Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.2 Cr+₹48.1 L (65.1%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.3 Cr+₹57.1 L (77.3%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.4 Cr+₹71.1 L (96.2%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Venus Engineering Services L1 | M/s. SARKAR AND SARKAR L2 | Dinesh Infraprojects Pvt. Ltd. L3 | M/S SAHA AND MONDAL CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Evacuation of settled ash from the ash pond no.-1 and / or ash pond no-2 ash by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading at destination at ( approved disposal areas i.e in mines / quarry) including the carriage of the same for any distance for any lift and lead at both loading and unloading points, dressing at desired level at disposal areas including covering up the filled ash with 300 mm thick earth after attaining the required level, all as per direction of the EIC.
No leakage and spillage of ash from dumper should be maintained. Water is to be sprinkled at the loading point as well as the unloading point including movement road to prevent air pollution. Approaches inside the pond at different stages should be prepared suitably for easy and smooth movement of excavators, dumpers etc.
Excavations should be done in correct profile, slope and providing proper berms at respective levels without damaging the safety and stability of the existing embankment of ash pond, including mending damages and rectification of existing embankment as per direction of Engineer-in -Charge, if required.
The rate includes any dewatering of ash pond and excavated pits, necessary for execution of work, arising out of seepage, rains and whatsoever.
(Measurement will be made on the basis of pre-work and post-work levels of the ash pond).
Approved disposal areas should be arranged by the agency beyond a distance of 2 KM radius from Ash Pond. | 1,00,000 | Cu.M. | - | - | - | - |
Tender Value
₹1.1 Cr
Closing Date
7 Apr 2020, 3:00 pmClosed
The GM,STPS
M and C Dept, Santaldih Thermal Power Station, Santaldih, Dist- Purulia, West Bengal PIN- 723146.
Evacuation of ash (100000 Cu.M.) from ash pond no.1/2, transportation, disposal in eco friendly manner at STPS.
2020_WBPDC_280625_1
WBPDCL/STPS/NIT/E2041/19-20
Limited
Support/Maintenance Service
Item Rate
60 days
STPS, WBPDCL
As mentioned in tender document.
3 documents required · 3 mandatory
₹0
Exempted
24 Apr 2020
19 Mar 2020
11 Apr 2020
19 Mar 2020
7 Apr 2020
20 Mar 2020
Amount
Evacuation of settled ash from the ash pond no.-1 and / or ash pond no-2 ash by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading at destination at ( approved disposal areas i.e in mines / quarry) including the carriage of the same for any distance for any lift and lead at both loading and unloading points, dressing at desired level at disposal areas including covering up the filled ash with 300 mm thick earth after attaining the required level, all as per direction of the EIC. No leakage and spillage of ash from dumper should be maintained. Water is to be sprinkled at the loading point as well as the unloading point including movement road to prevent air pollution. Approaches inside the pond at different stages should be prepared suitably for easy and smooth movement of excavators, dumpers etc. Excavations should be done in correct profile, slope and providing proper berms at respective levels without damaging the safety and stability of the existing embankment of ash pond, including mending damages and rectification of existing embankment as per direction of Engineer-in -Charge, if required. The rate includes any dewatering of ash pond and excavated pits, necessary for execution of work, arising out of seepage, rains and whatsoever. (Measurement will be made on the basis of pre-work and post-work levels of the ash pond). Approved disposal areas should be arranged by the agency beyond a distance of 2 KM radius from Ash Pond.
M/s. SARKAR AND SARKAR
Dinesh Infraprojects Pvt. Ltd.
M/S SAHA AND MONDAL CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_518755.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .