Tender Value
₹68.9 L
EMD Value
₹1.4 L
Closing Date
6 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
TRD
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Design, supply, erection, testing & commissioning of new construction or modification/replacement/augmentation of existing installations of (1) 50 Hz single phase 25kV AC OHE system or 25kV AT feeding system (2x25kV) OR (2) 66kV and above rating transmission lines including erection of transmission towers and foundation work of 66kV or above voltage level in Railway/state electricity Board/Power Grid Corporation/DISCOMs/NHPC or any other PSU/Govt organization.
15 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All the bidder/Tenderers should ensure that they are GST compliant
Guntakal Division - Modification works to OHE in connection with (i) Proposed Construction Of 6 lane RUB with (2x15m) at Bharathi cements siding executed by NHAI in connection with expansion of NH 544 G (HX-SBC) (Km: Ch:122.131) (ii) Proposed construction of new six lane ROB at Rly Km:47/255 between Mudiguba - Kalasumadram stations on DMM-PAK section (iii) Proposed construction of two-lane ROB in lieu LC: 161 at railway km.304/2-3 (UP) between Rangapuram & Bethamcherla stations on Guntakal-Nadyal section (iv) Proposed Construction Of 6 Lane Road Over Bridge (Rob) At Railway Km: 294+144.5 Between Yerraguntla Junction - Yerragudipadu Station On GY-RU Section (v) Two lane ROB in lieu of level crossing No. 119 at Railway Km.188/1-2 between Pileru - Pulicherla stations on Dharmavaram-Pakala section (vi) Proposed construction of two-lane ROB at rly km 35/8-9 of span(1X20+1X46.00+1X20) c/c of pier steel composite girder in lieu of LC -26 between Mudigubba-Kalasamudram stations on DMM-PAK section.
GTL-TRD-29-eTN-61-2026-27~SCOR
GTL-TRD-29-eTN-61-2026-27
Open
Works - General
12 Months
Anantapur, Andhra Pradesh
₹0
₹1.4 L
15 Sept 2026
15 Sept 2026
22 Sept 2026
108 items across 6 schedules · ₹68,93,150.15 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supply & Erection | Per Track KM | 12.00 | 20,066 | 2,40,792 |
| 2 | Erection/ Labour | MT | 11.00 | 3,465 | 38,115 |
| 3 | 32/3(a)-Extra Rate for Erection Under Power Block | MT | 7.00 | 3,465 | 24,255 |
| 4 | Erection/ Labour | MT | 1.10 | 15,267 | 16,793.7 |
| 5 | 32/3(b)-Extra Rate for Erection Under Power Block | MT | 0.75 | 15,267 | 11,450.25 |
| 6 | Supply/Material | Each | 8.00 | 9,331 | 74,648 |
| 7 | Erection/ Labour | Each | 8.00 | 1,120 | 8,960 |
| 8 | 32/3(e)-Extra Rate for Erection Under Power Block | Each | 8.00 | 1,120 | 8,960 |
| 9 | Supply/Material | Each | 27.00 | 12,114 | 3,27,078 |
| 10 | Erection/ Labour | Each | 21.00 | 1,080 | 22,680 |
| 11 | 32/4(a)(i)-Extra Rate for Erection Under Power Block | Each | 21.00 | 1,080 | 22,680 |
| 12 | Erection/ Labour | Each | 3.00 | 1,619 | 4,857 |
| 13 | 32/4(a)(ii)-Extra Rate for Erection Under Power Block | Each | 3.00 | 1,619 | 4,857 |
| 14 | Erection/ Labour | Metre | 100.00 | 207 | 20,700 |
| 15 | 32/7(c)-Extra Rate for Erection Under Power Block | Metre | 100.00 | 207 | 20,700 |
| 16 | Supply/Material | Each | 2.00 | 21,221 | 42,442 |
| 17 | Erection/ Labour | Each | 2.00 | 4,000 | 8,000 |
| 18 | 32/8(a)(v)-Extra Rate for Erection Under Power Block | Each | 2.00 | 4,000 | 8,000 |
| 19 | Erection/ Labour | Each | 2.00 | 185 | 370 |
| 20 | Supply/Material | Each | 2.00 | 8,201 | 16,402 |
| 21 | Erection/ Labour | Each | 2.00 | 1,120 | 2,240 |
| 22 | 32/8(b)(ii)-Extra Rate for Erection Under Power Block | Each | 2.00 | 1,120 | 2,240 |
| 23 | Supply/Material | Each | 1.00 | 5,192 | 5,192 |
| 24 | Erection/ Labour | Each | 1.00 | 1,000 | 1,000 |
| 25 | 32/8(b)(iii)-Extra Rate for Erection Under Power Block | Each | 1.00 | 1,000 | 1,000 |
| 26 | Supply/Material | Each | 3.00 | 22,000 | 66,000 |
| 27 | Erection/ Labour | Each | 3.00 | 3,372 | 10,116 |
| 28 | 32/9(a)-Extra Rate for Erection Under Power Block | Each | 3.00 | 3,372 | 10,116 |
| 29 | Supply/Material | Each | 2.00 | 1,859 | 3,718 |
| 30 | Erection/ Labour | Each | 2.00 | 711 | 1,422 |
| 31 | 32/11(a)(i)-Extra Rate for Erection Under Power Block | Each | 2.00 | 711 | 1,422 |
| 32 | Supply/Material | Each | 11.00 | 756 | 8,316 |
| 33 | Erection/ Labour | Each | 11.00 | 356 | 3,916 |
| 34 | 32/15(a)-Extra Rate for Erection Under Power Block | Each | 11.00 | 356 | 3,916 |
| 35 | Supply/Material | Each | 2.00 | 2,126 | 4,252 |
| 36 | Erection/ Labour | Each | 2.00 | 680 | 1,360 |
| 37 | 32/15(b)-Extra Rate for Erection Under Power Block | Each | 2.00 | 680 | 1,360 |
| 38 | Supply/Material | Each | 2.00 | 3,654 | 7,308 |
| 39 | Erection/ Labour | Each | 2.00 | 342 | 684 |
| 40 | 32/15(e)-Extra Rate for Erection Under Power Block | Each | 2.00 | 342 | 684 |
| 41 | Supply/Material | Each | 39.00 | 833 | 32,487 |
| 42 | Erection/ Labour | Each | 39.00 | 304 | 11,856 |
| 43 | Supply/Material | Each | 27.00 | 604 | 16,308 |
| 44 | Erection/ Labour | Each | 27.00 | 274 | 7,398 |
| 45 | Supply/Material | Each | 34.00 | 951 | 32,334 |
| 46 | Erection/ Labour | Each | 34.00 | 326 | 11,084 |
| 47 | Erection/ Labour | Each | 161.00 | 107 | 17,227 |
| 48 | Supply/Material | Each | 20.00 | 3,511 | 70,220 |
| 49 | Erection/ Labour | Each | 20.00 | 1,347 | 26,940 |
| 50 | Supply/Material | Metre | 500.00 | 183 | 91,500 |
| 51 | Erection/ Labour | Metre | 500.00 | 80 | 40,000 |
| 52 | Erection/Labour | Each | 26.00 | 1,870 | 48,620 |
| 53 | 32/31(a)-Extra Rate for Erection Under Power Block | Each | 26.00 | 1,870 | 48,620 |
| 54 | Erection/Labour | Each | 1.00 | 2,316 | 2,316 |
| 55 | 32/31(b)-Extra Rate for Erection Under Power Block | Each | 1.00 | 2,316 | 2,316 |
| 56 | Erection/Labour | Set | 1.00 | 2,558 | 2,558 |
| 57 | 32/31(e)-Extra Rate for Erection Under Power Block | Set | 1.00 | 2,558 | 2,558 |
| 58 | Erection/Labour | Each Span | 42.00 | 2,286 | 96,012 |
| 59 | 32/31(g)-Extra Rate for Erection Under Power Block | Each Span | 42.00 | 2,286 | 96,012 |
| 60 | Erection/Labour | Each | 21.00 | 3,062 | 64,302 |
| 61 | 32/31(k)(i)-Extra Rate for Erection Under Power Block | Each | 21.00 | 3,062 | 64,302 |
| 62 | Erection/Labour | Each | 6.00 | 11,520 | 69,120 |
| 63 | 32/31(l)(i)-Extra Rate for Erection Under Power Block | Each | 6.00 | 11,520 | 69,120 |
| 64 | Erection/Labour | Each | 7.00 | 524 | 3,668 |
| 65 | 32/31(n)-Extra Rate for Erection Under Power Block | Each | 7.00 | 524 | 3,668 |
| 66 | Erection/Labour | Each | 1.00 | 2,986 | 2,986 |
| 67 | 32/31(q)-Extra Rate for Erection Under Power Block | Each | 1.00 | 2,986 | 2,986 |
| 68 | Erection/Labour | MT | 2.70 | 709 | 1,914.3 |
| 69 | 32/31(s)-Extra Rate for Erection Under Power Block | MT | 2.70 | 709 | 1,914.3 |
| 70 | Erection/Labour | Each | 2.00 | 2,542 | 5,084 |
| 71 | 32/31(t)(i)-Extra Rate for Erection Under Power Block | Each | 2.00 | 2,542 | 5,084 |
| 72 | Erection/Labour | Each | 3.00 | 1,480 | 4,440 |
| 73 | 32/31(t)(iii)-Extra Rate for Erection Under Power Block | Each | 3.00 | 1,480 | 4,440 |
| 74 | Erection/Labour | Each | 13.00 | 140 | 1,820 |
| 75 | 32/31(t)(iv)-Extra Rate for Erection Under Power Block | Each | 13.00 | 140 | 1,820 |
| 76 | Erection/Labour | Each | 1.00 | 506 | 506 |
| 77 | 32/31(t)(vi)-Extra Rate for Erection Under Power Block | Each | 1.00 | 506 | 506 |
| 78 | Erection/Labour | Each | 1.00 | 2,411 | 2,411 |
| 79 | 32/31(t)(viii)-Extra Rate for Erection Under Power Block | Each | 1.00 | 2,411 | 2,411 |
| 80 | Erection/Labour | Each Span | 50.00 | 4,376 | 2,18,800 |
| 81 | 32/31(t)(ix)-Extra Rate for Erection Under Power Block | Each Span | 50.00 | 4,376 | 2,18,800 |
| 82 | Erection/Labour | Each | 81.00 | 145 | 11,745 |
| 83 | Erection/Labour | MT | 9.00 | 140 | 1,260 |
| 84 | Erection/Labour | MT | 9.00 | 240 | 2,160 |
| 85 | Transportation/Labour | MT-Km | 70.00 | 116 | 8,120 |
| 86 | Supply/Material | Each | 24.00 | 516 | 12,384 |
| 87 | Erection/Labour | Each | 24.00 | 100 | 2,400 |
| 88 | Supply & Erection | Set | 6.00 | 26,100 | 1,56,600 |
| 89 | Supply/Material | Each | 4.00 | 1,049 | 4,196 |
| 90 | Erection/Labour | Each | 4.00 | 149 | 596 |
| Schedule total | ₹26,64,931.55 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
61-2026-27TenderMasterdocument.pdf
ATTACHMENT
Standard General Conditions of cont
ATTACHMENT
61-2026-27ExplanatoryNotes.pdf
ATTACHMENT
GCCCorrectionSlips__compressed.pdf
ATTACHMENT
61-2026-27StandardGeneralConditionsofcontract.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .