Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.1 LAdmitted-Finance | ₹7.1 L | L2 | Admitted-Finance |
| 3 | L3₹7.3 LAdmitted-Finance | ₹7.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Syfash Enterprise L2 | SHYAM JITENDRA MODHA L3 | PSM ENGINEERING SERVICES L1 |
|---|---|---|---|---|---|---|
| 1.00 | L-010: Fly bridge console controls of waterjet (Make-MJP) malfunctioning and not responding to command view stiff azimuth combinators movement in both port & stbd direction. Suspect potentiometer malfunctioning view weathering. Overhaulling of both azimuth combinators of fly bridge to be carried out, defective components to be repaired/renewed. Both azimuth combinators post overhauling to be calibrated, system to be checked in all modes of operation and integration of bridge and fly bridge controls to be done. Defect to be rectified and system to be proved for satisfactory operation. | 1 | NOS. | 6,76,190.5 ₹7.1 L | 6,95,238.09 ₹7.3 L | 6,57,142.86 ₹6.9 L |
Tender Value
Refer Docs
Closing Date
8 May 2026, 10:00 amClosed
COMDT(JG) SALIL V JOSHI
The Commander, Dhq-1
Defect Rectification Of Fly Bridge Console
2026_ICG_762821_1
344/445/03/26-27
Limited
Marine Services
Porbandar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
12 May 2026
30 Apr 2026
9 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | L-010: Fly bridge console controls of waterjet (Make-MJP) malfunctioning and not responding to command view stiff azimuth combinators movement in both port & stbd direction. Suspect potentiometer malfunctioning view weathering. Overhaulling of both azimuth combinators of fly bridge to be carried out, defective components to be repaired/renewed. Both azimuth combinators post overhauling to be calibrated, system to be checked in all modes of operation and integration of bridge and fly bridge controls to be done. Defect to be rectified and system to be proved for satisfactory operation. | - | NOS. | - | - | NA |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_854491.xls
BOQ • 0.28 MB
RFP.pdf
Tender Documents • 0.45 MB
Download all tender documents and submit your bid