| 1 | L1₹188.2 CrAdmitted-Finance PLOT NO 21 INSTITUTIONAL AREA SECTOR 44 GURUGRAM HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹188.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹208.6 CrAdmitted-Finance | ₹208.6 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 7 PKT 3 PH 1 GURU GORAKHNATH MANDIR NIRMAN SAMITI REGD DWARKA SOUTH WEST DELHI DELHI 110045 UDYAM DL 06 0003026 07AAICB3899D1ZG B 05AAICB3899D1ZK M 07AAICB3899D1ZG R MSME STATUS AS VERIFIED | SOUTH WEST DELHI | DELHI | 110045 | - | - | Not Admitted-Fee/PreQual/Technical Others-The bidder have not submitted tender fee and EMD. They also not submitted hard copy of the tender. |
| Sl No | Description | Qty | Unit | Infinite Computer Solutions India Limited L1 | Fluentgrid Limited L2 |
|---|---|---|---|---|---|
| 1.00Part- 'A' Bill of Material for Data Center, Dehradun | |||||
| 1.10Metering, Billing Collection (MBC)/ Constomer Information System (CIS) Solution | |||||
| 1.11 | Software Licenses / Subscription for Metering, Billing, Collection, New Connection, Disconnection, Customer information system, web services, middleware, integation software, databases and related softwares etc. to run complete billing system with software support from OEM till GO-LIVE of system | 1 | Lot | 20,00,00,000 ₹20 Cr | 12,00,00,000 ₹12 Cr |
| 1.12 | Website, consumer web portal including third party integration ( payment gateways, SMS, Govt. portals etc.) and development cost | 1 | Lot | 80,00,000 ₹80 L | 55,00,000 ₹55 L |
| 1.13 | Consumer mobile application for iOS and Android development cost | 1 | Lot | 80,00,000 ₹80 L | 27,50,000 ₹27.5 L |
| 1.14 | Billing mobille Application development cost | 1 | Lot | 55,00,000 ₹55 L | 33,00,000 ₹33 L |
| 1.15 | Field Activity Management Application for iOS and Android development cost | 1 | Lot | 80,00,000 ₹80 L | 16,50,000 ₹16.5 L |
| 1.16 | Other mobile Applications development cost | 1 | Lot | 65,00,000 ₹65 L | 16,50,000 ₹16.5 L |
| 1.17 | Call Centre Application (Dialer) with 70 nos. concurrent users with support from OEM till Go-Live period | 70 | No. | 1,15,000 ₹80.5 L | 2,57,142.86 ₹1.8 Cr |
| 1.18 | Development of Chat Bot and Whatsapp services for UPCL and its integration with Billing and other applications | 1 | Lot | 15,00,000 ₹15 L | 26,50,000 ₹26.5 L |
Tender Value
₹199.3 Cr
EMD Value
₹4 Cr
Closing Date
24 Jan 2025, 5:00 pmClosed
SE RAPDRP PART A
V C V Gabar Singh Urja Bhawan, Balliwala chowk, Dehradun-248001
Appointment of System Integrator (SI) for implementation of Utility Billing system in UPCL
2024_UPCL2_75179_2
01/RDSS (Billing)/2024-25
Open Tender
Info. Tech. Services
Dehradun
As per tender document
6 documents required · 6 mandatory
₹29,500
Executive Engineer RAPDRP Part A UPCL
₹4 Cr
24 Feb 2025
2 Jan 2025
25 Jan 2025
2 Jan 2025
24 Jan 2025
7 Jan 2025
Amount
Part- 'A' Bill of Material for Data Center, Dehradun
Metering, Billing Collection (MBC)/ Constomer Information System (CIS) Solution
Software Licenses / Subscription for Metering, Billing, Collection, New Connection, Disconnection, Customer information system, web services, middleware, integation software, databases and related softwares etc. to run complete billing system with software support from OEM till GO-LIVE of system
Website, consumer web portal including third party integration ( payment gateways, SMS, Govt. portals etc.) and development cost
Consumer mobile application for iOS and Android development cost
Billing mobille Application development cost
Field Activity Management Application for iOS and Android development cost
Other mobile Applications development cost
Call Centre Application (Dialer) with 70 nos. concurrent users with support from OEM till Go-Live period
Development of Chat Bot and Whatsapp services for UPCL and its integration with Billing and other applications
Complete Billing Data Migration
Complete existing Billing Data Migration including testing and validation work into new application software for Billing.
Compute
Compute
Network and Security Devices
Firewall External with anti APT device
Firewall Internal
Spine Switch
Leaf Switch
Load Balancer
Web Application Firewall (WAF)
SDWAN device for DC with management dashboard
Supply and installation of SDWAN for Field Devices in UPCL offices spread across Uttarakhand.
SSL VPN Zero Trust Network Access (ZTNA)
L3 Switch
L3 Switch with all fiber switch
UPS & Battery System
Online modular UPS System with battery 75 KVA or better with two power module of 25 KVA or better with battery bank and isolation transformer
Online modular UPS System with battery 75 KVA or better with two power module of 25 KVA or better with battery bank and isolation transformer
Storage system
Storage Primary
Storage Secondary
Tape Library
SAN Switch
Software License-Application
Identity and Access Management
Backup Software
EMS/NMS Solution (For 500 Devices)
Help Desk Solution (Minimum 25 nos. concurrent users)
Additional Software Licenses
Virtualization
Operating System
Implementation Cost
Installation, testing and commissioning charges for all hardware, application, database and integration with other systems etc.as per the proposed solution including manpower cost before Go-Live period.
Additional Items
Additional item 1
Additional item 2
Additional item 3
Additional item 4
Additional item 5
Description of Work / Item(s)
Amount
Part- 'B' Bill of Material for Disaster Recovery Center, Haldwani
Compute
Compute Servers
Network and Security Devices
Firewall External with anti APT device
Firewall Internal
Spine Switch
Leaf Switch
Load Balancer
Web Application Firewall (WAF)
SDWAN device for DR with management dashboard
SSL VPN Zero Trust Network Access (ZTNA)
L3 Switch
Storage & Backup Devices
Storage Primary
Storage Secondary
Tape Library
SAN Switch
UPS and Battery System
Online modular UPS System without battery 75 KVA or better with two power module of 25 KVA or better without battery bank and isolation transformer
Online modular UPS System without battery 75 KVA or better with two power module of 25 KVA or better without battery bank and isolation transformer
Additional Software Licenses
Virtualization
Operating system
DC DR Drill
DC DR drill for entire Billing system with web portals and apps including automation software
Implementation Cost
Installation, testing and commissioning charges for all hardware, application and database etc.as per the proposed solution.
Description of Work / Item(s)
Amount
Part- 'C' Bill of Material for GIS Work- Survey
Survey
Procurement of Satelite Imageries and preparation of base map
HT (66/33 KV) overhead lines/ underground cables along with associated line equipments such as Poles, conductors, RMUs, DTRs, capacitors etc.
66/33, 66/11,33/11 KV Substation
HT (11 KV) overhead lines/ underground cables along with associated line equipments such as Poles, conductors, RMUs, DTRs, capacitors etc.
Painting of asset code on the surveyed electrical asset including surface preparation, base coat and final marking etc. as per UPCL requirement
Preparation of Digitized electrical network substation-wise on the base map in the pre-defined scale with features and attributes of assets and consumers migrated from third party database for GIS application
Description of Work / Item(s)
Amount
Part- 'D' Additional BoQ for Security and GIS
Compute
Compute
Network and Security Devices
EndPoint Protection (EPP) (Antivirus)
Web Security
E-mail Security
Large display screen
Large Display Screen (Minimum 55") for NMS/ Monitoring Software Display
Server Rack
Server Rack minimum 42 U with dual IPDU, cable manager, FAN and perforated front and back door, 2 nos. iPDU etc.
GIS Software, Implementation and migration
Software Licenses for GIS work complete including server licenses for hosting GIS application and minimum 4 concurrent desktop user for working on GIS server and other licenses of subsystem to run GIS application for all user of UPCL with software support from OEM till GO-LIVE of system
Third party Data integration of Consumer Data & LT Network (AMISP etc.) including validations and QA/QC
One time data migration cost for transferring, validating, QA/QC of UPCL existing GIS data to new developed GIS application
Implementation cost of Web based GIS Application
Implementation cost of Desktop Based GIS application
Implementation cost of GIS Mobile application
Security Compliances
Security audit of entire new applications, mobile apps including hardware, network and application Grey box testing, VAPT etc. from CERT-In empanelled agency
Development of Cyber security policy, Data Privacy policy, IT usage policy and backup policy etc. for UPCL inline with CEA/CERT-in guidelines
Development of ISMS policy and ISO certification 27001 or higher of UPCL Data Center and Disaster Recovery Center
Description of Work / Item(s)
Amount
Part- 'E' Wokstation, FMS & ATS
Workstation PCs
Supply and installation of WorkStation PC with monitor and UPS in different offices of UPCL spread across Uttarakhand.
Facility Management Services (FMS) Cost
Facility Management Services for providing support and manpower for the period of first year including software upgrade (including version upgrade) in MBC, Mobile apps, webportal and related applications after Go-Live period.
Facility Management Services for providing support and manpower for the period of Second year including software upgrade (including version upgrade) in MBC, Mobile apps, webportal and related applications after Go-Live period.
Facility Management Services for providing support and manpower for the period of third year including software upgrade (including version upgrade) in MBC, Mobile apps, webportal and related applications after Go-Live period.
Annual Technical Support (ATS) Cost after Go-Live period
Annual Technical Support (ATS)/ Annual support cost for the period of one year from the OEM of the Billing Software after Go-Live period
Annual Support Cost for the period of one year for website, web portal , third party integration, whatsapp, chatbot etc. after Go-Live period
Annual Technical Support (ATS)/ Annual Support Cost for the period of one year from the OEM of the Call Centre Application (Dialer) with 70 nos. concurrent users after Go-Live period
Annual Technical Support (ATS) /Annual Support Cost for the period of one year for all mobile applications after Go-Live period
Facility Management Services (FMS) Cost for GIS
Facility Management Services for providing support and manpower for the period of first year including software (including version upgrade) upgrade in GIS and related applications after Go-Live period.
Facility Management Services for providing support and manpower for the period of second year including software upgrade (including version upgrade) in GIS and related applications after Go-Live period.
Facility Management Services for providing support and manpower for the period of third year including software upgrade (including version upgrade) in GIS and related applications after Go-Live period.
Annual Technical Support (ATS) Cost after Go-Live period
Annual Technical Support (ATS)/ Annual Support Cost for GIS software after Go-Live period
Description of Work / Item(s)
Amount
Part- 'D' Buyback Hardware of Data Center, Dehradun
Buyback Hardware of Data Center, Dehradun
IBM x3650 M2
IBM x3650 M3
IBM x3950 X5
IBM X3550 M2 7511740
CISCO UCSC-C240-M4S-V02
IBM POWER S822 8284 22A
Wipro net power
HP Storage hsv100
Ultrim tape drive
HP Compaq ProLiant ML350
Sun Server Sun Fire X4150
IBM SAN storage 128 TB Raw Capacity DS8884
IBM Storage 64 TB Raw Capacity DS8300
SAN Switch cisco MDS 9509 (9 Slot)
IBM TS3500
Juniper- SRX 3400
Juniper-M320
Juniper- SA 6500
Radware App Director
JUNIPER STRM 500
JUNIPER IDP 8200
JUNIPER NSM 3000
Juniper Ex-8208
Juniper Ex-3200
CISCO-MCS-7800
UPS 40 KVA Eaton with isolation transformer
Battery bank (180 Nos* 2V * 200 AH)
Server/Network Rack
UPS 160 KVA Eaton with isolation transformer
Buyback Hardware of Disaster Recovery Center, Haldwani
IBM 7915 X3650 M4
IBM MT 7143 X3850 X5
CISCO UCSC-C240-M4S-V02
IBM POWER S822 8284 22A
IBM System Storage DS 8870
SAN Switch cisco MDS 9509 (9 Slot)
Tape Library IBM TS3500
Juniper SRX 3400
Juniper M320
Juniper J6350
Juniper EX8208
Juniper EX 3200
CISCO MCS 7800
JUNIPER NSM 3000
UPS 160 KVA Eaton with isolation transformer
Battery Bank (240 Nos X 600 AH X 2V)
UPS 40 KVA Eaton with isolation transformer
Battery bank (180 Nos X 2V X 200 AH)
Server/Network Rack
Fluentgrid Limited (BID ID -355421)
Infinite Computer Solutions India Limited (BID ID -355883)
Fluentgrid Limited (BID ID -355421)
Infinite Computer Solutions India Limited (BID ID -355883)
Fluentgrid Limited (BID ID -355421)
Fluentgrid Limited (BID ID -355421)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
FinalRFP01RDSSbillingwithAnnexs.pdf
Tender Documents • 8.62 MB
Corrigendum2withAnnexure.pdf
Other Document • 5.24 MB
CorrigendumXIwithAnnexures.pdf
Additional Documents • 1.66 MB
BOQ_94592.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid