Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹2,970
Closing Date
13 Jul 2026, 11:30 amClosed
Superintending Engineer
SE Environment, Dr.NTTPS
Dr.NTTPS Carrying out DE silting operations in C W Canal using Dredger conver 90 for the year 2026 27 up to 30.09.2026
957246
e-04/26-27/SE/C/Envt/Dr.NTTPS
OPEN - NCB
Civil Engineering Works
NTR
12 documents required · 10 mandatory · 2 optional
₹211
₹2,970
11 Jul 2026
2 Jul 2026
13 Jul 2026
13 Jul 2026
Labour charges for carrying out desilting operations in CW canal with dredger Conver-90 for removing of silt, sand,debris,natchu &algae from the bed of CW canal from 0.00KM to Y-junction loading the silt on to the punt kept on water surface, unloading, lifting of silt or slush and sand etc. from the punts & dumping in the nearby low lying areas/dumping areas earmarked for the purpose, with a lead upto 50m and a lift of 8m including night watchman for watch & ward of dredger, all labour charges, operations, movement of dredger & pulling of punts, hire charges of all tools and tackles required for desilting operations, all incidental chrges etc. as directed by the Engineer in charge. Payment will be made based on stack measurements (taken on punts). Supplying of Punts & Dredger CONVER-90, maintenance of the Dredger will be borne by the Department. (Engauging of 1 no Unskilled Labour for watch & ward of Dredger and punts during night time).
Labour charges for carrying out desilting operations in CW canal with dredger Conver-90 for removing of silt, sand,debris,natchu & algae from the bed of CW canal from Y-junction to wards Stage -I intake and loading the silt, sand and natchu etc. on to the punt kept on water surface, unloading on to the berms of CW canal and again trasporting the same from the berms to low lying areas with a lead of 3KM including Dredger Operator all labour charges,all leads & lifts, Conveyance, operations, movement of dredger & punts, hire charges of all tools and tackles required for desilting operations etc.Watch &ward of dredger, all incidental chrges etc. complete for finished item of work as directed by the Engineer in charge. Payment will be made based on stack measurement (taken on berms).Supplying of punt and Dredger CONVER # 90,, Maintenance of the Dredger will be borne by the Department.
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
3037-General Conditions- E procurement -2026-27.pdf
TENDER_DOCUMENT • 10.25 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
E tender.doc
TENDER_DOCUMENT • 0.13 MB
~$tender.doc
TENDER_DOCUMENT • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .