Tender Value
₹80.8 Cr
EMD Value
₹80.8 L
Closing Date
19 Nov 2026, 5:00 pm
General Manager, OSAM Board
O/o Odisha State Agricultural Marketing Board
Construction of 12 Nos 5000MT and 6Nos. 2500MT Godowns With ancillary works at BARAGODA
2026_OSAMB_142650_1
03/OSAMB/2026-27
Open Tender
Civil Works - Others
Percentage
540 days
Bargarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹80.8 L
OSAM Board Conference Hall
6 Oct 2026
6 Oct 2026
20 Nov 2026
6 Oct 2026
19 Nov 2026
6 Oct 2026
6 Oct 2026 - 19 Nov 2026
23 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kind of soil including moorum, stoney earth & earth mixed with boulders except sheet rock and bulders requiring blasting, hard soil, gravelly soil/sandy soil or slushy soil at all lead & lift including dressing of sides and levelling the bed upto the required depth and depositing the surplus excaved materials away from the work site as directed including shoring, shuttering and dewatering (if required) with cost of labour, cess, hire & running charges of water pumps, sundries, T&P and all other machineries required for the work etc complete in all respect as per direction of the Engineer in charge. | 25,102.18 | Cum | 282.9 | ₹71,01,406.72 |
| - | Earth work in all kinds of soil at all leads & lift including moorum, stoney earth & earth mixed with boulders except sheet rock and bulders requiring blasting, hard soil, gravelly soil/sandy soil or slushy soil and depositing the surplus excaved materials away from the work site as directed with cost of labour, cess, hire & running charges of water pumps, sundries, T&P and all other machineries required for the work etc complete in all respect as per direction of the Engineer in charge. | 388.5 | Cum | 210.5 | ₹81,779.25 |
| - | Filling in foundation, trenches and plinth with river sand of approved quality well watered and compacted in layers in foundation, trenches & plinth of foundation areas & foundation surrounding areas ,veranda and under the floor in layers of 0.30m with top surface dressed and levelled to proper gradient including cost of all materials, conveyance, all taxes and royalities, loading and unloading including cost of all labour, sundries, T&P etc complete but excluding GST as per direction of the Engineer in charge. | 60,989.33 | Cum | 604.3 | ₹3,68,55,852.12 |
| - | Providing & laying of cement concrete of grade (1:3:6) (1 cement, 3 sand, 6 Hard granite stone crusher broken aggregates of size 40 mm and down) mixing in concrete mixer, lowering and compacting in proper thickness for foundation, below walls, column footing, raft, roads, septic tank at any depth, plinth protection and under the floor etc. including curing for the required period, cost of all materials, conveyance, loading, unloading, labour, sundries, T&P, taxes, cess, royalties etc. complete but excluding GST as per direction of the Engineer -in-charge. | 14,228.22 | Cum | 6,161.1 | ₹8,76,61,486.24 |
| - | Providing, supplying and constructing brick masonry in cement mortar 1:6 (1cement : 6 sand) with 1st quality approved fly ash bricks having minimum crushing strength 75 kg/ sqcm including immersing the bricks before use, splays cutting,circular moulding, corbelling etc in foundation at all levels below and avove highest plinth level upto the height as specified with all necessary scaffolding, raking out the joints, including cost of all materials, conveyance, curing, loading, unloading, labour, sundries, T&P, taxes, duties, levies, octori, cess, royalties etc complete but excluding GST as per direction of Engineer -in-charge.
Foundation and Plinth | 3,506.04 | Cum | 5,304.6 | ₹1,85,98,155.7 |
| - | Super sturucture Up to 3mt ht | 6,401.14 | Cum | 5,337.9 | ₹3,41,68,639.87 |
| - | Above 3m ht | 5,096.95 | Cum | 5,723.9 | ₹2,91,74,443.55 |
| - | Providing, supplying & laying in position machine batched , machine mixed and machine vibrated cement concrete for reinforced cement concrete M25 (specified compressive strength expressed in 25 N/sqmm at 28 days as per IS 456-2000(Latest)) of any thickness using crusher broken Hard granite stone aggregates of size 20 mm and down excluding cost of reinforcement but including admixture in recommended proportions to accelerete and retard setting of concrete, improve workability without impairing strength and durability for foundation, columns, beam, slab, precast slab, raft, floor, plinth beam, window sills, coping, walls, parapet, drops, fins, chajjas, septic tank, road, pavement etc. at different levels in any shape with necessary lift & delift, lead, finishing concrete surface including cost of all materials, cost of centering and shuttering, cost of curing, conveyance, loading, unloading, labour, sundries, T&P, taxes, duties, levies, octori, cess, royalties etc. complete but excluding GST as per the direction of Engineer -in-charge . The quated rate includes the cost of carrying out design mix in an engineering college as aproved by the employer .The cost of the materials required for design mix including all incidential shall be borne by the contractor . The design mix so obtained from the engineering college shal be aproved by the employer before it used in the work .
Column base (Footing and Pedestals and column below the plinth ) | 2,582.81 | Cum | 6,645.5 | ₹1,71,64,063.86 |
| - | Plinth Beam /Tie Beam /Grade Bea /Compound Wall Top | 3,706.91 | Cum | 7,520.5 | ₹2,78,77,816.65 |
| - | Column and Beam Up to 5mt ht | 1,461.72 | Cum | 16,032.9 | ₹2,34,35,610.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
DTCNB.pdf
Tender Documents • 2.26 MB
BOQ_612411.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .