Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 0 VIABHAV VIHAR NAVADA NAVADA DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance D NO 65 3 710 JAWAHAR NAGAR VISAKHAPATNAM ANDHRA PRADESH 530011 EX SERVICEMEN COLONY SRIHARIPURAM GNT ROAD VISAKHAPATNAM ANDHRA PRADESH 530011 UDYAM AP 10 0053165 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹66.0 L
EMD Value
₹1.3 L
Closing Date
6 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Uttarakhand Jal Sansthan Karanprayag
Supply, Laying and Jointing of G.I. Pipe line (m), FHTC and other appurtenant works of Phase II Kanda Water supply scheme in block Karanprayag of District chamoli under Jal jeewan mission FY 2023-24
2023_UKJS_57760_1
186/e-tender notice/2023-24 Date 21-04-2023
Open Tender
Civil Works - Water Works
Item Wise
150 days
Karanprayag
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer UJS
₹1.3 L
Karanprayag
8 May 2023
24 Apr 2023
8 May 2023
24 Apr 2023
6 May 2023
26 Apr 2023
26 Apr 2023
Supply, Laying & Jointing of G.I. Pipe line (m), and other appurtenant works of Phase II Kanda Water supply scheme in block Karanprayag of District chamoli under Jal jeewan mission FY 2022-23. All rates shall be included all types of taxes and G.S.T.
Construction of Boulder filled gallery -4m including Intake Chambr supply of all materials,labour, T&P etc. complete.
Construction of R.C.C. roughening filter cum screening chamber including supply of all materials,labour, T&P etc. complete.
Intake Chambr supply of all materials,labour, T&P etc. complete.
Construction of R.C.C. Cross wall gadhera tapping arrangement par running meter length exess over 4 meter gadhera including supply of all materials,labour, T&P etc. complete.
Supply of all materials, labour, T&P etc and construction of R.C.C. Sump / CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . 35.00 KL
supply of FRP coated MS bucket type chlorinator of 25 ltr capacity with chlorination arrangements
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. 15 mm dia
20 mm dia
25 mm dia
32 mm dia
40 mm dia
50 mm dia
65 mm dia
Supply of valves and fittings ' I.S.I. marked medium class. (a) Wheel valves 32 mm dia
40 mm dia
50 mm dia
65 mm dia
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 60% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock (a) Earth & boulders
Medium Rock
Provide all materials, labour, T&P and construct following chambers as per type designs (a) Gate valve chamber
Balance Functional household Taped Connection (FHTC)
Providing of P.C.C. 1:2:4
RR Stone Masonary with 1;6 cement and sand mortar along the pipe line for proper completion of work
RR Stone Masonary laid in dry for pipe line for proper completion of work
Cartage of Material
M/S RAMESH CHANDRA SATI CONTRACTOR CHAMOLI
Varun Trading Company
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .