Loading…
Loading…
Tender Value
₹72.7 L
EMD Value
₹72,735
Closing Date
3 Aug 2026, 6:00 pm
Dy. Municipal Commissioner, Gandhidham Municipal Corporation
CONSTRUCTION OF ABC FACILITY CENTER FOR GANDHIDHAM MUNICIPAL CORPORATION AREA, GANDHIDHAM, DIST. KUTCHCHH
326079
GDMC-021-DOGHOME-RT00
Open
Civil Works - Buildings
Works
Kutch
3 documents required · 3 mandatory
₹2,400
Municipal Commissioner, GANDHIDHAM Municipal Corporation
₹72,735
20 Jul 2026
20 Jul 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
Name of Work : Construction Of ABC Facility Center For Gandhidham Municipal Corporation Area, Gandhidham, Dist.
SCHEDULE - "B1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
1 Excavation for foundation up to 1.5 Meter depth including Rupees One Hundred
sorting out and stacking of useful materials and disposing Twenty Two and Ninety
of excavated stuff up to any lead. (a) For Loose or Soft soil Four Paise
2 Excavation for foundation upto 1.5 m depth including Rupees One Hundred
sorting out and stacking of useful materials and disposing Fifty Seven and Thirty
off the excavated stuff to any lead. (B) Dense or Hard soil Three Paise
3 Excavation for foundation upto 1.5 m depth including Rupees Two Hundred
sorting out and stacking of useful materials and disposing Sixty Seven and Eight
off the excavated stuff upto 50 Meter lead. (C) Hard Paise
4 Filling in foundation and plinth with murrum or selected Rupees Two Hundred
soil in layers of 20cm. thickness including watering, Sixty Nine and Seventy
ramming and consolidating etc. complete. (upto 10 ton) Five Paise
5 Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm. In depth consolidating each deposited
layer by ramming and watering
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
6 Providing and laying WBM sub-base required as providing
course graded material grading-I in one layer using BTMC
metal 45 mm to 63 mm including using 22% Stone
screening 13.2 mm size and 7% stone dust as filler
Gradation including conveying the materials at the site of
work, mixing and spreading in to grade and camber,
watering and consolidation at OMC with vibratory roller
incl. the cost of materials labours etc. and all complete.
7 Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in
foundation and plinth in Cement Mortar 1:5. (1- Cement :
5 -fine sand) (B) Conventional
8 Providing and laying cement concrete 1:3:6 (1-cement :
Coarse sand : 6 Graded stone aggregate 40mm nominal
size) and curing complete excluding cost of form work in.
(A) foundation and Plinth
9 Providing laying Controlled cement concrete M-250 and
curing complete including the cost of form work and
excluding cost of reinforcement for reinforced concrete
work in : RCC Column Footings
10 Providing laying Controlled cement concrete M-250 and
curing complete including the cost of form work and
excluding cost of reinforcement for reinforced concrete
work in : RCC Column up to Plinth Level.
11 Providing laying Controlled cement concrete M-250 and
curing complete including the cost of form work and
excluding cost of reinforcement for reinforced concrete
work in : RCC Columns for Ground Floor and First Floor
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
12 Providing laying Controlled cement concrete M-250 and
curing complete including the cost of form work and
excluding cost of reinforcement for reinforced concrete
RCC Plinth beams
13 Providing laying Controlled cement concrete M-200 and
curing complete including the cost of form work and
excuding cost of reinforcement for reinforced concrete
work in : RCC Floor Beams at GF Slab lvl.
14 Providing laying Controlled cement concrete M-200 and
curing complete including the cost of form work and
excluding cost of reinforcement for reinforced concrete
work in : RCC Slabs & Landings
15 Providing laying Controlled cement concrete M-200 and
curing complete including the cost of form work and
excluding cost of reinforcement for reinforced concrete
0.30 work in : RCC lintel 6283.00 m3
16 Providing laying Controlled cement concrete M-250 and
curing complete including the cost of form work and
excuding cost of reinforcement for reinforced concrete
RCC Walls from top of foundation level up to floor two level
17 Providing and TMT bar FE 500/500D reinforcement for
R.C.C. work and including bending, binding & placing in
position completed upto floor two level.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
18 Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in
foundation and plinth in Cement Mortar 1:5. (1-Cement : 5-
fine sand) (B) Conventional
19 Half brick masonry in common brunt clay building bricks
having crushing strength not less than 35 Kg/Sq.Cm. in
Cement mortar 1:4 (1-Cement : 4-coarse sand) in
foundation and plinth (B) Conventional
20 Aerated light weight Concrete block masonry in partion
walls 10 cm thick with having crushing strength not less
than 35 kg / sq. cm. for super structure above plinth level
up to floor two level in cement mortar 1:4 (1 Cement :
fine sand) complete as per technical specification
21 20mm thick sand faced cement plaster on walls up to 10 Rupees Three Hundred
meter above ground level consisting of 12mm thick Fifteen and Sixty Nine
backing coat of C.M. 1:3 (1-cement : 3- fine sand) and 8 Paise
mm thick finishing coat of C.M. 1:1 (1-cement : 1-sand)
22 Providing 15mm thick cement plaster in single coat on Rupees One Hundred
rough (Similar) side of single or half brick walls for interior Eighty and Forty Paise
plastering upto floor two level and finished even and
smooth in (i) C.M. 1:3 (1-cement : 3- sand)
23 Providing 10mm thick cement plaster in single coat on Rupees One Hundred
brick/concerete walls for interior plastering upto floor two Thirty Five and Forty
level and finished even and smooth in (i) C.M 1:3 (1- Seven Paise
cement : 3-sand)
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
24 Finishing wall with weather proof exterior emulsion paint Rupees One Hundred
on wall surface (Two coats) to give an requried shape even Twenty and Twenty Six
shade after thoroguhly brushing the surface to remove all Paise
dirt, and remains of loose powdered materials etc.
25 Applying Two coats of Birla or Asian Acrylic Lappy (putty) Rupees Forty and Fifty
and two coats of primer of approved brand and Nine Paise
manufacture on new wall surface to give an even shade
including throughly brushing the surface free from mortar
dropping and other foreign matter and sand papered
446.00 smooth. 40.59 m2
26 Wall painting (two coats) with plastic emulsion paint of Rupees Eighty Four and
approved brand and manufacture on undecorated wall Thirty Seven Paise
surface to give an even shade including throughly brushing
the surface free from mortar dropping and other foreign
matter and sand papered smooth
27 Providing and laying Granite slab (18mm thick) slab Rupees Two Thousand
flooring over 20mm (Average) thick base of cement mortar Four Hundred Sixty and
1:6 (1-cement : 6-Coarse sand) or L.M. 1:1.5 laid over Forty Six Paise
and jointed with grey cement slurry including rubbing and
polishing complete (Basic Granite rate shall be 250/Sft)
15.90 (A) Granite slab 18mm thick 2460.46 m2
28 Providing and fixing Gun metal check or non-return fullway Rupees Six Hundred
wheel valve. (E) 40mm dia Sixty Three and Forty
2.00 663.43 Three Paise No
29 Providing and laying coloured glazed tiles of the size 300 Rupees One Thousand
mm x 200 mm x 8 mm / 300 mm x 450 mm x 8 mm in Four Hundred Eighty
skirting, risers of steps and dedo on 10 mm. thick cement Eight and Twenty Four
plaster 1:3 (1 cement : 3 coarse sand) & jointed with Paise
54.80 white cement slurry. 1488.24 Sqm
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
30 Providing and laying Vitrified tiles 8 to 10 mm thick , 24'' x Rupees One Thousand
24'' in flooring treads of steps and landing laid on a bed of One Hundred Twenty
12mm thick cement mortar 1:3 (1-cement : 3-coarse sand and Thirty Six Paise
) finishing with flush pointing in white cement.
31 Constructing brick masonry chamber for under ground C.I. Rupees Two Thousand
Inspection chamber and bends with bricks having crushing Nine Hundred Thirty
strength not less than 35 Kg/cm2 in cm. 1:5 C.I. Cover Two and Ninety Three
with frame (light duty) 455 mm. X 610 mm. Internal Paise
dimensions, total weight of cover with frame to be not less
than 38 Kgs. weight of cover 23 Kg. and wt. of frame
Kg) R.C.C. top slab with 1:2:4 mix (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm. size) foundation
concrete 1:5:10 inside plaster 15 mm. thick with cement
mortar 1:3 finished smooth with a floating coat of neat
cement on walls & abed concrete etc. complete (I) inside
dimensions, 455 mm. 610 mm. And 450 mm. Deep for
single pipe line.
32 Providing and fixing 600 mm. X 450 mm. Bevelled edge Rupees Eight Hundred
mirror of superior glass mounted on 6 mm. Thick A.C, Fifty Nine and Forty One
sheet or plywood sheet and fixed to wooden plugs with Paise
2.00 C.P. brass screws and washers 859.41 EA
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
33 Providing and fixing FRP frame size 100 X 50mm and Rupees Two Thousand
28mm thick FRP depress panel shutter having extra Three Hundred Seventy
reinforcement on sides & edges in gel coat finish. The core Seven and Seventy Six
of the shutter & frame is to be filed up with injected fire Paise
retardant grade polyuthene foam done in situ along with
embedded wooden pieces for stiffening & also taking
hinges & fintures. the whole FRP frame & shutter is to be
water proof weather proof, termite proof & resistance to
mild acid/alkali. rates are to be inclusive of s.s. hinges
with neccesary screw & alluminium fixtures & fastnings &
fastener sleeve.
34 Providing and fixing 35mm thick shutter for doors, Rupees Five Thousand
windows and clerestory windows including Indian teak Three Hundred Thirty
wood frames 12cm x 7cm. Size including anodized Eight and Thirty Paise
alluminium fixtures and fastenings including primer coat of
approved quality and two coats of oil painting etc,
5.80 complete. (ii) Fully Panelled. 5338.30 m2
35 Providing and laying polished Kota stone slab flooring over Rupees One Thousand
20 mm (Average) thick base of cement mortar 1:6 (1- Thirteen and Eighty
cement : 6-coarse sand) or L.M. 1. 1.5 (1-Lime putty : 1.5- Seven Paise
coarses and) laid over and jointed with grey cement slurry
mixed with pigment to match the shade of slab including
32.80 rubbing and polishing etc. complete. (A) 25mm thick 1013.87 m2
36 Providing and fixing C.P. brass waste for wash basin or Rupees Sixty Seven and
sink Ninety One Paise
3.00 (A) 32mm dia 67.91 EA
37 Providing and fixing water closet squatting pan (European Rupees One Thousand
Type type W.C. Pan) size 580 mm. (Earth work, Bed Three Hundred Fifty Six
concrete foot rests and trap to be measured and paid for and Eighty One Paise
(A) Vitreous china
(I) Long pattern white colour
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
38 Providing and fixing urinal approved quality connecting the Rupees One Thousand
urinal with waste pipe, trap etc. complete Seventy Four and
(A) White earthen ware flat back or corner type size Eighty Six Paise
39 Providing and fixing washbasin with single hole for pillar Rupees One Thousand
tap with C.I. or M.S. brackets painted white including Five Hundred Eighty
sutting holes and making good the same but excluding One and Seventy Seven
3.00 fittings. (A) Vitreous China 1581.77 Paise No.
40 Providing and fixing screw down bib taps of following size : Rupees One Hundred
(A) Brass screw down bib tap polished bright (I) 15mm Eighty Six and Eighty
3.00 dia. 186.83 Two Paise EA
41 Providing Erecting and fixing coated PVC. (ISI) water tank Rupees Three and
of required capacity each with all necessary fittings and Ninety Four Paise
2000.00 connection etc. complete on terrace. 3.95 Lt.
42 Providing and laying broken china mosaic flooring for Rupees Seven Hundred
terrace using 12 mm to 20 mm broken pieces of glazed Seventy Nine and Sixty
tiles to be laid over cement mortar 1:3 to plain or slope Nine Paise
and to be tempered to bring mortar crème out up to
surface using white cement including rounding off
junctions and extending them up to 15cm along the wall
clearing with water and oxalic acid etc. as directed
43 Providing and fixing standared extruded of alluminium Rupees One Thousand
section of size 63mm x 38.10mm x 1.2mm @ Wt. 0.643 One Hundred Seventy
Kg/mt with colour anodized alluminium frame for Five and Fifty Five Paise
ventilation with 5 mm thick frosted glass as details etc
complete for Ventilation
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
44 Providing laying and jointing in true line and level 40mm Rupees One Hundred
dia. U.P.V.C. Pipe (SCH-40) for cold water including Forty Eight and Eleven
fittings make PRINCE / SUPREME / ASTRAL / FINOLEX or Paise
equivalent as approved by Engineer In Charge. Pipe shall
be fixed on the wall with the help of clamp at every two
metre C/C or shall be concelled as directed including
necessary fittings etc. including testing of pipe and joints
and fixing the same with adhesive solvent, including cost
30.00 of all materials. 148.12 m
45 Providing, laying and jointing in true line and level 25mm Rupees Ninety One and
dia. U.P.V.C. Pipe (SCH-40) line including fitting as Eighty Four Paise
approved by Engineer-in-Charge. Pipe shall be fixed on the
wall with the help of clamp at every two meter C/C or shall
be concealed as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all materials. (D)
10.20 25mm dia pipe 91.84 Rmt
46 Providing, laying and jointing in true line and level 50mm Rupees One Hundred
dia. U.P.V.C. Pipe (SCH-40) line including fitting as Ninety Five and Sixty
approved by Engineer-in-Charge. Pipe shall be fixed on the Seven Paise
wall with the help of clamp at every two meter C/C or shall
be concealed as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all materials. (D)
45.50 50mm dia pipe 195.67 Rmt
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
47 Providing laying and jointing in true line and level 32mm Rupees One Hundred
dia. U.P.V.C. Pipe (SCH-40) for cold water including Nineteen and Fifteen
fittings make PRINCE / SUPREME / ASTRAL / FINOLEX or Paise
equivalent as approved by Engineer In Charge. Pipe shall
be fixed on the wall with the help of clamp at every two
metre C/C or shall be concelled as directed including
necessary fittings etc. including testing of pipe and joints
10.80 and fixing the same with adhesive solvent, including cost 119.15 Rmt
48 of all materials.
Providing laying and jointing in true line and level 15mm Rupees Seventy Two
dia. U.P.V.C. Pipe (SCH-40) for cold water including and Sixty Five Paise
fittings make PRINCE / SUPREME / ASTRAL / FINOLEX or
equivalent as approved by Engineer In Charge. Pipe shall
be fixed on the wall with the help of clamp at every two
metre C/C or shall be concelled as directed including
necessary fittings etc. including testing of pipe and joints
11.70 and fixing the same with adhesive solvent, including cost 72.65 Rmt
49 of all materials.
Providing, laying and jointing in true line and level 110 Rupees Eight Hundred
diametre U.P.V.C (Type B) conforming to IS 13592-1992 Seventy Six and Ninety
with one end plain and other end socketed with rubber Paise
ring, & fittings conforming to ISI 14735-1999 of approved
make for drainage system pipe line, pipe shall be jointed
with each other with rubber lubricant, pipe shall be fixed
on wall using of PVC clamp of the size 110 mm diametre x
149 mm length x 145 mm heigh at every 2000 mm center
to center or shall be concealed in walls as directed
including necessary fittings such as bends, shoes etc.
including testing of pipes and joints and jointed with
adhesive solvent cement including cost of all materials.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
50 Providing and fixing PVC SWR Nahni trap IS 14735 for Rupees Five Hundred
drain - 100 mm diameter with jali of the following nominal Eighty Six and Twenty
diameter of self cleansing design with C.I scread down or Seven Paise
hinged grating including the cost of cutting and making
good the walls.
51 Providing and laying Granite slab in riser of steps Dedo Rupees Two Thousand
and pillars laid 10mm thick Cement Mortar 1:3 (1-Cement Five Hundred Ninety
: 3-Coarse Sand)and jointed with Grey Cement Slurry and Seventy Five Paise
including rubbing and polishing complete.
52 Providing and fixing brass screw down stop (A) 15 mm. Rupees Two Hundred
Dia Five and Eighty Two
3.00 205.83 Paise EA
53 Providing and fixing Pillar Tap, capstan head, screw down
high pressure with screws, shanks and back nuts (A)
54 Providing and fixing M.S. grills of required pattern to Rupees One Hundred
wooden frames of windows etc. with M.S. flats at required Nine and Eight Paise
spacings and frame alround, square or round bars with
round headed bolts and nuts or by screws. (A) Plain Grill
55 Providing and fixing in position collapsible steel shutters Rupees Six Thousand
with vertical channels 20 x 10 x 2 mm braced with flat iron Seventy One and Fifty
diagonals 20 x 5 mm size with top and bottom rails of Paise
T_rin 40x 40 x 6 mm with 38mm dia, steel pulleys
complete with bolts, nuts, locking arrangements, stoppers
0.76 handles including applying a priming coat of red lead 6071.50 q
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
56 Providing, Supplying and Fixing of Rebaring 16 mm dia Rupees One Hundred
steel bar In Existing Structure With Specified Depth & With Seventy Seven and
Standered Chemical Filling and all complete as per given Seventy Six Paise
instructions of Engineer-in-charge.
57 Drilling of 9 inches dia vertical borehole for garden Rupees Six Hundred
irrigation including in all strata with required length Fifty Nine and Fifty
including providing, lawring & laying of 11 inches dia PVC Three Paise
casing pipe with pushing complete.
58 Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of
concreteM300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming to IS
15658 : 2006 including 35 mm Sand layer for levelling and
filling the joint with sand in proper line and level as per
guidlines of IRC : SP 63-2018 etc. Complete.
59 Providing and laying cement concrete flooring 1:2:4 (1- Rupees Three Hundred
cement : 2-coarse sand : 4-graded stone aggregate 20mm Fifty Five and Twenty
nominal size) laid in one layer and finished with a floating Two Paise
coat of neat cement. (B) 50mm thick.
60 Providing, Supplying and Fixing of Approved ISO make Rupees Three Hundred
Natural Colour Epoxy Fiber Glass sheet of having 6mm Sixteen and Eighty Six
thickness, applicataion temp. 310 deg, Tensile stregnth Paise
19000 Psi and all Complete as given instructions of
Engineer-in-charge.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
61 Painting two coats (excluding priming coat) on new steel Rupees Ninety Two and
and other metal surface with enamel paint, brushing, Twenty Paise
interior to give an even shade including cleaning the
surface an even shade including cleanicn the surface of all
dirt, dust and other foreign matter.
62 Providing & fixing 0.60 X 0.60 sizetiles & galvenized frame Rupees Eight Hundred
on gypsam board, faulse ceiling with moulding & designed Fifty Four and Forty Six
62.94 patta. 854.46 Paise Sqm
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in Scheduled-B at basic rate. One percent labour cess will be deducted from
contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender
: amount put to tender :
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference
in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in
GERI laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be
paid by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills
of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. Exc. of GST etc. and department will not entertain any contractor
representation to reimburse any financial burden due to applicable taxes : Exc. of GST.
Signature of contractor
MUNICIPAL COMMISSIONER
GANDHIDHAM MUNICIPAL CORPORATION
GANDHIDHAM MUNICIPAL CORPORATION
Name of Work : Construction Of ABC Facility Center For Gandhidham Municipal Corporation Area, Gandhidham, Dist.
SCHEDULE - "B2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
1 Excavation for foundation up to 1.5 Meter depth including Rupees One Hundred
sorting out and stacking of useful materials and disposing Twenty Eight and
of excavated stuff up to anylead Seventy Nine Paise
8.31 (a) For Loose or Soft soil 128.79 m3
2 Excavation for foundation upto 1.5 m depth Rupees One Hundred
includingsorting out and stacking of useful materials and Sixty Four and Eighty
disposing off the excavated stuff upto any lead. Two Paise
5.78 (B) Dense orHard soil 164.82 m3
3 Excavation for foundation upto 1.5 m depth including Rupees Two Hundred
sorting out and stacking of useful materials and disposing Seventy Nine and
off the excavated stuff up to any lead. Eighty One Paise
5.78 (C) Hard Murrum 279.81 m3
4 Filling available excavated earth (excluding rock) in Rupees One Hundred
trenches, plinth, sides of foundations etc. in layers not Thirty Seven and Forty
exceeding 20 cm. In depth consolidating each deposited Seven Paise
layer by ramming and watering.
5 Disposing off the excavated stuff of above items for lead of Rupees One Hundred
(E) 400 to 500m Twenty Nine and
Twenty Eight Paise
6 Filling in foundation and plinth with murrum or selected Rupees Three Hundred
soil in layers of 20 cm thickness including watering, Seven and Forty One
10.11 ramming and consolidating etc. complete. 307.41 Paise m3
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
7 Providing and laying Cement Concrete 1:3:6 (1 Cement : 3- Rupees Three Thousand
coarse sand :6- Hand broken stone aggregate 40 mm. One Hundred Eighteen
Nominal size) and curing complete excluding cost of form and Seven Paise
(a) Foundation and plinth (more then 10 ton)
8 Providing laying Controlled cement concrete M-250 and Rupees Four Thousand
curing complete including the cost of form work and Five Hundred Three and
excluding cost of reinforcement for reinforced concrete Fifty Nine Paise
(A) RCC Column Footing
9 Providing laying Controlled cement concrete M-250 and Rupees Eight Thousand
curing complete including the cost of form work and Seven Hundred Twenty
excluding cost of reinforcement for reinforced concrete Six and Forty Paise
RCC Columns: Below Ground
10 Providing laying controlled cement concrete M-250 and Rupees Six Thousand
curing complete including the cost of form work and One Hundred Fifty Five
excuding cost of reinforcement for reinforced concrete and Ninety Five Paise
(C) RCC Plinth beams
11 Providing TMT Bar FE500 D reinforcement for R.C.C. work Rupees Seventy Seven
including bending, binding and placingin position complete and Twenty Nine Paise
upto floor two level
12 Providing and fixing M.S. grills of required pattern to Rupees One Hundred
wooden frames of windows etc. with M.S. flats at required Fourteen and Forty Four
spacings and frame alround, square or round bars with Paise
round headed bolts and nuts or by screws (A) Plain Grill.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
13 Structural Steel work (Confirming to IS 4923-1997) Rupees One Hundred
riveted, bolted or welded in builtup for all type sections, in Thirty One and Eighty
framed work, including cutting, hoisting, fixing in position Three Paise
and applying a primimng coat of approved steel primer all
complete as per the structural designs of Engineer in
charge. Column ( 150 X 150 X 10)
14 Providing and Fixing M.S. round holding down or anchor Rupees Fifty Five and
28.80 bolts with nuts and washer plates complete 55.60 Sixty Paise Kg
15 Providing corrugated G.I. sheet of class-3 roofing fixed Rupees Seven Hundred
with glavanished iron J or L Hooks, Bolts and nuts 8mm Thirty Four and
dia meter with bitumen and G.I. limpet washer or G.I Nineteen Paise
.limpet washer. filled with white lead complete excluding
the cost of purlins, Rafters and Trusses. (1)0.80 mm thick
16 Providing and fixing 150mm wide 450mm over all Rupees Five Hundred
semicircular plain G.I. sheet class-3 gutter with iron Eighty One and Thirty
brackets 40mm x 3mm size bolts, nuts washers etc. Two Paise
including making necessary connection with rain water
(i) 0.80 mm thick sheet.
17 Providing and fixing of wall ceiling and floor 10.0 kg. Rupees Two Hundred
F/cm2 working pressure polythene pipes of the following Fifty Eight and Twenty
outside dia. Low density, complete with special flange Three Paise
compression type fittings, wall clips etc. including making
good the wall ceiling and floor.(G) 110mm
18 Painting two coats (excluding priming coat) on new steel Rupees Ninety Six and
and other metal surface with enamel paint, brushing, Fifty Nine Paise
interior to give an even shade including cleaning the
surface an even shade including cleanicn the surface of all
273.04 dirt, dust and other foreign matter. 96.59 m2
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in Scheduled-B at basic rate. One percent labour cess will be deducted from
contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender
: amount put to tender :
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference
in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in
GERI laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated in Figure in Words according to
but may be estimated
more or less quantities.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be
paid by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills
of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
9) The contractor is solely responsible to bare all applicable taxes. Exc. of GST etc. and department will not entertain any contractor
representation to reimburse any financial burden due to applicable taxes : Exc. of GST.
Signature of contractor
MUNICIPAL COMMISSIONER
GANDHIDHAM MUNICIPAL CORPORATION
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. SBD.pdf
02. Mile Stone Dates and Tender Nivida.pdf
03. Schedule-B.pdf
04. Qualification Criteria.pdf
05. Terms and Conditions.pdf
06. GR ALL.pdf
07. GR ARC.pdf
09. BUILDING SPECIFICATIONS.pdf
08. Specification Index.pdf
10. ROAD WORK SPECIFICATIONS.pdf
11. LED light Specification.pdf
12. Additional Specification.pdf
13. TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
14. ELECTRIC SPECIFICATION.pdf
15. Self Declaration Format.pdf
16. Non-Blacklisted Format.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].