAN NOWSHERA SRINAGAR J K 190011 | SRINAGAR | JAMMU AND KASHMIR | 190011 | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹7,267.20 (1.38%)Admitted-Finance | ₹5.3 L+₹7,267.20 (1.38%) | L2 | Admitted-Finance |
| 3 | L3₹6.1 L+₹84,000 (16.0%)Admitted-Finance 15 NEW IDDGAH BUILDINGS NH BARAMULLA BARAMULLA JAMMU KASHMIR 193101 | BARAMULLA | JAMMU AND KASHMIR | 193101 | ₹6.1 L+₹84,000 (16.0%) | L3 | Admitted-Finance |
| 4 | L4₹6.4 L+₹1.1 L (21.4%)Admitted-Finance SARCH GANDERBAL J K 191131 | GANDERBAL | JAMMU AND KASHMIR | 191131 | ₹6.4 L+₹1.1 L (21.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S P.M.T INDUSTRIES L1 | PINK ENGINEERING CORPORATION L2 | NEW AHANGER ENGINEERING WORKS L4 | NSCOO ENGINEERING PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing and fitting of 25mm dia hemp core multi stranded steel wire ropes of standard make (certificate for conformance to IS: 2266 by the manufacturer to be submitted by the contractor) to all the three Forebay gates. The job includes dismantling of old wire rope, fixing of new rope with heated lead and tin into the ropе socket. All tools and tackles shall be included in the job. Applying cadmium compound to the newly fixed wire rope and balancing of the gate and commissioning for smooth drive of the gate. | 540 | Mtr | 550 ₹2,97,000 Lowest | 900 ₹4,86,000 | 680 ₹3,67,200 | 950 ₹5,13,000 |
| 2.00 | Providing and fitting of gate pulleys 24 STD along with spacers with ID 155 mm and brass/gunmetal bush 10 mm thick and along with pin as per sample. The job includes dismantling of old damaged pulleys and fabrication of working platform for the same | 6 | no’s | 38,000 ₹2,28,000 | 7,711.2 ₹46,267.2 Lowest | 45,000 ₹2,70,000 | 16,000 ₹96,000 |
Tender Value
₹6.5 L
EMD Value
₹12,960
Closing Date
13 Jun 2026, 4:00 pmClosed
Executive Engineer
Executive Engineer GD LJHP
Complete overhauling of Forebay gates including replacement to pulleys and replacement of steel wire rope at LJHP Baramulla.
2026_SPDC_310475_1
NIT no. 05 of 2026-27 dated 20-05-2026
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
60 days
Gantmulla Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Chief Pay And Accounts Officer Baramulla
₹12,960
Yes
Online
4 Jul 2026
21 May 2026
15 Jun 2026
21 May 2026
13 Jun 2026
30 May 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fitting of 25mm dia hemp core multi stranded steel wire ropes of standard make (certificate for conformance to IS: 2266 by the manufacturer to be submitted by the contractor) to all the three Forebay gates. The job includes dismantling of old wire rope, fixing of new rope with heated lead and tin into the ropе socket. All tools and tackles shall be included in the job. Applying cadmium compound to the newly fixed wire rope and balancing of the gate and commissioning for smooth drive of the gate. | - | Mtr | - | - |
| 2 | Providing and fitting of gate pulleys 24 STD along with spacers with ID 155 mm and brass/gunmetal bush 10 mm thick and along with pin as per sample. The job includes dismantling of old damaged pulleys and fabrication of working platform for the same | - | no’s | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TDforOverhaulingofforebaygates.pdf
Tender Documents • 1.20 MB
BOQ_1004316.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .