Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13,175.49Admitted-Finance | -32.11% | ₹13,175.49 | L1 | Admitted-Finance |
| 2 | L2₹14,549.51+₹1,374.02 (10.4%)Admitted-Finance | -25.03% | ₹14,549.51+₹1,374.02 (10.4%) | L2 | Admitted-Finance |
| 3 | L3₹14,807.63+₹1,632.14 (12.4%)Admitted-Finance | -23.70% | ₹14,807.63+₹1,632.14 (12.4%) | L3 | Admitted-Finance |
| 4 | L4₹15,137.55+₹1,962.06 (14.9%)Admitted-Finance | -22.00% | ₹15,137.55+₹1,962.06 (14.9%) | L4 | Admitted-Finance |
| 5 | L5₹15,816.80+₹2,641.31 (20.0%)Admitted-Finance | -18.50% | ₹15,816.80+₹2,641.31 (20.0%) | L5 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
1 Jun 2026, 6:00 pmClosed
XEN CMD SVP
kangan
Repair Restoration of damaged Parapets at various spot along the canal at Sumbal.
2026_SPDC_309647_5
CMD SVP K 01 of 2026
Open Tender
Civil Works
Percentage
45 days
SUMBAL
Please refer Tender documents.
4 documents required · 4 mandatory
₹520
CPAO USHP II
₹20,000
Divisional office
4 Jun 2026
9 May 2026
3 Jun 2026
10 May 2026
1 Jun 2026
10 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | 1,725.2 | - |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | Cum | 592.9 | - |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | 286.35 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 6,591.25 | - |
| 5 | Providing and laying soling Stone Including carraige complete as per direction of engineer in charge. | - | Cum | 1,000 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kgs | 123.2 | - |
| 7 | Provision for temporary foot Bridge across canal | - | No | 8,000 | - |
| 8 | Cement avg. lead 5km | - | Mt | 178.43 | - |
| 9 | Aggregate avg lead 10km | - | Cum | 279.04 | - |
| 10 | sand avg lead 40km | - | Cum | 630.74 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.58 MB
BOQ_1002285.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .