| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.4 LAccepted-AOC | ₹60.4 L | L1 | Accepted-AOC 1st lowest bidder |
| 2 | L2₹60.5 L+₹7,927 (0.13%)Rejected-AOC | ₹60.5 L+₹7,927 (0.13%) | L2 | Rejected-AOC 2nd lowest bidder |
| 3 | L3₹61.3 L+₹85,929 (1.42%)Rejected-AOC | ₹61.3 L+₹85,929 (1.42%) | L3 | Rejected-AOC 3rd lowest bidder |
| 4 | L4₹67.8 L+₹7.4 L (12.2%)Rejected-AOC | ₹67.8 L+₹7.4 L (12.2%) | L4 | Rejected-AOC 4th lowest bidder |
| 5 | L5₹70.3 L+₹9.8 L (16.3%)Rejected-AOC | ₹70.3 L+₹9.8 L (16.3%) | L5 | Rejected-AOC 5th lowest bidder |
Tender Value
₹80.8 L
EMD Value
₹1.6 L
Closing Date
18 Jun 2024, 4:00 pmClosed
Executive Engineer, Township Division
Farakka Barrage Project, P.O. Farakka Barrage, Dist. Murshidabad, West Bengal, PIN 742212
As per tender document
2024_FBPF_811024_1
GM/FBP-09 of 2024-25
Open Tender
Civil Works
Item Rate
180 days
Farakka, Dist. Murshidabad, WB
As per tender document
2 documents required · 2 mandatory
₹0
₹1.6 L
Yes
1 Mar 2025
10 Jun 2024
19 Jun 2024
10 Jun 2024
18 Jun 2024
10 Jun 2024
Amount
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
Centering and shuttering including strutting, propping etc. and removal of form for all heights :foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at all level. Thermo-Mechanically Treated bars of grade Fe- 500D or more.
Brick work with clay fly ash non modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
M.S. or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor): Grill weighing above 16 Kg./sqm and above.
Providing and fixing pre-coated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer in- charge. The sheet shall be fixed using self-drilling /self-tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
Providing and fixing precoated galvanised steel sheet roofing accessories of total coated thickness 0.50mm (base metal of minimum 0.45mm thickness with total coating thickness of 0.05mm) with Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self-drilling/ self-tapping screws complete :ridges plain
Fixing post of iron or precast concrete by digging hole in the ground (in all sorts of soil) and embedding the same by packing the hole with cement concrete (1:3:6) (with jhama khoa. For Purulia, Bankura and Darjeeling Hill by Pakur Variety, Local Black Hard Stone & Bazree respectively) and finishing the top surface to regular shape (as directed) with 15 cm cement plaster (1:6) complete, including the cost of concrete plaster etc.but excluding the cost of the post : (i) Average dia. of the hole 200 mm. to 300 mm. (a) Depth 450 mm. to 500 mm [Cement 8 kg/No.]
Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised "C" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. (The rate is exclusive of the cost of posts) (III) 75 mm. x 75 mm. x 8 g.
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturer’s specifications: Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm.
SIB NARAYAN RAY (BID ID -3034331)
RINKU KHAN (BID ID -3032938)
JOY GURU CONSTRUCTION (BID ID -3035327)
ILIASH SHAIKH (BID ID -3033689)
M/S.M.S BUILDERS (BID ID -3035598)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .