Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
28 Sept 2026, 7:00 pmDue tomorrow
EXECUTIVE ENGINEER , PUBLIC HEALTH WORKS DIVISION, NAKHATRANA
Providing, Supplying, Lowering, Laying & Jointing of PVC Pipeline & Construction of Pump Cabin at Various Site, Ta.- Nakhatrana, Dist.- Kachchh (Under Varamseda Complex RWSS M & R – 2026 - 27)
343644
07/2026-27
Open
Civil Works - Water Works
Works
Kutch
4 documents required · 4 mandatory
₹900
The Executive Engineer, Public Health Works Division, Nakhatrana
₹6,000
9 Sept 2026
9 Sept 2026
9 Sept 2026
28 Sept 2026
9 Sept 2026
Name Of Work: Providing , Supplying , Lowering,Laying And Jointing Connecting PVC Pipeline of New TW to SHW Sump and Existing Pipeline at Various
Location, Construction of Pump House Near Various Propsed TW, Ta. Nakhatrana (Under M & R Programme- 2026-27)
Taluka : Nakhatrana Dist. : Kachchh.
:::: SCHEDULE - B ::::: ( 3 Month)
Schedule Showing the Approximate Itemwise Quantites of Work to be Carried out Under this Contract.
Cost Put to the Tender RS.
Qty Unit Description of item Tender Rate Rate in Figure Per Amount
A) Providing , Supplying , Lowering,Laying And Jointing Connecting PVC Pipeline of New TW to SHW Sump and Existing Pipeline at Various
Location of Nakhatrana Taluka.
Providing and supplying in standard length ISI mark rigid unplasticised PVC
pipes suitable far potable water with ting fit joint including cost of rings, as
per IS specification no. 4985/1988 including all local and ceniral taxes,
transportation, freight charges, octroi, inspection charges, loading, unloading,
conveyance to the departmental stores and including cost of jointing meterial
1.Qne coupler / ring shall be provided with each full length pipe cost of which
is included in rates below.
2. 3% (Three) Discounted rate to be consider for Coupler jointed pipe
3. Rate for PVC Resin as Rs. 91739/MT (Price Without GST)
Kurbai Proposed TW to Existing Pipeline
950.00 Rmt 90 mm pvc pipe 6kg/cm2 139.00 Rupees One Hundred Thirty Nine only Rmt
Mosuna Proposed TW to Mosuna Sump
400.00 Rmt 90 mm pvc pipe 6kg/cm2 139.00 Rupees One Hundred Thirty Nine only Rmt
Rampar Roha Proposed TW to Mosuna Sump
450.00 Rmt 90 mm pvc pipe 6kg/cm2 139.00 Rupees One Hundred Thirty Nine only Rmt
(GWSSB SOR- 2022-23 item no 3.1.B.4, page no 07)
Qty Unit Description of item Tender Rate Rate in Figure Per Amount
Excavation for pipe line trenches for water supply, sewerage line, manhole etc.
all with shoring and struting if required as per required gradient and line
including safety provisions using site rails and stacking excavated stuff
including up to all required lead cleaning the site etc. complete for all lifts and
strata as specified.
453.60 Cum a)In all sorts of soil and soft murrum.(40%) 89.00 Rupees Eighty Nine only Cum
453.60 Cum b) In hard murrum, boulders incl. macadam road.(40%) 135.00 Rupees One Hundred Thirty Five only Cum
226.80 Cum c) In soft rock and/or masonry in CM or L M or Lime Concrete.(20%) 163.00 Rupees One Hundred Sixty Three only Cum
(GWSSB SOR 2022-23 item no 1.A.1 page no 32)
Providing and supplying C. I. Temper proof Air valves with SS 304 Float gun
metal- nozzle of approved make & quality of following class and diameter
including all taxes, insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to departmental stores,
stacking etc. complete.
Rupees Five Thousand Four Hundred Ninety
No (a) Temper proof Air valve 50 mm Without Isolating Sluice Valve 5499.00 Nine only No
(GWSSB SOR- 2022-23 item no 16.2.A-2 , page no 26)
Lowering, laying, fixing and jointing PVC/uPVC/cPVC pipes and specials of
following class and diameter including cost of conveyance from stores to site
of works including cost of labour, material, cement solvent, giving satisfactory
hydraulic testing as per ISI code.
Kurbai Proposed TW to Existing Pipeline
950.00 Rmt 90 mm pvc pipe 6kg/cm2 17.00 Rupees Seventeen only Rmt
Mosuna Proposed TW to Mosuna Sump
400.00 Rmt 90 mm pvc pipe 6kg/cm2 17.00 Rupees Seventeen only Rmt
Rampar Roha Proposed TW to Mosuna Sump
450.00 Rmt 90 mm pvc pipe 6kg/cm2 17.00 Rupees Seventeen only Rmt
(GWSSB SOR- 2022-23 item no 8.4, page no 37)
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal
1122.55 Rupees Twenty Two only
Cum of surplus stuff as directed within a radius of 3 km. Refilling as directed 22.00 Cum
(GWSSB SOR 2022-23 item no 14.1, page no 40)
Qty Unit Description of item Tender Rate Rate in Figure Per Amount
Erection of air valve riser by installing new M.S pipe of 6mm thick and 3.2 mt
length with necessary fittings such as flange of appropriate size, nut bolts and
embedded the pipe in RCC M;15 with offset of 10 cm around pipe with
necessary steel etc complete.
(a) Temper proof Air valve 50 mm Without Isolating Sluice Valve Rupees Three Thousand One Hundred Twelve
No 3112.00 only No
B) Construction of Pump House Near New Bore of Kurbai TW SHW, Mosuna SHW and Rampar Roha SHW
Excavation for foundation upto 1.5 m depth including sorting out and stacking
of useful materials and disposing off the excavated stuff upto 50 Meter lead.
Rupees Two Hundred Twelve & Paise Fifty
(A)Loose or soft soil (40%) 212.52 Cum
1.41 Cum Two only
Rupees Two Hundred Seventy Two & Paise
(B)Dense or Hard soil (60%) 272.57 Cum
2.11 Cum Fifty Seven only
Rupees Two Hundred Twelve & Paise Fifty
(A)Loose or soft soil (40%) 212.52 Cum
1.41 Cum Two only
Rupees Two Hundred Seventy Two & Paise
(B)Dense or Hard soil (60%) 272.57 Cum
2.11 Cum Fifty Seven only
Rampar Roha SHW
Rupees Two Hundred Twelve & Paise Fifty
(A)Loose or soft soil (40%) 212.52 Cum
1.41 Cum Two only
Rupees Two Hundred Seventy Two & Paise
(B)Dense or Hard soil (60%) 272.57 Cum
2.11 Cum Fifty Seven only
(R.& B. S.O.R.Kutch 2021-22. CH.-4, PG No- 46, I. No.04B001A,B )
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6-
hand broken stone aggregates 40 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and Plinth
Rupees Three Thousand Ninety Five & Paise
1.06 Cum Twenty Five only
Rupees Three Thousand Ninety Five & Paise
1.06 Cum Twenty Five only
Qty Unit Description of item Tender Rate Rate in Figure Per Amount
Rampar Roha SHW
Rupees Three Thousand Ninety Five & Paise
1.06 Cum Twenty Five only
(R.& B. S.O.R. Kutch 2021-22 .CH.-5, PG No- 48, I.No. 5.3.2 )
Precast concrete block masonry (including quoin blocks jamb blocks closer
etc.) with solid concrete blocks of approved size made of cement concrete
1:3:6 mix (1- Cement : 3 coarse sand: 6- graded stone aggregates of 20 mm
and down grade) in foundation and
plinth cement morter 1:6
Rupees Three Thousand Seven Hundred
(3.1) For Foundation and plinth 3771.97 Cum
6.06 Cum Seventy One & Paise Ninety Seven only
Rupees Three Thousand Seven Hundred
(3.1) For Foundation and plinth 3771.97 Cum
6.06 Cum Seventy One & Paise Ninety Seven only
Rampar Roha SHW
Rupees Three Thousand Seven Hundred
(3.1) For Foundation and plinth 3771.97 Cum
6.06 Cum Seventy One & Paise Ninety Seven only
(R.& B. S.O.R. Kutch 2021-22 CH-7, PG No-72, I. No.7.75)
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron
J or L Hooks, Bolts and nuts 8mm diameter with bitumen and G.I. limpet
washer or G.I. limpet washer. filled with white lead complete excluding the
cost of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet.
Rupees Seven Hundred Thirty Four & Paise
Kurbai TW SHW 734.19 Sqmt.
1.62 Sqmt. Nineteen only
Rupees Seven Hundred Thirty Four & Paise
Mosuna SHW 734.19 Sqmt.
1.62 Sqmt. Nineteen only
Rupees Seven Hundred Thirty Four & Paise
Rampar Roha SHW 734.19 Sqmt.
1.62 Sqmt. Nineteen only
R&B S.O.R. Kutch 2021-22, P.No.116, Item Code No.15001A, Item No.15.1
Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8-
hand broken stone aggregates 40 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and Plinth
Rupees Two Thousand Seven Hundred Sixty
Kurbai TW SHW 2769.69 Cum
0.29 Cum Nine & Paise Sixty Nine only
Rupees Two Thousand Seven Hundred Sixty
Mosuna SHW 2769.69 Cum
0.29 Cum Nine & Paise Sixty Nine only
Rupees Two Thousand Seven Hundred Sixty
Rampar Roha SHW 2769.69 Cum
0.29 Cum Nine & Paise Sixty Nine only
Qty Unit Description of item Tender Rate Rate in Figure Per Amount
(R.& B. S.O.R.Kutch 2021-22 ,P.No.48 ,CH-5, I. No.5.3.3)
Providing and laying cement concrete flooring 1:2:4 (1-cement : 2-coarse sand
: 4- graded stone aggregate 20mm nominal size) laid in one layer and finished
with a floating
coat of neat cement. (B) 50mm thick.
Rupees Three Hundred Thirty Nine & Paise
Kurbai TW SHW 339.08 Sqmt.
4.00 Sqmt. Eight only
Rupees Three Hundred Thirty Nine & Paise
Mosuna SHW 339.08 Sqmt.
4.00 Sqmt. Eight only
Rupees Three Hundred Thirty Nine & Paise
Rampar Roha SHW 339.08 Sqmt.
4.00 Sqmt. Eight only
(R.& B. S.O.R. Kutch 2021-22 ,P.No.113 ,CH-14, Item Code No.14015BA ,I. No.14.71)
Providing and fixing ridges and hips in asbestos cement sheets roofing with
G.I. J or L hooks, bolts and nuts 8mm dia. G.I. plain and bitument washers
complete. (D) North light adjustable ridge.(i) 0.60mm thick sheet
7.20 Rmt. Kurbai TW SHW 149.00 Rupees One Hundred Forty Nine only Rmt.
7.20 Rmt. Mosuna SHW 149.00 Rupees One Hundred Forty Nine only Rmt.
7.20 Rmt. Rampar Roha SHW 149.00 Rupees One Hundred Forty Nine only Rmt.
Filling available excavated earth (excluding rock) in trenches. plinth,
sides of foundations etc. in layers not exceeding 20 cm. in depth
consolidating each disposited layer by ramming and watering.
Rupees One Hundred Thirty Six & Paise
Kurbai TW SHW 136.92
1.50 Cum Ninety Two only Cum
Rupees One Hundred Thirty Six & Paise
Mosuna SHW 136.92
1.50 Cum Ninety Two only Cum
Rupees One Hundred Thirty Six & Paise
Rampar Roha SHW 136.92
1.50 Cum Ninety Two only Cum
(R.& B. S.O.R. Kutch 2021-22 , P.No.44 CH-4, I. No.4.12)
Qty Unit Description of item Tender Rate Rate in Figure Per Amount
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of
single or half brick walls for interior plastering upto floor two level and
finished even and smooth in (i) Cement mortar 1:3 (1-cement:3-sand)
Kurbai TW SHW 180.40 Rupees One Hundred Eighty & Paise Forty only Sqmt.
Mosuna SHW 180.40 Rupees One Hundred Eighty & Paise Forty only Sqmt.
Rampar Roha SHW 180.40 Rupees One Hundred Eighty & Paise Forty only Sqmt.
(R.& B. S.O.R.Kutch 2021-22 P.No.120,CH-17 It. No.-17.6) Total =
A) Providing , Supplying , Lowering,Laying And Jointing Connecting PVC Pipeline of New TW
to SHW Sump and Existing Pipeline at Various Location of Nakhatrana Taluka. Rs.
B) Construction of Pump House Near New Bore of Kurbai TW SHW, Mosuna SHW and
Rampar Roha SHW Rs.
593998.14 Rupees Five Lac Ninety Three Thousand Nine Hundred Ninety Eight & Paise Fourteen only
I / We am / are willing to carry out the work at__________________% above / below. Percent (should be written in figure and words) of the estimated rates mentioned above. Amount of my/our
tender works out as under.:-
Estimated amount Rs. 593998.14 Estimated amount Rs.
Put to tender Rs. Put to tender Rs.
Deduct % below Rs. Add % above Rs.
Net Rs. Net Rs.
In words Rs. In words Rs.
lease strick out which ever is not applicable)
1 All the work shall be carried out as per P. W. D. Hand book vol. I & II and other specification of the Division Office as directed.
2 All the columns in schedule "B" should be filled in the total of the entry in the last column should be struck by the contractor under his signature.
3 Rates quoted shall be for the completed items of work and shall include clearance of site (prior to commencement of work and its closer) in all respect and hold good for work under all
condition of site.
Signature of the Contractor
Deputy Executive Engineer Executive Engineer
P. H. S. Sub Division P. H. Works Division
Nakhatrana - Kachchh GWSSB, Nakhtrana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 NIT.pdf
2 VOL 1 A Technical Bid.pdf
3 VOL 1 B GCC.pdf
4 VOL 2 A Extent of Work.pdf
5 VOL 2 B 1 Tech Spec.pdf
6 VOL 3 Price bid.pdf
7 VOL 4 Drawings.pdf
8 AFFIDAVIT.pdf
9 GST Rule Applicable.pdf
Drawing VR complex-PL.pdf
Schedule A.pdf
Schedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .