Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 00 ARJUN NAGAR COLONY GOLA LAKHIMPUR ROAD GOLA KHERI UTTAR PRADESH 262802 | KHERI | UTTAR PRADESH | 262802 | Admitted-Finance |
| 2 | Admitted-Finance NEAR GURU NANAK I C RAJGARH PUNJABY COLONY GATE KHERI UTTAR PRADESH 262701 | KHERI | UTTAR PRADESH | 262701 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical NORMS INCOMPLETED |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
28 Dec 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC GOLA
HYDEL COLONY GOLA
109/EDCG/2024-25
2024_MVVNL_985755_1
109/EDCG/2024-25
Open Tender
Miscellaneous Works
Item Wise
EDC GOLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC GOLA KHERI
₹10,000
Yes
21 Jan 2025
21 Dec 2024
28 Dec 2024
23 Dec 2024
28 Dec 2024
23 Dec 2024
Amount
Loading Carriage & unloading of following materials from centre store to work site and its stacking Distance approx (0-100) Kms
a) Line Material
b) PCC Pole
c) STP pole 11 Mtr. Long
d) T/F16/25/63 KVA
e) ACSR Rabit/dog/Racoon/weasel/conductor
f) ABC (3x120/95/70/25/16) Sqmm
g) 11KV XLPE cable (3x35/70/120/185/240)
h) 11 KV pilfer resistant matrial cubical
i) 11KV pole mounted CT/PT
j) DP Box 3 phase
Fabrication, erection of sub-station type double pole on 8.5 Mtr long PCC/11Mtr Long ST pole along with fixing of necessary hardware of double pole along with necessary pin insulator as per RESPO specification and direction of E/I
Dragging of ST/PCC pole to pit site digging of pit erection and grouting (as per RESPO norms) of 11KV pin/Disc insulator guarding angle (1.8 mm 65x65x6) with nut & bolt its ramming as per RESPO specificaTION.
Fabrication, erection, T-Off pole single section pole along with T-Off channel clamp disc fitting & pin accessories, grounting in 1:4:8 cement sand and brick ballast as per RESPO specifiation
Grouting of pole with bricks ballas and sand and cement ratio 1:4:8
Providing nut bolts washers of sizes
Ordinary earthing by MS earth Rod 2500mm long as per RESPO schedule. Only GI wire & earth rod shall be supplied by the department
Fabrication erectgion Toff pole single section pole alongwith T Off Channel,clamp ,disk fitting and pin accessories
Grouting and Nuzzling of stay set complete including its grouting by civil material (sand brick ballast cement ) only stay wire shall be supplied by the department
Laying and sagging of 3 phase 3 wire 11KV line on ACSR wease/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I
Providing and fixing of guarding angle on existing 11KV support with clamp and nut bolts
Cradle guarding if HT line by GI wire shall be supplied by the department
Erection & commisioning of (3x120/95/70/25/16Sq.mm)
Laying of cable 11KV XLPE cable (3x35/70/120/185/240) sqmm in pakka road by boring method laying cable as per RESPO specification & direction of E/I
Laying of cable 11KV through piping
Hoisting of 11KV XLPE cable will be passed through MS pipe of required size duly clamped with pole at the bottom middle and top of the pole
Supply and Fixing of 11KV cable joining kit O/D and I/D
Installation of 11 KV CT/PT on double polle connect with metering unit along with providing and fixing of all accessories such as S/S base, MS flat, clamps nut and bolts jumpering and commisioning
Construction of brick masonry plinth suitable for installation of 11KV pilfer metering cubical along with plastering.
Dragging of 11KV pilfer metering cubical inside the metering room, its installation and commisioning.
Fixing of 3 phase distribution box/ kiosk on the LT poles including all clamps and meterial required for mounting connections and sealing.
High Pressure testing of 11 KV(3x35/70/12/185/240)XLPE along with arrangement of high pressure equipment.
Providing of Holding Clamp for TOP dropper T/F
Providing of Holding Clamp for PCC/STP Poles
Providing of F clamp for PCC /STP Poles
Drigging cutting and maing of hole
Cutting and chopping of tree branches for clearence of HT/LT line after clearance line throughout pieces of tree branches of site as and when required for completion of work.
Safe installation & Energisation of 16/25/63 KVA T/F on double pole by providing and fixing of L piece lugs making HT/LT connection and its commisioning only transformer shall be supplied by the deparment.
Safe installation & Energisation of 100/250/400/630 KVA T/F on double pole by providing and fixing of L piece lugs making HT/LT connection and its commisioning only transformer shall be supplied by the deparment.
FIXING OF WELL TYPE EARTHING 01 NO NUTRAL BODY AND 01 NO BODY
MAKING OF PLINTH.
MAKING OF FENCING FOR TRANSFORMER.
GST Extra
M/s Mishra Traders (BID ID -4818749)
M/S JAISWAL INTERPRISES (BID ID -4819022)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .