Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
16 Oct 2026, 6:00 pmClosed
xen
kalakote
Black topping from main road Lambi Bari to Sayari Changus to NS Ladote. Under Pot Holes
2026_PWDJK_327695_3
eNIT No 62 of 2026/27 dated 09/10/2026
Open Tender
Civil Works
Percentage
30 days
kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
xen
₹40,000
10 Oct 2026
10 Oct 2026
17 Oct 2026
10 Oct 2026
16 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:
.1 All kinds of soil : | 180 | cum | 256.85 | ₹46,233 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 99 | cum | 218.4 | ₹21,621.6 |
| 3 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity
including making good the undulations etc. with earth or quarry spoils etc.
and rerolling the subgrade. | 330 | sqm | 2.8 | ₹924 |
| 4 | Supplying and stacking at site Graded crushed stone aggregate of size 63 to 45mm | 148 | Cum | 1,204.15 | ₹1,78,214.2 |
| 5 | Supplying and stacking at site Graded crushed stone aggregate of size 13.2 mm | 22 | Cum | 1,204.15 | ₹26,491.3 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate (size
range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification
including premixing the material with water at OMC in mechanical mix
plant, carriage of mixed material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base
course on well prepared surface and compacting with vibratory roller of 8
to 10 tonne capacity to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge | 111 | Cum | 1,885.95 | ₹2,09,340.45 |
| 7 | Providing and applying tack coat using hot straight run bitumen of grade –
VG-10, including heating the bitumen, spraying the bitumen with
mechanically operated spray unit fitted on bitumen boiler, cleaning and
preparing the existing road surface as per specifications.
On W.B.M. @ 0.75 Kg/sqm | 1,485 | sqm | 74.35 | ₹1,10,409.75 |
| 8 | Providing and laying bituminous macadam using crushed stone aggregates
of specified grading premixed with bituminous binder, transported to site
by tippers, laid over a previously prepared surface with paver finisher
equipped with electronic sensor to the required grade, level and alignment
and rolling with smooth wheeled, vibratory and tandem rollers as per
specifications to achieve the desired compaction and density, complete as
per specifications and directions of Engineer-in-Charge.
16.63.1 16.63.2 A 50 to 100 mm average compacted thickness with bitumen
of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared
in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 73 | cum | 8,590.95 | ₹6,27,139.35 |
| 9 | Laying, spreading and compacting stone aggregate of specified sizes to
WBM specifications in uniform thickness, hand picking, rolling with 3
wheeled road / vibratory roller 8-10 tonne capacity in stages to proper
grade and camber, applying and brooming requisite type of screening
/binding material to fill up interstices of coarse aggregate, watering and
compacting to the required density. | 148 | Cum | 768.15 | ₹1,13,686.2 |
| 10 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent | 1,485 | sqm | 268.15 | ₹3,98,202.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_1108855.xls
BOQ • 1.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .