Loading…
Loading…
Tender Value
₹4.7 L
EMD Value
₹10,000
Closing Date
12 Oct 2026, 10:30 am5d left
Executive Engineer
Division No.1, HPPWD Bilaspur
Demolition, wood work, tile work, distempering and painting etc.
2026_PWD_145064_8
PW-BLP1-E-proc/26-9991-10040 dt 29.9.26
Open Tender
Civil Works - Buildings
Percentage
30 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹10,000
6 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50m (Fifty metres) lead as per direction of Engineer - in - charge. Nominal concrete 1:1.5:3 ((One cement : One point five coarse sand : Three) or leaner mix (i/c equivalent design mix) . including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other construction worker welfare cess, royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 11.53 | Per Cubic Meter | 297.03 | ₹3,424.76 |
| 2 | Providing and fixing panelled glazed or panelled and glazed shutters for doors windows and clerestory windows. Including black enamelled iron butt hinges with necessary screws. 40mm (Forty milimetre) thick 2nd (Second) class teak wood. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 4.03 | Per Square Meter | 3,855.95 | ₹15,539.48 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) . including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 1.28 | Per Cubic Meter | 4,478.3 | ₹5,732.22 |
| 4 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% (Zero point zero eight percent) and conforming to IS:15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (One cement : four coarse sand), jointing with grey cement slurry @ 3.3 Per Kilograme/ Per Square Meter (Three point three kilograme / Per Square Metre) including grouting the joints with white cement and matching pigments etc., complete size tiles 600x600 mm. (Six hundred into six hundred milimetre) including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 55.87 | Per Square Metre | 1,076.27 | ₹60,131.2 |
| 5 | Distempering with dry distemper of approved brand and manufacture(Two coats) and of required shade on undecorated wall surface to given an even shade over and including primer coat of whiting after thoroughly brushing the surface free from mortar droppings and other foreign matter including preparing the surface even and sand papered smooth. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 141.21 | Per Square Meter | 68.4 | ₹9,658.76 |
| 6 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 Per Square Meter (Zero point nine zero litre / ten quare metre) over an under coat of primer applied @0.75 ltr/10Per Square Meter (Zero point seventy five litre / ten quare metre) of approved brand and manufacture. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 102.69 | Per Square Metre | 82.05 | ₹8,425.71 |
| 7 | Painting two coats (excluding priming coat) of ICI/ NAROLEC / BURGER/ ASIAN PAINT/ SHALIMAR on new wood and wood based surfaces with enamel paint brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stopping with white enamel paint. as per HP.PWD Specification clause 16. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 67.34 | Per Square Meter | 76.27 | ₹5,136.02 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering as per drawings & technical specification in cement concrete 1:1.5:3 (One cement : One point five coarse sand : Three graded stone aggregate 20 mm (Twenty milimetre) nominal size). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 1.89 | Per Cubic Metre | 5,767.15 | ₹10,899.91 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 283.5 | Per Kilograme | 76.25 | ₹21,616.88 |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, (excluding Goods Service Tax), building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 1,132.68 | Kilograme | 88.98 | ₹1,00,785.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.58 MB
8SBDHorticulture473457.pdf
Tender Documents • 3.23 MB
BOQ_215962.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .