Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.8 L+₹37,521.37 (3.60%)Rejected-AOC 127 A JAMES LONG SARANI NANDAN PALLY KOLKATA 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | L2 | Rejected-AOC L2 | |
| 3 | L3₹10.9 L+₹47,944.66 (4.60%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
14 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
D.G. (E)
15n Nellie Sengupta Sarani Kolkata-700 087 West Bengal
Operation and Maintenance of Air Pollution Control Device ( phase I) at Garia Adi Mahasmashan.
2024_KMC_766956_1
KMC/LTG/OM/25/GAM/PHI/24-25
Open Tender
Support/Maintenance Service
Item Rate
365 days
Garia Adi Mahasmashan.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,000
7 Jan 2025
5 Nov 2024
18 Nov 2024
5 Nov 2024
14 Nov 2024
5 Nov 2024
Amount
Engagement of three (03) number skilled workers having ability of fault- finding, minor repairing of electro- mechanical system, water circuit and slurry discharge arrangements for operation of Air Pollution Control Device in three shifts (including damper & I.D fan operation) (As per Mpl. Secretary's Circular No. 04 of 2024-25 dt. 21.06.2024).
Engagement of three (03) number skilled workers having ability of fault- finding, minor repairing of electro- mechanical system, water circuit and slurry discharge arrangements for operation of Air Pollution Control Device in three shifts (including damper & I.D fan operation) (As per Mpl. Secretary's Circular No. 04 of 2024-25 dt. 21.06.2024).
Proportionate Casual Leave imposed as per Mpl. Secretary's No.23 of 2012-13 dt.10.12.2012 vide the MIC Item No.M 39.7 dt.14.08.2012. Adding the total amount of sl no 1&2 and 4.53% of it.
Engagement of a Reliever for operators (Skilled category) in the weekly off-Days (As per Mpl. Secretary's Circular No. 04 of 2024-25 dt. 21.06.2024). Total nos. of off-days for an operator in a year = 52 nos. Total off -days for three (03) nos. operators = (52 X 3) nos. = 156 nos. Total working days for Relieve throughout year = 156 Days [Rate Analysis for reliver wages: Total(A)= Rs. 13841.00 10% agency Charges of Rs. 13841.00 = 1384.10 Total wages(B) = Rs. 15225.10, Daily wages = Rs. 585.58
Engagement of a Reliever for the Sweeper in the weekly off-Days (As per Mpl. Secretary's Circular No. 04 of 2024-25 dt. 21.06.2024). Total nos. of off-days for an One Sweeper in a year = 52 nos. Total working days for Reliever throughout year = = (52 X 1) nos. = 52 nos. [Rate Analysis for reliver wages: Total(A)= Rs. 11440.00 10% agency Charges of Rs. 11440.00 = 1144 Total wages(B) = Rs. 12584.00, Daily wages = Rs. 484.00]
Labour charges for monthly as per directed by EIC, removing the carbon and particle/sludge arrested by Ceramic Saddles (3000 Nos. per stage for two stages for total of 6000 Nos.) from the Precooler and cleaning of the same in two stages. Two nos. of stainless-steel strainer /net to be cleaned by way of high-pressure jet pump and by scrubbing hammer manually. (Precaution to be taken for fresh air circulation during cleaning inside)
Labour charges for monthly as per directed by EIC, opening the two doors of mist eliminator by unscrewing 60(sixty) nos. nut and bolt and drawing out two nos. strainer. Cleaning the strainers by using scrubbing hammer and high pressure jet pump. Strainers to be fitted in proper position inside Mist Eliminator and closing the two doors and fitting 60 nos. nut and bolts.
Labour charges for monthly as per directed by EIC, cleaning of Blower by opening the inlet hub and removing canvas cloth. The deposited carbon from inside the blower to be cleaned manually and by high-pressure jet pump. After cleaning the inlet hub to be refitted and canvas cloth to be re wrapped.
Labour charges for monthly as per directed by EIC, chimney door to be unscrewed and deposited carbon particles are to be manually removed from inside the Chimney Base and washed with water. Removed Carbon particles to be packed up in gunny bags and dropped at the departmental Vat
S S ENTERPRISE (BID ID -5742116)
SIMPLE ENGINEERING AND CO. (BID ID -5742746)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .