Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAdmitted-Finance | ₹5.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 Cr+₹6.5 L (1.30%)Admitted-Finance | ₹5.1 Cr+₹6.5 L (1.30%) | L2 | Admitted-Finance |
| 3 | L3₹5.1 Cr+₹7.2 L (1.44%)Admitted-Finance | ₹5.1 Cr+₹7.2 L (1.44%) | L3 | Admitted-Finance |
| 4 | L4₹5.4 Cr+₹38.1 L (7.60%)Admitted-Finance T 10 3RD FLOOR CITY CENTRE PRESS COMPLEX PLOT NO 1 M P NAGAR ZONE I BHOPAL M P 462011 | BHOPAL | BHOPAL | MADHYA PRADESH | 462011 | ₹5.4 Cr+₹38.1 L (7.60%) | L4 | Admitted-Finance |
| 5 | L5₹5.5 Cr+₹47.5 L (9.49%)Admitted-Finance | ₹5.5 Cr+₹47.5 L (9.49%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TECHNOGEM CONSULTANTS PRIVATE LIMITED L12 | G-Eng Advisory Services Pvt. Ltd. L5 | TPF Engineering Pvt Ltd L9 | K and J Projects Pvt Ltd L15 | Theme Engineering Services Pvt Ltd L13 | Dhruv Consultancy Services Limited L7 | AICONS Engineering Pvt. Ltd. L10 | Voyants Solutions Private Limited L11 | Shrikhande Consultants Private Limited L14 | EDMAC Engineering Consultant India Private Limited L8 | Technocrats Advisory Services Pvt. Ltd. L6 | Planning & Infrastructural Development Consultants Pvt. Ltd. L1 | GLOBAL INFRA SOLUTIONS L2 | L N MALVIYA INFRA PROJECTS PVT LTD L4 | Jindals Consortium L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Key Personnel | ||||||||||||||||||
| 2.00 | Team Leader Cum Senior Highway Engineer | 18 | Month | 1,85,000 ₹33,30,000 | 2,00,000 ₹36,00,000 | 1,72,500 ₹31,05,000 | 1,56,000 ₹28,08,000 | 3,25,000 ₹58,50,000 | 1,50,000 ₹27,00,000 | 2,40,000 ₹43,20,000 | 2,00,000 ₹36,00,000 | 3,25,000 ₹58,50,000 | 2,20,000 ₹39,60,000 | 1,70,000 ₹30,60,000 | 1,80,000 ₹32,40,000 | 1,90,000 ₹34,20,000 | 1,40,000 ₹25,20,000 Lowest | 1,49,400 ₹26,89,200 |
| 3.00 | Resident cum Highway Engineer | 88 | Month | 1,75,000 ₹1,54,00,000 | 1,45,000 ₹1,27,60,000 | 1,70,000 ₹1,49,60,000 | 1,17,000 ₹1,02,96,000 | 1,60,000 ₹1,40,80,000 | 1,00,000 ₹88,00,000 Lowest | 1,75,000 ₹1,54,00,000 | 1,20,000 ₹1,05,60,000 | 1,75,000 ₹1,54,00,000 | 1,37,500 ₹1,21,00,000 | 1,50,000 ₹1,32,00,000 | 1,20,000 ₹1,05,60,000 | 1,60,000 ₹1,40,80,000 | 1,10,000 ₹96,80,000 | 1,17,000 ₹1,02,96,000 |
| 4.00 | Bridge/Structural Engineer( 2 Nos) | 46 | Month | 1,60,000 ₹73,60,000 | 1,20,000 ₹55,20,000 | 1,61,000 ₹74,06,000 | 1,17,000 ₹53,82,000 | 1,65,000 ₹75,90,000 | 86,000 ₹39,56,000 | 1,70,000 ₹78,20,000 | 1,40,000 ₹64,40,000 | 1,50,000 ₹69,00,000 | 1,40,250 ₹64,51,500 | 1,20,000 ₹55,20,000 | 1,40,000 ₹64,40,000 | 1,60,000 ₹73,60,000 | 1,50,000 ₹69,00,000 | 11,700 ₹5,38,200 Lowest |
| 5.00 | Senior Quantity Surveyor | 18 | Month | 1,55,000 ₹27,90,000 | 1,40,000 ₹25,20,000 | 1,20,000 ₹21,60,000 | 1,56,000 ₹28,08,000 | 1,60,000 ₹28,80,000 | 80,000 ₹14,40,000 Lowest | 1,60,000 ₹28,80,000 | 1,30,000 ₹23,40,000 | 1,80,000 ₹32,40,000 | 1,54,000 ₹27,72,000 | 1,10,000 ₹19,80,000 | 1,30,000 ₹23,40,000 | 1,40,000 ₹25,20,000 | 1,20,000 ₹21,60,000 | 1,19,700 ₹21,54,600 |
| 6.00 | Senior Quality cum Material Expert ( 2 Nos) | 36 | Month | 1,55,000 ₹55,80,000 | 1,70,000 ₹61,20,000 | 1,50,000 ₹54,00,000 | 1,20,900 ₹43,52,400 | 1,60,000 ₹57,60,000 | 75,050 ₹27,01,800 Lowest | 1,60,000 ₹57,60,000 | 1,30,000 ₹46,80,000 | 1,80,000 ₹64,80,000 | 1,45,750 ₹52,47,000 | 1,20,000 ₹43,20,000 | 1,35,000 ₹48,60,000 | 1,25,000 ₹45,00,000 | 1,20,000 ₹43,20,000 | 1,44,000 ₹51,84,000 |
| 7.00Sub Professional Staff | ||||||||||||||||||
| 8.00 | Survey Engineer(2 nos) | 36 | Month | 60,000 ₹21,60,000 | 45,000 ₹16,20,000 | 55,000 ₹19,80,000 | 48,000 ₹17,28,000 | 60,000 ₹21,60,000 | 50,000 ₹18,00,000 | 35,000 ₹12,60,000 Lowest | 65,000 ₹23,40,000 | 65,000 ₹23,40,000 | 41,400 ₹14,90,400 | 40,000 ₹14,40,000 | 43,000 ₹15,48,000 | 35,000 ₹12,60,000 Lowest | 45,000 ₹16,20,000 | 40,500 ₹14,58,000 |
| 9.00 | Assistant Highway cum Material Engineer (2 nos) | 106 | Month | 65,000 ₹68,90,000 | 30,000 ₹31,80,000 | 45,000 ₹47,70,000 | 1,08,000 ₹1,14,48,000 | 60,000 ₹63,60,000 | 45,000 ₹47,70,000 | 35,000 ₹37,10,000 | 65,000 ₹68,90,000 | 65,000 ₹68,90,000 | 41,400 ₹43,88,400 | 40,000 ₹42,40,000 | 40,000 ₹42,40,000 | 30,000 ₹31,80,000 | 26,000 ₹27,56,000 Lowest | 30,600 ₹32,43,600 |
| 10.00 | Assistant Bridge Engineer(2 nos) | 36 | Month | 60,000 ₹21,60,000 | 45,000 ₹16,20,000 | 45,000 ₹16,20,000 | 48,000 ₹17,28,000 | 65,000 ₹23,40,000 | 45,000 ₹16,20,000 | 35,000 ₹12,60,000 Lowest | 65,000 ₹23,40,000 | 80,000 ₹28,80,000 | 40,500 ₹14,58,000 | 40,000 ₹14,40,000 | 35,000 ₹12,60,000 Lowest | 40,000 ₹14,40,000 | 45,000 ₹16,20,000 | 40,500 ₹14,58,000 |
Tender Value
₹419.4 Cr
Closing Date
20 Sept 2021, 5:00 pmClosed
E.E.N.H. Div. Nagpur
E.E.N.H. Div. Bunglow No.39/1, Civil Lines, Nagpur
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF CONSTRUCTION OF 2 LANE PAVED SHOULDERS TIRORA GONDIA AND AMGAO GONDIA IN THE STATE OF MAHARASHTRA
2021_MoRTH_639044_1
NIT-04/2021-22
Open Tender
Consultancy
Item Rate
540 days
Gondia
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Pay online in Bharatkosh Portal
Exempted
Office of the Chief Engineer N.H. PW Navi Mumbai
7 Jan 2022
20 Jul 2021
21 Sept 2021
20 Jul 2021
20 Sept 2021
11 Aug 2021
20 Jul 2021 - 9 Aug 2021
9 Aug 2021
Amount
Key Personnel
Team Leader Cum Senior Highway Engineer
Resident cum Highway Engineer
Bridge/Structural Engineer( 2 Nos)
Senior Quantity Surveyor
Senior Quality cum Material Expert ( 2 Nos)
Sub Professional Staff
Survey Engineer(2 nos)
Assistant Highway cum Material Engineer (2 nos)
Assistant Bridge Engineer(2 nos)
Electrical cum utility services Engineer
Quantity Surveyor(2 nos)
Support Staff
Office Manager
Accountant cum Cashier
Steno cum Computer Operator
Office Boy ( 1 no)
Transportation (Fixed Costs) The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
Mahindra Bolero or Equivalent (Not more than 3 years old)
Innova or Equivalent (Not more than 3 years old)
Swift Dzire or Equivalent (Not more than 3 years old)
Duty Travel to Site (Fixed Costs)
Site to MORTH HQ
Site to Regional Office for Key professionals 20 round trips (By air economy class/train first AC/ Delux AC Bus)
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
Office Rent (Construction Period)
Office Rent (Maintanance Period)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Office Furniture and Equipment (Rental) (Brand new Furniture and Equipment shall be mandatory at the time of commencement of services as per the list given below. The rental rate per month shall be quoted for the total list of Office Furniture and Equipment)
For construction period The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
For Maintanance period The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone ,photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(2 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.) with internet, laser printers (1 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., binding machine (1 no.), plotter A0 size, overhead projector, AC (1 no., 1.5 Ton), Water Coolers (as required)etc.
Reports and Document Printing
Monthly Reports (Design and Construction)
Half yearly Reports
Various other reports as provided in the EPC Agreement such as Completion Report
Survey and Investigation A. Topographical Survey (Fixed Rate)
Survey Equipment (GPS/Total station /Auto Level) with semiskilled survey Party (4 persons) and one dedicated vehicle for Survey Party (inclusive of vehicle rental driver’s salary, fuel operation and maintenance etc complete) with rods, flags and other sundries
Contingency (A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval form the Competent Authority in RO Mumbai / MORTH.)
GLOBAL INFRA SOLUTIONS
Jindals Consortium
L N MALVIYA INFRA PROJECTS PVT LTD
G-Eng Advisory Services Pvt. Ltd.
Technocrats Advisory Services Pvt. Ltd.
Dhruv Consultancy Services Limited
EDMAC Engineering Consultant India Private Limited
TPF Engineering Pvt Ltd
AICONS Engineering Pvt. Ltd.
Voyants Solutions Private Limited
TECHNOGEM CONSULTANTS PRIVATE LIMITED
Theme Engineering Services Pvt Ltd
Shrikhande Consultants Private Limited
K and J Projects Pvt Ltd
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_672631.xls
BOQ Document • 0.29 MB
80526718.pdf
Tender Document • 0.54 MB
RFPandguidelines.rar
Tender Document • 3.84 MB
80526720.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .