| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAdmitted-Finance | ₹23.5 L | L1 | Admitted-Finance |
| 2 | L2₹29.6 L+₹6.1 L (25.9%)Admitted-Finance 102 JASMINE PLOT N0 15 SECTOR 44 SEAWOODS WEST 400706 THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | ₹29.6 L+₹6.1 L (25.9%) | L2 | Admitted-Finance |
| 3 | L3₹40.4 L+₹16.8 L (71.6%)Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | ₹40.4 L+₹16.8 L (71.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI SRINIVASA ENGINEERING WORKS L1 | YEOMAN MARINE SERVICES PVT. LTD. L3 | NASS Engineering Services Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00MAIN GENERATOR ENGINE: HYUNDAI HIMSEN 7H25/33 HHI-EMD 1 Cheonha-dong Dong-ku Ulsan Korea 682-792 Tel. : +82 52 202 7272 Fax. : +82 52 202 7696 Email : [email protected] Website : http://www.hyundai-engine.com Name Plate Details: Engine: HYUNDAI HIMSEN /KOREA Type - 7H25/33 RPM- 900 fuel - MDO SPARES SHIP SUPPLY ELIGIBILILTY CRITIREON: VENDORS WITH PREVIOUS EXPERIENCE IN MAJOR OVERHAULING OF MAIN ENGINES OF MAKE :HYUNDAI/MAN/REPUTED MAKES.SHOULD SUBMIT EXPERIENCE CERTIFICATE.EXPERIENCE SHOULD NOT BE LESS THAN 7 YEARS FROM THE DATE OF BIDDING. 1.CONSUMABLES,CHEMICALS,GENERAL TOOLS ,LIFTING BELTS, CHAIN PULLEYS,CALIBRATED INSTRUMENTS ETC ARE TO BE ARRANGED BY VENDOR 2.MACHINING OF COMPONENTS IS UNDER VENDOR SCOPE 3.TO AND FRO TRANSPORTATION OF ENGINE COMPONENTS TO VENDOR WORKSCOPE/SHOP FLOOR IS UNDER VENDOR SCOPE. 4.SATISFACTORY TRIALS TO BE OFFERED ,SEA TRIALS TO BE ATTENDED. 5.WHEREVER NDT TEST IS NEEDED VIZ.,DP TEST, UT SCAN OF SHAFTS /CON RODS ETC THE SAME IS TO BE CARRIED OUT BY VENDOR THROUGH QUALIFIED TECHNICIAN | ||||||
| 1.10 | 1. AIR COOLERS TO REMOVE CHEMICALLY CLEAN IN WORKSHOP PRESSURE TEST AND THEN FIT BACK IN PLACE. CONSUMABLES REQUIRED FOR OVERHAULING OF COOLER SUCH AS CHEMICALS,GASKETS, BOLTS AND NUTS ETC ARE TO BE ARRANGED BY VENDOR.NO.OF COOLERS - 04 NOS
2. 1) Clean and inspect the thermostatic valves LT expansion valves & LO temperature expansion valves in all 4 generator.D565.Also check the thermostatic valve operation using hotbath.NO.OF THERMOSTATS - 04
3. Governors to be removed from engines and shift to shop floor .To be packed in
wooden box and transported to M/s SICAGEN workshop chennai .Upon receipt post
overhauling to be fitted onboard.To and fro transportation of governor from hsl to
OEM workshop is under vendor scope.Please note that governor overhauling will be
undertaken by HSL.Make : WOODWARD U G ACTUATOR .NO.OF GOVERNORS - 04
4. OVERHAULING OF ATTACHED HT AND LT PUMP - QTY - 04 SETS
5. CLEANING OF L O COOLER NO OF PLATES: 75 NO.SCOPE INVOLVES REMOVAL AND REFITMENT OF IMMEDIATE PIPELINE CONNECTION.CHEMICAL CLEANING.RENEWAL OF GASKETS.GASKETS SHIP SUPPLY.GLUE FOR FIXING GASKETS TO BE ARRANGED BY VENDOR.MOULDED RUBBER JOINTS FOR END PLATES TO BE SUPPLIED AND FIXED AS PER THE SAMPLE.QTY - 02 NOS
6. ALL FUEL INJECTION PUMPS TO BE OVERHAULED.QTY-28
7. FUEL PUMPS OVERHAULING TO BE CARRIED OUT AND FOLLOWING CHECKS TO BE
DONE., 1) INSPECT DEFLECTOR FOR ALL 4 DGs, 2) CHECK PLUNGER AASEMBLY
3) CHECK DELIVERY VALVE ASSEMBLY
8. ALL FUEL INJECTION P/PS TAPPET SPRINGS TO BE REPLACED SPRINGS SHIP SUPPLY - QTY 32 | 4 | LS | 5,70,000 ₹22,80,000 | 8,69,526 ₹34,78,104 | 3,15,475 ₹12,61,900 Lowest |
| 1.20 | TO RENEW RESILEINT MOUNTING PADS ON ALL FOUR GENERATORS EACH GENERATOR AND ALERNATOR HAVE TOTAL 10 NOS RESILIANT PADS FITTED TO REMOVAL ALL PIPELINE CONNECTIONS AND RENEW RESILIANT PADS ON ALL FOUR GENERATORS TOTAL RESILIANT PADS TO RENEW IN FOUR GENERATORS ARE 40NOS | 4 | NOS | 18,000 ₹72,000 Lowest | 1,39,500 ₹5,58,000 | 4,25,000 ₹17,00,000 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
9 Sept 2026, 11:00 amClosed
M (SRC-OS)
Ph.No. 9493792254
MAIN GENERATOR ENGINE ROUTINES ON ORV SAMUDRA RATNAKAR
2026_HSL_100029_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2026/344
Open Tender
Miscellaneous Services
Service
30 days
HSL, VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25,000
Yes
17 Sept 2026
1 Sept 2026
9 Sept 2026
1 Sept 2026
9 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MAIN GENERATOR ENGINE: HYUNDAI HIMSEN 7H25/33 HHI-EMD 1 Cheonha-dong Dong-ku Ulsan Korea 682-792 Tel. : +82 52 202 7272 Fax. : +82 52 202 7696 Email : [email protected] Website : http://www.hyundai-engine.com Name Plate Details: Engine: HYUNDAI HIMSEN /KOREA Type - 7H25/33 RPM- 900 fuel - MDO SPARES SHIP SUPPLY ELIGIBILILTY CRITIREON: VENDORS WITH PREVIOUS EXPERIENCE IN MAJOR OVERHAULING OF MAIN ENGINES OF MAKE :HYUNDAI/MAN/REPUTED MAKES.SHOULD SUBMIT EXPERIENCE CERTIFICATE.EXPERIENCE SHOULD NOT BE LESS THAN 7 YEARS FROM THE DATE OF BIDDING. 1.CONSUMABLES,CHEMICALS,GENERAL TOOLS ,LIFTING BELTS, CHAIN PULLEYS,CALIBRATED INSTRUMENTS ETC ARE TO BE ARRANGED BY VENDOR 2.MACHINING OF COMPONENTS IS UNDER VENDOR SCOPE 3.TO AND FRO TRANSPORTATION OF ENGINE COMPONENTS TO VENDOR WORKSCOPE/SHOP FLOOR IS UNDER VENDOR SCOPE. 4.SATISFACTORY TRIALS TO BE OFFERED ,SEA TRIALS TO BE ATTENDED. 5.WHEREVER NDT TEST IS NEEDED VIZ.,DP TEST, UT SCAN OF SHAFTS /CON RODS ETC THE SAME IS TO BE CARRIED OUT BY VENDOR THROUGH QUALIFIED TECHNICIAN | |||||
| 0.0 | 1. AIR COOLERS TO REMOVE CHEMICALLY CLEAN IN WORKSHOP PRESSURE TEST AND THEN FIT BACK IN PLACE. CONSUMABLES REQUIRED FOR OVERHAULING OF COOLER SUCH AS CHEMICALS,GASKETS, BOLTS AND NUTS ETC ARE TO BE ARRANGED BY VENDOR.NO.OF COOLERS - 04 NOS
2. 1) Clean and inspect the thermostatic valves LT expansion valves & LO temperature expansion valves in all 4 generator.D565.Also check the thermostatic valve operation using hotbath.NO.OF THERMOSTATS - 04
3. Governors to be removed from engines and shift to shop floor .To be packed in
wooden box and transported to M/s SICAGEN workshop chennai .Upon receipt post
overhauling to be fitted onboard.To and fro transportation of governor from hsl to
OEM workshop is under vendor scope.Please note that governor overhauling will be
undertaken by HSL.Make : WOODWARD U G ACTUATOR .NO.OF GOVERNORS - 04
4. OVERHAULING OF ATTACHED HT AND LT PUMP - QTY - 04 SETS
5. CLEANING OF L O COOLER NO OF PLATES: 75 NO.SCOPE INVOLVES REMOVAL AND REFITMENT OF IMMEDIATE PIPELINE CONNECTION.CHEMICAL CLEANING.RENEWAL OF GASKETS.GASKETS SHIP SUPPLY.GLUE FOR FIXING GASKETS TO BE ARRANGED BY VENDOR.MOULDED RUBBER JOINTS FOR END PLATES TO BE SUPPLIED AND FIXED AS PER THE SAMPLE.QTY - 02 NOS
6. ALL FUEL INJECTION PUMPS TO BE OVERHAULED.QTY-28
7. FUEL PUMPS OVERHAULING TO BE CARRIED OUT AND FOLLOWING CHECKS TO BE
DONE., 1) INSPECT DEFLECTOR FOR ALL 4 DGs, 2) CHECK PLUNGER AASEMBLY
3) CHECK DELIVERY VALVE ASSEMBLY
8. ALL FUEL INJECTION P/PS TAPPET SPRINGS TO BE REPLACED SPRINGS SHIP SUPPLY - QTY 32 | 4 | LS | - | - |
| 0.9 | TO RENEW RESILEINT MOUNTING PADS ON ALL FOUR GENERATORS EACH GENERATOR AND ALERNATOR HAVE TOTAL 10 NOS RESILIANT PADS FITTED TO REMOVAL ALL PIPELINE CONNECTIONS AND RENEW RESILIANT PADS ON ALL FOUR GENERATORS TOTAL RESILIANT PADS TO RENEW IN FOUR GENERATORS ARE 40NOS | 4 | NOS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
CQ344.pdf
Tender Documents • 0.83 MB
TBID344.pdf
Tender Documents • 0.36 MB
BOQ_109597.xls
BOQ • 0.28 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .