| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.2 LAccepted-AOC | L1 | Accepted-AOC Qualified | |
| 2 | L2₹77.5 L+₹2.3 L (3.08%)Rejected-Finance | L2 | Rejected-Finance Not Qualified | |
| 3 | L3₹83.6 L+₹8.4 L (11.2%)Rejected-Finance | L3 | Rejected-Finance Not Qualified |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
27 Feb 2023, 2:00 pmClosed
SE
EDC TEHRI
Replacement of ACSR Weasel Conductor by AB Cable at village Maneri Gaon, Pala, Bhukki, Nateen, Thirang, Gairi Jokani, Didsari etc. of Bhatwari Block under EDD Uttarkashi.
2023_UPCL4_55220_1
59/EDCT/2022-23
Open Tender
Miscellaneous Services
Item Wise
90 days
TEHRI
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE ETD
₹1.5 L
Yes
27 Jul 2023
20 Feb 2023
28 Feb 2023
20 Feb 2023
27 Feb 2023
20 Feb 2023
Cartage of following material from store centre uttarkashi to near road site of work by Pvt truck with loading & unloading Avg. Dist. 45 km
ST Pole SP-21
Line material
Head load cartage of the following stock material from road side to work site avg distance. 1 to 3 Km.
ST Pole SP-21
Line material
Dismantling of Following L.T line after roll of Conducter
L.T Line 3 Phase 4 wire
L.T Line 2 Phase 3 wire
L.T Line 1 Phase 2 wire
Dismantling of Following L.T line after roll of Conducter
LT Pole
Excavation of earth for pole pit of size 0.9x0.6x1.6 of full length of pole erection of pole in aal type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
ST Pole SP-21
Erection of single support pole in proper level and aligement alongwith fixing of all accessories
LT Pole SP-21
Grouting of Pole in size .45x.45x1.9 of the support in CC ratio 1:4:8 block including cost of Cement ,Sand and stone ballast back filling of soil and boulder in pit and ramming and proper aligement leveling as per respo construction manual
ST Pole SP-21
Excavation of earth for stay pit of size 0.6x0.6x1.2 of full length of pole erection of pole in aal type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
Fixing ,tighting and nozzaling of stay with pole and stay rod on required tention as per drawing
Stay set LT
Grouting of stay in size .6x.6x.3 of the support in CC ratio 1:4:8 block including cost of Cement ,Sand and stone ballast back filling of soil and boulder in pit and ramming and proper aligement leveling as per respo construction manual
Straingthing of telted LT Pole with refitting of Stay
Laying , Spreading & sagging of L.T AB cable & making L.T Line with complete binding and Jumpring
LT XLPE AB Cable 3CX70+50 MM2
LT XLPE AB Cable 3CX35+25 MM2
LT XLPE AB Cable 3CX25+25 MM2
Earthing of Pole with Earth Rod
Laying and fixing of 1x25 mm2 XLPE Cable for Distribution Box
Fixing of Distribution Box with cannection Complete
Discannection & Recannection of Consumer Cable
Route clearance of tree branches coming near L.T Line
Back head load cartage of Scrap material from work side to Road side
Back cartage of Scrap material from Road side to Rishikesh 180 km
Providing and fixing of following De-certralized material for the completion of the above Works.
Dead End Clamp with Eye - Hook and N&B insulated SP-23/ SP-21/ SP-10
Suspension Clamp with Eye-Hook and N&B insulated SP-23/SP-21/SP-10
Piercing Connector 70 Sq.mm - 70 Sq.mm.
Piercing Connector 70 Sq.mm - 35 Sq.mm.
Piercing Connector 70 Sq.mm - 25 Sq.mm.
Piercing Connector 35 Sq.mm - 35 Sq.mm.
Piercing Connector 35 Sq.mm - 25 Sq.mm.
PG Clamp for Neutral 70-25 mm2
PG Clamp for Neutral 50-25 mm2
PG Clamp for Neutral 35-25 mm2
PG Clamp for Neutral 25-25 mm2
PG Clamp for Neutral 35-35 mm2 /70-70 mm2
1 x 25 Sq.mm.XLPE Cable.
Stay Clamp with N&B SP-21
LT XLPE AB Cable 3CX70+50 MM2
LT XLPE AB Cable 3CX35+25 MM2
LT XLPE AB Cable 3CX25+25 MM2
AL Lugs for Distribution Box connection 95 mm2/70mm2/35mm2 for T/F
AL Lugs for Distribution Box connection 25 mm2
LT Distribution Box Clamp
L.T Distribution three Phase Box
M/s SOBAT SINGH GUSAIN
GRAMIN VIKASH TAKNIKI SANSTHAN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .