Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
9 Feb 2024, 11:00 amClosed
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Calibration of Electrical items on ORV SINDHU SADHANA
2024_HSL_94063_1
20 / 22019 / 067 / Calibration / 2023-24
Open Limited
Miscellaneous Services
Service
15 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
7 Mar 2024
10 Jan 2024
9 Feb 2024
10 Jan 2024
9 Feb 2024
10 Jan 2024
Amount
All Cold Room Temperature Digital Control Meter in Galley to be calibrated Scope of the work involves calibration, trial & testing
All Cold Room Temperature Digital Control Meter in Galley. Renew if found defective (Procure, Supply and fitment). MAKE: ARTECH TEMPERATURE CONTROLLER.
Scientific Cold store temperature control to be calibrated. Scope of the work involves calibration, trial & testing
Scientific Cold store temperature control. Renew if found defective (Procure, Supply and fitment).
HOT WATER BOILER Make : Euro Boiler GARIONI NAVAL, Model : NPR 407, Burner Type : RIELLO, Model : RL 50 Boiler to be cleaned, Burner motor to be overhauled with new bearing, solenoid, Ignition transformer, Electrode, Comb. Controller & Air gate valve to be checked for its proper operation. If any of the above is found defective, same need to be renewed with new spare. Boiler should be made operational along with safeties.
Components / Items / Spares / Materials: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Components / Items / Spares / Material mentioned at Sl.No.5 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 6 against third party/OEM invoice.
Heat Recovery System Temperature Controller make: CLORIUS, model: ER2000 Scope of the work involves calibration, trial & testing
Heat Recovery System Temperature Controller make: CLORIUS, model: ER2000 Renew if found defective (Procure, Supply and fitment).
Installation of BUZZER SYSTEM Scope of work involves installation & testing of 2 way buzzer with light system & cable (Marine grade) from winch control room to i) CTD area (approx. 50m.) ii) Aft A-frame (approx. 100m.)
Components / Items / Spares / Materials: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Components / Items / Spares / Material mentioned at Sl.No.9 for above scope of work. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 10 against third party/OEM invoice.
DELTA MARINE ENGINEERS
VIJAYA TECHNO ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .