Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1Accepted-AOC 635 SECTOR 4 URBAN ESTATE KURUKSHETRA HARYANA | KURUKSHETRA | KURUKSHETRA | HARYANA | 200 | l1 | Accepted-AOC accepted | |
| 2 | l2₹1Same as L1Rejected-Finance | l2 | Rejected-Finance rejected after negotiation | |
| 3 | l3₹1Same as L1Rejected-Finance | l3 | Rejected-Finance rejected after negotiation | |
| 4 | l4₹1Same as L1Rejected-Finance | l4 | Rejected-Finance rejected after negotiation |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
20 Dec 2021, 11:00 amClosed
commissioner mc ambala city
commissioner mc ambala city
Empanelment of Consultants with MCA for the purpose of planning, Preparation of Architectural/Structural Design drawings, drafting estimates, DPR DNIT etc. of works related to Engineering branch of Municipal Corporation, Ambala
2021_HRY_199375_1
MCA/XEN/2021/3080
Open Tender
Miscellaneous Services
Works
90 days
commissioner mc ambala city
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹30,000
Yes
20 May 2022
10 Dec 2021
20 Dec 2021
10 Dec 2021
20 Dec 2021
10 Dec 2021
Amount
Architectural and structural design of buildings and other structures including its planning, Estimation and DNIT. o Project cost less than 25.00 lakhs Unit :- percentage of estimate cost
o Project cost between 25.00 to 100.00 lakhs Unit :- percentage of estimate cost
o Project cost more than 100.00 lakhs Unit :- percentage of estimate cost
Design of Micro STP/ UGT/ Boosting Station including Estimate and DNIT. o Project cost less than 25.00 lakhs Unit :- percentage of estimate cost
o Project cost between 25.00 to 100.00 lakhs Unit :- percentage of estimate cost
o Project cost more than 100.00 lakhs Unit :- percentage of estimate cost
Total services i.e. Planning, Designing of Infrastructures development like roads/ Streets/ Cycle Track/ Footpath, water supply, sewerage, storm drainage, and horticulture work & other beautification work including development of existing infrastructure. o Project cost less than 25.00 lakhs Unit :- percentage of estimate cost
o Project cost between 25.00 to 100.00 lakhs Unit :- percentage of estimate cost
o Project cost more than 100.00 lakhs Unit :- percentage of estimate cost
Conducting Topographical Survey of Road/ Streets/ Nala etc, by using DGPS for Development of infrastructure including taking out X-section at an interval of 50m and L- Section at 30m, preparations of L-Section and X-Section of Road. Submit data Along with Digital Plan showing level and contours including Marking of Latitude and Longitude of Junctions Per KM
Supervision of Development projects above 1.0 crore Project Cost including Time to Time Site Visit, Consultation with Contractor and report to Concerned Officer. Unit :- percentage of estimate cost
ARG Technocrats
OBTUSE DESIGN STUDIO
CREATIVE DESIGN GROUP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_262844.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .