Landscaping at Fruit Growers Cooperative Society Kargil (by way of Balance work) Under SDP
2026_PWD_19473_2
E tender 34 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Others
Percentage
45 days
Kargil
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Xen RnB Division Kargil
₹54,000
12 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
12 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTHWORK: Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables, etc (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift up to 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres, all kinds of soil. | 174.48 | CUM | 270.59 | ₹47,212.54 |
| 2 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (crushed) Mud Mate
(Use Of Portland Pozzolana Cement Is advised as Per Green Building Guidelines OR 25% replacement of Ordinary Portland cement with fly ash by weight of cement used in structural concrete.) | 129.07 | cum | 6,427.91 | ₹8,29,650.34 |
| 3 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate 20 mm nominal
size) (Use Of Portland Pozzolana Cement Is advised as Per Green Building Guidelines OR 25% replacement of Ordinary Portland cement with fly ash by weight of cement used in structural concrete.) | 5.27 | cum | 13,730.87 | ₹72,361.68 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 4.07 | Cum | 10,802.86 | ₹43,967.64 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 523.04 | kg | 106.38 | ₹55,641 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level with 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.32 | cum | 7,777.95 | ₹2,04,715.64 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 170.91 | sqm | 618.31 | ₹1,05,675.36 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundation, footing bases of column | 33.6 | Sqm | 297.89 | ₹10,009.1 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. | 48.88 | Sqm | 748.27 | ₹36,575.44 |
| 10 | 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand) | 59.81 | Sqm | 349.89 | ₹20,926.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_46140.xls
BOQ • 0.47 MB
CORRIGENDUMNIT34OF2026DATEEXTEN.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .