| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | ₹12.6 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹12.6 L+₹294.09 (0.02%)Rejected-AOC GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | ₹12.6 L+₹294.09 (0.02%) | L2 | Rejected-AOC NOT LOWEST |
| 3 | L3₹12.6 L+₹325.97 (0.03%)Rejected-AOC NEAR TELEPHONE EXCHANGE TALLI BAZAR KAPKOTE BAZAR BAGESHWAR DISTRICT BAGESHWAR KAPKOTE BAGESHWAR PIN 263632 | BAGESHWAR | UTTARAKHAND | 263632 | ₹12.6 L+₹325.97 (0.03%) | L3 | Rejected-AOC NOT LOWEST |
Tender Value
₹12.6 L
EMD Value
₹45,000
Closing Date
27 Feb 2024, 3:00 pmClosed
EXECUTIVE ENGINEER
E.D.D. BAGESHWAR
CONSTRUCTION OF LT , 11KV LINE AND INSTALLATION OF DT FOR THE ELECTRIFICATION OF SHIKHAR BHANAR UNDRE KAPKOTE SECTION UNDER DEPOSIT HEAD
2024_UPCL9_69230_1
34/2023-24
Open Tender
Electrical Works
Item Rate
90 days
BAGESHWAR
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
EXECUTIVE ENGINEER
₹45,000
22 Mar 2025
9 Feb 2024
28 Feb 2024
9 Feb 2024
27 Feb 2024
9 Feb 2024
Amount
DE-CENTRALIZED MATERIAL :-
E-CLAMP FOR 11 KV
HOLDING CLAMP FOR FUSE SET/TPMO SP-23,N&B
STAY CLAMP FOR SP-23 SINGLE END
STAY CLAMP FOR SP-23 DOUBLE END
HOLDING CLAMP FOR SP-23 WITHOUT N&B
LT CLAMP WITH N&B ST POLE SP-10
EARTH WIRE CLAMP FOR SP-10 WITH N&B
STAY CLAMP FOR SP-10 WITH N&B
EARTH WIRE CLAMP FOR SP-23 WITH N&B
PG CLAMP RABBIT TO RABBIT
SHACKLE INSULATOR 100X115 MM WITH N&B
STAY INSULATOR 65X90 MM
LT SPACER SINGLE PHASE THREE WIRE
BRACING CLAMP TOP FOR SP-23 WITH N&B
BRACING CLAMP BOTTOM FOR SP-23 WITH N&B
11KV FUSE SET
MS CLAMP WITH N&B FOR SUSPENSION CLAMP
AL. CRIMPING TYPE LUGS 70 SQMM.
LABOUR :-
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
PAINTING OF SP-10 POLE
PAINTING OF SP-23 POLE
LAYING OF PVC CABLES (UPTO 150 SQMM)
INSTALLATION OF 16 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF FUSE SET
FIXING OF LIGHTNING ARRESTOR
LAYING OF RABBIT CONDUTOR IN HT LINE
LAYING OF 1P 2W LT LINE (WEASEL)
LOPPING & CHOPPING OF TREE BRANCHES
INSTALLATION OF DANGER BOARD/NUMBER PLATE
CARTAGE OF SP-10 POLE, 150-200 KM.
CARTAGE OF SP-23 POLE, 150-200 KM.
CARTAGE OF PETTY MATERIAL , 150-200 KM.
CARTAGE OF 16/25 KVA DTR, 150-200 KM.
HEAD LOAD CARTAGE OF SP-10 POLE (1-3 KM)
HEAD LOAD CARTAGE OF SP-23 POLE (1-3 KM)
HEAD LOAD CARTAGE OF MATERIAL (1-3 KM)
HEAD LOAD CARTAGE OF 16 KVA DTR (1-3 KM)
maa bhagwati electricals
G P ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .