Tender Value
₹76.2 L
EMD Value
₹1.5 L
Closing Date
23 Sept 2026, 4:00 pmDue today
Executive Engineer PMGSY Division Rajouri
Executive Engineer PMGSY Division Rajouri
Permanent Restoration of road from Chowki Handan to Ganya
2026_JKRRD_149482_3
EE/PMGSY/R/31 of 2026-27 Dated 11.09.2026
Open Tender
Services
Percentage
60 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,500
Executive Engineer PMGSY Division Rajouri
₹1.5 L
Executive Engineer PMGSY Division Rajouri
23 Sept 2026
12 Sept 2026
25 Sept 2026
12 Sept 2026
23 Sept 2026
12 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavating for structure as per drawing and technical specification clause 301.2 including setting out construction of shoring and bracing, removal of slumps and other delirious material and disposal up to a lead of 50mts dressing of sides and bottom and back filling in trenches with excavate suitable material including dewatering if any up to 3mts depth in AKS(50 % Ordinary Soil, 30 % Ordinary Rock, 20 % Hard Rock) | 821.25 | Cum | 515.68 | ₹4,23,502.2 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 85.5 | Cum | 4,826.5 | ₹4,12,665.75 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 with 15% boulders (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 605.53 | Cum | 5,014.24 | ₹30,36,272.75 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 19.17 | Cum | 7,275.25 | ₹1,39,466.54 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,683.8 | Kg | 123.2 | ₹3,30,644.16 |
| 6 | Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete Cement mortar 1:6 (1 Cement : 6 coarse sand) | 310.8 | Cum | 5,402.9 | ₹16,79,221.32 |
| 7 | Polygonal/Random Rubble Masonry Laid Dry uncoursed brought to course in foundation and plinth With bond stone . | 106.37 | Cum | 3,262.1 | ₹3,46,989.58 |
| 8 | Providing and laying Coping/flooring 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 259.5 | Sqm | 416.5 | ₹1,08,081.75 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings etc. mass concrete.
Foundations, footings, bases for columns | 842.48 | Sqm | 286.35 | ₹2,41,244.15 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings etc. mass concrete.
for Suspended floors, roofs, landings, balconies and access platforms. | 58.5 | Sqm | 718.2 | ₹42,014.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_235614.xls
BOQ • 6.98 MB
extension.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .