Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹30.7 LAccepted-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L-1 | Accepted-AOC Contract placed on L-1 bidder after TEC recommendation and approval of competent authority | |
| 2 | L-2₹40.5 L+₹9.7 L (31.6%)Rejected-Finance | L-2 | Rejected-Finance Quoted L-2 value |
| Sl No | Description | Qty | Unit | TECHNO ENGINEERING L1 | DEVO ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Description of job | |||||
| 1.01 | Dry Cleaning Job
Dry cleaning of all 04 ESP Pass starting from ESP inlet funnel to ESP outlet funnel, all hoppers, gas distribution baffles, all emitting and collecting electrodes and other allied zones. Four (04)
Separate gangs have to be deployed to carry out Dry cleaning of all 04 ESP Passes simultaneously. to remove the deposited ash within 03 Days from hand over of ESP. | 1 | LUM | 1,25,000 ₹1,25,000 Lowest | 2,75,000 ₹2,75,000 |
| 1.02 | Water Washing of ESP Internals
Water washing of all ESP Pass starting from ESP inlet funnel to ESP outlet funnel, all hoppers, gas distribution baffles, all emitting and collecting electrodes and other allied zones. Heavy water force during water washing should not be applied directly to the plates. Four (04) Separate gangs have to be deployed to carry out water washing all 04 ESP Passes simultaneously and complete within 02 Days. | 1 | LUM | 1,75,000 ₹1,75,000 Lowest | 1,95,245 ₹1,95,245 |
| 1.03 | Inspection of All ESP Fields
Inspection of all ESP Field(Collecting Electrodes, Emitting
Electrodes, Entire Rapping system, GD Screen, Hopper Baffle
Plates and all other allied zones) | 1 | LUM | 75,000 ₹75,000 Lowest | 1,15,000 ₹1,15,000 |
| 1.04 | Checking of Collecting Plates
Rectification of bend, & displaced collecting Electrodes by heating,
light Hammering if required. 01 no =01 ESP Field. | 36 | NO | 18,500 ₹6,66,000 Lowest | 24,500 ₹8,82,000 |
| 1.05 | Checking of Emitting Wires
Replacement of damaged emitting Electrodes with new one if
required. 01 no =01 ESP Field. | 36 | NO | 7,000 ₹2,52,000 Lowest | 8,450 ₹3,04,200 |
| 1.06 | ESP Field Gauging Job
Alignment checking, Gaging & thickness measuring of collecting
Plates of all ESP Fields. 01 no =01 ESP Field | 36 | NO | 4,000 ₹1,44,000 Lowest | 4,625 ₹1,66,500 |
| 1.07 | CERM Shaft replacement Job
Total Replacement of CERM Rapping System (CERM Shaft,
Hammers, Bearings etc) of total 08 Fields
(A4,A5,B4,B5,C4,C5,D4 & D5). 01 no =01 ESP Field. | 8 | NO | 31,500 ₹2,52,000 Lowest | 36,250 ₹2,90,000 |
| 1.08 | EERM Shaft replacement job
Total Replacement of EERM Rapping System (EERM Shaft (Vertical & Horizontal), Hammers, Bearings, Pin Wheels etc.) of total 08 Fields (A4, A5, B4, B5, C4, C5, D4 & D5). 01 no
=01 ESP Field. | 8 | NO | 5,500 ₹44,000 Lowest | 8,100 ₹64,800 |
| 1.09 | Checking/rectification of CRM/ERM/GDRM
Rectification of Collecting Rapping Mechanism (CERM) (total 28
nos.), Emitting Rapping Mechanism (EERM) (total 28 nos.) &
Gas Distribution Rapping Mechanism (GDRM) (total 4 nos.),
Shock Bar assembly, Anvil, Pad, and replacement of all other
damaged components as required. | 60 | NO | 5,450 ₹3,27,000 Lowest | 5,850 ₹3,51,000 |
Tender Value
₹32.6 L
EMD Value
₹65,297
Closing Date
19 Jun 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The General Manager STPS
Admin Building, STPS,Purulia,W.B., 723146
Service Contract for U5 ESP Overhauling Job, Dec-2025 under AHP-EM of STPS Site
2025_WBPDC_848787_1
WBPDCL/STPS/NIT/E4050/25-26
Open Tender
Support/Maintenance Service
Item Rate
365 days
Admin Building, STPS, W.B.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹65,297
Yes
M and C Dept. STPS, Admin Building, STPS,Purulia
13 Sept 2025
26 May 2025
21 Jun 2025
26 May 2025
19 Jun 2025
3 Jun 2025
2 Jun 2025
Amount
Description of job
Dry Cleaning Job Dry cleaning of all 04 ESP Pass starting from ESP inlet funnel to ESP outlet funnel, all hoppers, gas distribution baffles, all emitting and collecting electrodes and other allied zones. Four (04) Separate gangs have to be deployed to carry out Dry cleaning of all 04 ESP Passes simultaneously. to remove the deposited ash within 03 Days from hand over of ESP.
Water Washing of ESP Internals Water washing of all ESP Pass starting from ESP inlet funnel to ESP outlet funnel, all hoppers, gas distribution baffles, all emitting and collecting electrodes and other allied zones. Heavy water force during water washing should not be applied directly to the plates. Four (04) Separate gangs have to be deployed to carry out water washing all 04 ESP Passes simultaneously and complete within 02 Days.
Inspection of All ESP Fields Inspection of all ESP Field(Collecting Electrodes, Emitting Electrodes, Entire Rapping system, GD Screen, Hopper Baffle Plates and all other allied zones)
Checking of Collecting Plates Rectification of bend, & displaced collecting Electrodes by heating, light Hammering if required. 01 no =01 ESP Field.
Checking of Emitting Wires Replacement of damaged emitting Electrodes with new one if required. 01 no =01 ESP Field.
ESP Field Gauging Job Alignment checking, Gaging & thickness measuring of collecting Plates of all ESP Fields. 01 no =01 ESP Field
CERM Shaft replacement Job Total Replacement of CERM Rapping System (CERM Shaft, Hammers, Bearings etc) of total 08 Fields (A4,A5,B4,B5,C4,C5,D4 & D5). 01 no =01 ESP Field.
EERM Shaft replacement job Total Replacement of EERM Rapping System (EERM Shaft (Vertical & Horizontal), Hammers, Bearings, Pin Wheels etc.) of total 08 Fields (A4, A5, B4, B5, C4, C5, D4 & D5). 01 no =01 ESP Field.
Checking/rectification of CRM/ERM/GDRM Rectification of Collecting Rapping Mechanism (CERM) (total 28 nos.), Emitting Rapping Mechanism (EERM) (total 28 nos.) & Gas Distribution Rapping Mechanism (GDRM) (total 4 nos.), Shock Bar assembly, Anvil, Pad, and replacement of all other damaged components as required.
Gearbox Servicing Job of CRM/ERM/GDRM Servicing of gear boxes of all CERM, GDRM and EERM including oil leakage rectification, Gasket change, Oil seal replacement, Looking Glass replacement or replacement of damaged one by New Gear Box.
Replacement of Hopper Heaters Replacement of Damaged Hopper heaters by New heaters.
Replacement of Support Heaters Replacement of Damaged Support Insulator heaters by New heaters.
Replacement of Shaft Heaters Replacement of Damaged Shaft Insulator heaters by New heaters
Checking of Hopper Heater Jacket Checking & Leakage Rectification of Hopper Heater Jacket for each ESP Hopper.
HV Disconnecting Switch Box Cleaning and tightness checking of Disconnecting Switch boxes with cleaning and replacement of damaged Pin Insulators (total # 108 nos). 01 no =01 ESP Field.
Cleaning/Checking of Support Insulator Checking, Cleaning & Rectification (if any) of Support Insulators.
Cleaning/Checking of Shaft Insulator Checking, Cleaning & Rectification (if any) of Shaft Insulators. 01 no =01 ESP Field.
Replacement of Thermostat for Hoppers Replacement of Damaged thermostats for Hoppers Heaters.
ESP Manhole Door repairing Job Repairing of ESP Man Hole Doors & Hopper Doors along with air tight ness checking
Door Gasket replacement job Replacement of Asbestos Rope of all ESP Man Hole Doors & Hopper Doors.
Checking/repairing of GD Screen Rectification / Replacement of GD Screen (02 Stages) if required.
Checking/repairing of Baffle Plates Rectification / Replacement of Baffle Plates if required. 01 no=01 ESP Field.
Replacement of all DLI Probes
Replacement of all DLI Controllers
ESP internal Leakage rectification Job Any type of fabrication job to set right the ESP internal and leakage rectification of ESP Roof Top, ESP Hopper and ESP Wall to resist water and air ingress in ESP if required.
Assistance during GD Test Man power support & assistance during GD Test.
Painting Job Painting of all ESP equipment's ( Disconnecting Switch Box, Support insulator Box, Shaft Insulator Box, Man Hole Doors of CERM,GDRM, Hopper Doors, CERM,EERM,GDRM Gear Box. Also, Nomenclature Painting must be done after Painting job.
Collecting Plate Repairing Job Rectification Job of collecting plates for U#5, ESP during O/H. The Job includes Fixing /repairing of collecting plates & Realignment of collecting plates.
DEVO ENTERPRISE (BID ID -6599494)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .