Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
11 Feb 2022, 11:00 amClosed
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Main Engine Controls and Auxiliary Engine Controls of MV Vishva Vijetha, on turnkey basis
2022_HSL_88793_1
20 / 22002 / Control Panels / 194 / 2021-22
Open Tender
Miscellaneous Services
Turn-key
30 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹525
Yes
HSL
₹10,000
Yes
14 Feb 2022
28 Jan 2022
11 Feb 2022
28 Jan 2022
11 Feb 2022
28 Jan 2022
Amount
ME REMOTE CONTROL SYSTEM AUTOMATION & INSTRUMENTATION
WECS-9520 TO BE CHECKED FOR PROPER FUNCTIOING.
WHILE STARTING M/E ,IT TAKES TOO MUCH AIR WHEN RUNNING ON DIESEL OIL AS COMPARED TO SEA TRIAL REPORT,FAULT TO FIND AND RECTIFY.
ME REMOTE CONTROL SYSTEM AND SAFEGUARD SYSTEM TO BE THOROUGHLY CHECKED.ALL PENUMATIC,ELECTRICAL AND ELECTRONIC COMPONENTS TO SERVICE,DEFECTIVE COMPONENTS TO BE REPAIRED. RENEW THE DEFECTIVE COMPONENTS/MATERIAL SUPPLIED BY CONTRACTOR
ME EXHAUST GAS REMOTE PYROMETERS SYSTEM TO CALIBRATE AND TO PROVE IN WORKING CONDITION.ALSO DEFECTIVE MATERIAL HAS TO BE SUPPLIED AND REPLACED BY THE CONTRACTOR
ME RPM INDICATORS (LOCAL; ECR; BRIDGE AND CEO'S DAY ROOM);TO BE CALIBRATED AND DEFECTIVE MATERIAL TO BE REPLACED BY THE CONTRACTOR
ENGINE TELEGRAPH AND BRIDGE TELEGRAPH TO BE SERVICED .THE DEFECTIVE COMPONENTS/MATERIAL SUPPLIED BY CONTRACTOR
ALL ALARM PANELS TO SERVICE AND RECTIFY ERRATIC ALARM CONDITIONS.TO STIMULATE VARIOUS ALARMS AND PROVE SATISFACTORY INDICATIONS.IF ANY MATERIAL FOUND DEFECTIVE TO BE SUPPLIED BY THE CONTRACTOR
ME JACKET COOLING WATER, LT WATER, LUB OIL TEMPERTAURE CONTROLLERS TO BE SERVICED . ALL TEMPARTURE SENSORS TO SERVICE AND CALIBRATE.DEFECTIVE MATERIAL TO BE SUPPLIED BY THE CONTRACTOR
ME PISTON COOLANT NON FLOW ALARMS FUNCTIONING TO CHECK,ANY DEFECT TO RECTIFY.THE REQUIRED MATERIAL TO BE SUPPLIED AND RENEWED BY THE CONTRACTOR
ME TURBOCHARGER OIL NON FLOW ALARMS FUNCTIOING TO CHECK,ANY DEFECT TO RECTIFY.THE REQUIRED MATERIAL TO BE SUPPLIED AND RENEWED BY THE CONTRACTOR
ME CRANKCASE OIL MIST DETECTOR (GRAVINIER MK6) TO BE SERVICED AND TO CHECK SENSITIVITY AND ZERO SETTING ALL SAMPLING TUBES TO CLEAN.OIL MIST DETECTOR TO BE SATISFACTORILY SURVEYED BY CLASS SURVEYORS.THE REQUIRED MATERIAL TO BE SUPPLIED AND RENEWED BY THE CONTRACTOR
ME FUEL OIL VISCOSITY CONTROLLER TO BE SERVICED AND CALIBRATED. IF DEFECTIVE SAME TO RECTIFIED AND REQUIRED MATERIAL TO BE SUPPLIED BY CONTRACTOR
PRESSURE SWITCHES FOR AUTO STARTING OF ESSENTIAL PUMPS MOTORS TO SERVICE,DEFECTIVE ONES TO RENEW/REPAIR,SATISFACTORY TRIALS TO BE SHOWN TO ELO/CEO.MATERIAL REQUIRED FOR PROVING OF THE SYSTEM TO BE SUPPLIED BY THE CONTRACTOR.
ME CRANK ANGLE SENSOR BELT TO BE REPLACED AS PER MAKER INSTRUCTION MANUAL YARD HAS TO ARRANGE WARTSILA SERVCIE ENGINEER FOR JOBS.DRIVE TO BE OVERHAULED.BELT AND SPARES SHIP SUPPLY.CRANK ANGLE SENSOR TO BE ADJUSTED.MATERIAL REQUIRED FOR PROVING OF THE SYSTEM TO BE SUPPLIED BY THE CONTRACTOR.
A COMPLETE OVERHAUL OF ME PNEUMATIC LOGIC BOX AT BOTTOM PLATFORM REQUIRED.MATERIAL REQUIRED FOR PROVING OF THE SYSTEM TO BE SUPPLIED BY THE CONTRACTOR.
ALARM MONITOTRING SYSTEM & WECS SOFTWARE/HARDWARE TO BE UPDATED AND NOTICE DEFECT TO BE RECTIFIED.
E21029 ITEM : AUXILIARY ENGINE AUTOMATION & INSTRUMENTATION
TO CHECK & SERVICE AUXILIARY ENGINE CONTROL SYSTEM FOR AUTOMATION SEQUENCE OF AUTO STAND BY,AUTO START,AUTO LOADING & AUTO STOP.THE SYSTEM HAS TO BE THROUGHLY CHECKED AND FAULTS TO BE RECTIFIED.MATERIAL REQUIRED FOR PROVING OF THE SYSTEM INCLUDING BOOSTER RELAYS TO BE SUPPLIED BY THE CONTRACTOR
TO OVERHAUL MAIN STARTING VALVE,STARTING MOTOR,EMERGENCY STARTING VALVE,STOP CYLINDER AND OVER SPEED DEVICE.MATERIAL REQUIRED FOR PROVING OF THE SYSTEM TO BE SUPPLIED BY THE CONTRACTOR.
FOR ALL THREE A.E.S TO CHECK AND CALIBERATE ALL IMPORTANT PRESSURE GAUGES,REMOTE TEMPERATURE GAUGES, PRESSURE TRANSMITTERS AND TACHOMETERS.CALIBERATION CERTIFICATES TO BE ISSUED.DEFECTIVE MATERIAL TO BE RENEWED BY THE CONTRACTOR
THE FOLLOWING ALARMS AND TRIPS OF ALL THREE A.E'S ARE TO BE CALIBRATED AND SET POINT TO BE ADJUSTED AS PER THE OEM MANUAL.CALIBRATION REPORT TO BE SUBMITTED FOR THE CALIBRATED EQUIPMENTS AND THE REQUIRED MATERIAL HAS TO BE SUPPLIED BY THE CONTRACTOR FOR PROVING OF THE SYSTEM
a)C.W. INLET LOW PRESSURE ALARM
b)L.O.INLET LOW PRESS
c)C.W. HIGH TEMP.ALARM
d)L.O.INLET HIGH TEMP
e) EXHAUST GAS HIGH TEMP
f)OVER SPEED
ALL THREE A/E LOCAL START FROM PANEL TO BE MADE OPERATIONAL.
Following E/R temperature and pressure gauges, ECR Console gauges on various machineries are to be calibrated by removing and refitment back the existing guage with the standard gauge. Calibration certificates are to be issued to the gauges and the same are to be valid for a period of one year from calibrated date. Calibrate the gauges, temperature and pressure gauges.The Gauges found defective during calibration are to be renewed by the contractor of same material, size and range with glycerin filled. PYROMETERS/THERMOMETERS, SYSTEM / /RANGE (Deg C)
M/E EXHAUST GAS OULET 0-600
M/E TURBOCHARGER IN/OULET 0-600
M/E AIR COOLER AIR IN/OULET 0-100/0-160
M/E TURBOCHARGER C.WOULET 0-100
A/E EXH GAS OULLET(3 AES) 0-500
A/E TURBOCHARGER INLET(3 AES) 0-600
A/E TURBOCHARGER OULET(3 AES) 0-600
A/ES C.W. INLET 0-100
A/ES C.W. OULET 0-100
A/ES AIR COOLER AIR INLET 0-200
A/ES AIR COOLER AIR OULT 0-100
A/ES ALTERNATOR BEARING 0-100
BOILER F.O HEATER IN/OULET 0-160
ME VISCOTHERM 0-200
ME LUB OIL COOLER L.O IN/OUT 0-100
ME JACKET COOLER L.O IN/OUT 0-100
ME THRUST BEARING LUB OIL 0-101
ECR TEMP.GAUGES
ME L.O INLET TEMP 0-100
ME T/C BEARING OIL TEMP 0-150
ME F.O. TEMP 0-200
ME FRESH COOL WATER INLET 0-150
FWD S/T BRG L.O.TEMP 0-100
AFT S/T BRG L.O.TEMP 0-100
A/E PUF UNIT OUTLET TEMP 0-101
PRESSURE GAUGES, / SYSTEM RANGE (BAR)
STEERING GEAR 0-250
AIR COMPRESSORS 0-10
AIR RECEIVER(MAIN) 0-50
AIR RECEIVER(CONTROL) 0-15
AUX.ENGINE 0-10
AUX.ENGINE 0-16
ME L.O.P/P DEL. 0-10
ME ST.BY CONT AND SAFETY AIR 0-16
ME EXH V/V SPRING(ECR & LOCAL) 0-10
ME F.O.& L.O. AT EM STAND 0-25
ME FUEL V/V TESTING UNIT 0-600
VIBRATION DAMPER 0-250
EXH.GAS ECONOMIZER 0-16
AE FUEL V/V TESTING UNIT P/P 0-500
HYD P/P FOR MAINTENANCE 0-1000
BUNKER LINE PRESSURE GAUGES 0-17
ECR PRESSURE GAUGES:-
ME COOL S.W.DISCH.PR 0-4
ME JCW COOLING PR 0-6
ME LO INLET PR 0-6
ME SCAVENGE AIR PR 0-6
STARTING AIR BEFORE V/V PR 0-40
CONTROL AIR PR 0-6
STARTING AIR AFTER V/V PR 0-40
CHARGE AIR 0-4
ME AIR RECEIVER 0-40
CONTROL AIR RECEIVER 0-10
EXH V/V AIR SPRING 0-10
BLR DRUM PR 0-11
MANOEUVRING PLATFORM
AIR SPRING 0-10
CYL/COOLING WATER 0-6
STARTING AIR 0-40
SUPERCHARGE AIR 0-4
COOLING WATER AIR COOLER 0-10
MAIN S.W. P/P SUC -1-5
MAIN S.W. P/P DISCH 0-10
BALLAST P/P SUC -1-7
BALLAST P/P DISCH 1-9
FIRE & G.S. P/P SUC -1-5
FIRE & G.S. P/P DISCH 0-10
BILGE & G.S. P/P SUC -1-5
BILGE & G.S. P/P DISCH 0-10
AKSHAY CONTROLS AND SYSTEMS PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .