Tender Value
₹3.7 L
EMD Value
₹7,432
Closing Date
26 Jul 2022, 3:00 pmClosed
Asst. General Manager (Engg-E)
AAI, Silchar Airport
ARMO of Electrical Works at Silchar Airport. SH- Special repair of 750KVA Indoor type distribution transformer at Silchar Airport
2022_AAI_121372_1
AAI/SIL/ENGG-E/TRANS/2022-23
Open Tender
Repair and Maintenance Services
Works
90 days
AAI, Silchar Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹7,432
18 Oct 2022
6 Jul 2022
27 Jul 2022
6 Jul 2022
26 Jul 2022
6 Jul 2022
6 Jul 2022 - 9 Jul 2022
Amount
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (a) Complete repairing of the above mentioned 750 KVA Distribution Transformer and dismantling, core, coil assembly & reassembling of core coil, testing etc complete as required.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (b) Complete DPC insulation varnishing (RYB) of HV leg coils complete as required.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (c) Supply and filling with fresh transformer oil of standard quantity as per IS including core, coil & tank washing.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (d) Supply and Fixing of MS Nuts & Volts.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (e) Supply and Fixing of Insulation materials
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (f) Supply and provision of Silica gel breather with fresh silica gel.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (g) Supply and Fixing of Gasket Set (rubberized cork) 8 mm
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (h) Painting of above mentioned Transformer body with powder coating in approved shade complete as required.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (i) Loading, Unloading & Transportation of the above mentioned transformer from site to workshop and back after repair complete as required.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (j) Complete installation, testing & commissioning of the repaired transformer by deploying suitable Engineer / Technician & submission of all required test report complete as required.
Complete repair and overhauling, reinstallation, testing & commissioning of Kirloskar Make 750 KVA transformer Indoor type, ONAN Core type, transformer with copper winding, of ratings 750 KVA, 11KV/433 Volts, with off-LOAD tap change -7.5% to +7.5% in step of 2.5%, 3-PH, 50Hz, vector group of Dyn 11 with OTI (with Alarm & Trip Contacts), WTI (with Alarm & Trip Contacts) which has percent impedance not more than 5%, bucholz relay and replacement of all defective accessories with necessary spare parts. The transformer is to be repositioned and recommissioned in substation with all HT/LT cable termination complete as required i/c following works. (k) Less rebate for old transformer oil
GEETA ENGINEERING
KANIKA ELECTRICAL WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .