| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹51.9 LAccepted-AOC | L-1 | Accepted-AOC AOC | |
| 2 | L-2₹44.9 L+₹92,850.86 (2.11%)Rejected-Finance | L-2 | Rejected-Finance PRICE QUOTED HIGH |
Tender Value
₹44.0 L
EMD Value
₹1.0 L
Closing Date
6 Jan 2024, 5:00 pmClosed
SE IRRIGATION WORK CIRCLE RUDRAPRAYAG
OFFICE OF SUPERINTENDING ENGINEER IRRIGATION WORK CIRCLE RUDRAPRAYAG
Renovation of 11 no. hill irrigation canals in block Augustyamuni of distirct Rudraprayag under NABARD (Job-1 Silla, Baman, Falai and Thapalgaon)
2023_IRDCE_66695_1
06/SE/2023-24 DATED 16-12-2023
Open Tender
Civil Works
Item Rate
270 days
DISTRICT RUDRAPRAYAG
AS PER STANDARD BIDDING DOCUMENT
2 documents required · 2 mandatory
₹4,720
EXECUTIVE ENGINEER IRRIGATION DIVISION KEDARNATH
₹1.0 L
IRRIGATION WORK CIRCLE RUDRAPRAYAG
19 Mar 2024
21 Dec 2023
9 Jan 2024
21 Dec 2023
6 Jan 2024
25 Dec 2023
23 Dec 2023
Amount
BLOCK-AUGUSTYAMUNI (Silla, Baman, Falai and Thapalgaon)
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 , Nominal mix 1:2.4 (Hand mixing).
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction.
Pointing with cement mortar (1:3) on bri.ckwork as per drawing and technical specification Clauses 613.3 and 1204.
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204.
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction.
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge.
Providing, Lowering into trenches with true to alignment, Laying & Jointing of Full Length of HDPE pipe 315 mm dia PE 63 grade PN6 (6.0 Kg/Cm2) as per IS:4984-1995 abd specifications with testing of pipe line etc. all complete.
S M RANA CONSTRUCTION PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .