Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC 18 6 LOWER SAMKHETAR MANDI 175001 H P | MANDI | MANDI | HIMACHAL PRADESH | 175001 | ₹5.2 L Quoted ₹4.9 L | L1 | Accepted-AOC L1 |
Updated dates
Tender Value
₹5.0 L
EMD Value
₹4,995
Closing Date
16 Mar 2026, 11:00 amClosed
Sr.Executiv Engineer
O/o Sr.Executiv Engineer
Tender for Prov new GO AB Switch and DO Fuse unit replacement of damaged GO AB Switch at various spur lines of 22 KV Kotli Feeder and 22 KV Talyhar Feeder UESD HPSEBL Saigaloo Ch to TS 04 2020 21 WBS D 20 0112
2026_HPSEB_129037_1
MED/S-169/2025-26
Open Tender
Supply and Erection
O/o Sr.Executiv Engineer
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹4,995
30 Apr 2026
20 Feb 2026
16 Mar 2026
20 Feb 2026
16 Mar 2026
20 Feb 2026
Supply Part
ST Pole 9 Mtr. Long
AAAC 7/3.15 for Jumper (55 mm2)
22 KV GO Switch, 400 Amp. (Porcelain Type)
22 KV DO Fuse Units (Porcelain Type)
MS, C.I. X-arms (2800x100x50x5mm), 9.56 kg/Mtr.
MS, C.I. X-arms (1800x100x50x5mm), 9.56 kg/Mtr.
C.I. X-arms (2800x75x40x6 mm) for GO & DO Switch
A.I. X-arms (2800x50x50x6) for supporting Pin Insulator
22 kV (Cross Bracing set) MS Angle Iron for Belting 50X50X6mm L=1500 mmX2 Nos & L=2800mmx2 Nos
MS A.I. Knee Bracing set [2X AI 750x50x50x6 mm]
Prov. Disc insulator String (Strain) sets: 2 No. Discs in each string, (Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps,Straight stapples & Bend Stapples etc.) x (Left / Right Circuit: 6 No. conductors) x (2 No. sides)/Dead Structures
C.I for GO Switch Handle Supporting (460x75x40x6mm)
GI Wire 6 SWG for Earthing
M.S Support Clamp for supporting GO Switch C. I.
Stay set complete in all respect ( i/c Stay Clamp)
Stay Wire (7/4.00 mm) (9.0 kg Per Stay Set)
Half clamps
Full Clamp
Nuts & Bolts off sizes
Aluminium Paint, Superior Quality, @ 1 Ltr./4/Fitting
Erection Part
Sagging of 30 mm2 conductor complete in all respect
Erection of 9Mtr St Pole complete in all respect
Erection of 22 KV GO Switch complete in all respect
Erection of 22 KV DO Fuse Unit complete in all respect
Erection of Stay Set complete in all respect
Mannual carriage of ST Pole with other line material from road to site of work with avg. lead of 0.100 Km
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
169BID.pdf
Tender Documents • 0.70 MB
BOQ_190764.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid