| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | L1 | Accepted-AOC accepted. | |
| 2 | L2₹16.0 L+₹4.3 L (36.3%)Rejected-Finance | L2 | Rejected-Finance other than lowest. | |
| 3 | L3₹16.5 L+₹4.8 L (40.7%)Rejected-Finance | L3 | Rejected-Finance other than lowest. | |
| 4 | L4₹17.2 L+₹5.4 L (46.5%)Rejected-Finance | L4 | Rejected-Finance other than lowest. | |
| 5 | L5₹19.2 L+₹7.5 L (63.9%)Rejected-Finance | L5 | Rejected-Finance other than lowest. |
Tender Value
Refer Docs
EMD Value
₹65,060
Closing Date
29 Jan 2021, 6:00 pmClosed
GE Ludhiana
Garrison Engineer Military Engineer Services Near Jagraon Bridge PIN-141001
Outsourcing of essential services for running of AC plants at Baddowal under GE Ludhiana.
2020_MES_407787_1
GE/LDH-55/2020-21
Open Tender
Manpower Supply
Item Rate
330 days
Baddowal Under GE Ludhiana
Refer NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE Ludhiana
₹65,060
Yes
3 Feb 2021
29 Dec 2020
30 Jan 2021
29 Dec 2020
29 Jan 2021
8 Jan 2021
29 Dec 2020 - 7 Jan 2021
Amount
Outsourcing services for running of air conditioning plant round the clock, with one skilled operator in shift of 8 hours, 3 shifts/ day including sundays & holidays for plant marked as No. 3 of capacity 40 x 2 TR working plus 40 x 1 TR standby, chilled water system for maintaining desired conditions as under :- (a) Temperature 20º F ± 4º C (b) Relative humidity 55% ± 5% Each plant comprises of 3 No. compressure units, 02 No. chilled water pumps, 02 No. condensing pumps, 01 No. cooling tower, 01 No. water heating unit -180 KW, 03 No AHU within a radius of 120 metre from AC room, electrical panels and safety equipments.
All as per srl item No. 1.01 here- in -before but for plant marked as No. 4 Note for Item No 1 to 2:- (a) Contractor will provided uniform of light blue shirt and dark black paint. On shirt right hand side MES Ludhiana to be engraved with red thread. (b) Log sheet for installation to be provided by contractor. (c) Cleaning of installation will be responsibilities of contractor including material provided for cleaning all round the installation up to 10m distance.(d) Furniture for staff shift will be provided by contractor. (e) Weekly rest to be provided to all staff employed . (f) Attendance register will be handed over to concerned JE. (g) The payment to the staff deployed under this contract shall not be less than minimum wages. The salary shall be credited to the bank account of employee within first week of every month irrespective of fact weather contractor had claimed RAR or otherwise.The payment of the employees shall be made directly to the Bank account of the employees through NEFT/RTGS or any other mode of transfer and contractor shall submit proof thereof to GE/Engineer- in-charge. Submission of proof of crediting the wages to the Bank account of the employees by the contractor shall be pre-requisite to release the RARs payments. No payments to contractors will be made, unless proof of payment of wages through bank account is submitted by the contractor.(h)Staff empolyed shall be 3 years experience in the trade.(i)Toolkit will be provide by the contractor.(j) First Aid box will be provide by the contractor.
Outsourcing of attending day to day electrical complaints by one electrician and one helper in each shift of 08 hrs for 02 shifts per day including sundays and holidays i.e. Morning, evening shift including attending complaints at Baddowal station area complete all as directed by the Engineer-in-Charge. Notes:- (a) The contractor's rep (Electrician) shall attend all types of complaint as directed. (b) Complaints given upto 08.00 hours on the day shall be attended and cleared on the same day.(c) Shift timing shall be 0800 hours (morning shift), 1600 hours (evening shift) as applicable to respective item. (d) The contractor shall maintain necessary documents such as attendance register as specified in the particular specifications.Note Item : (a) Contractor will provided uniform of light blue shirt and dark black paint. On shirt right hand side MES Ludhiana to be engraved with red thread. (b) Furniture for staff shift will be provided by contractor. (c) Weekly rest to be provided to all staff employed . (d) Attendance register will be handed over to concerned JE. (e) The payment to the staff deployed under this contract shall not be less than minimum wages. The salary shall be credited to the bank account of employee within first week of every month irrespective of fact weather contractor had claimed RAR or otherwise.The payment of the employees shall be made directly to the Bank account of the employees through NEFT/RTGS or any other mode of transfer and contractor shall submit proof thereof to GE/Engineer- in-charge. Submission of proof of crediting the wages to the Bank account of the employees by the contractor shall be pre-requisite to release the RARs payments. No payments to contractors will be made, unless proof of payment of wages through bank account is submitted by the contractor.(f)Staff empolyed shall be 3 years experience in the trade.(g)Toolkit will be provide by the contractor.(h) First Aid box will be provide by the contractor.
CHOUDHARY ENTERPRISES
IK ONKAR ENGINEER AND CONTRACTOR
R K ENTERPRISES
P.K.MALL ENTERIPRSES
M/S J N TRADERS
JASSI TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .