Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-AOC | ₹7.5 Cr | L1 | Accepted-AOC Quoted lowest price |
| 2 | L2₹7.6 Cr+₹12.0 L (1.60%)Rejected-Finance MONIGRAM MURSHIDABAD WB 742237 | MURSHIDABAD | WEST BENGAL | 742237 | ₹7.6 Cr+₹12.0 L (1.60%) | L2 | Rejected-Finance Quoted higher price |
| 3 | L3₹7.9 Cr+₹34.8 L (4.62%)Rejected-Finance VILL ADISAPTAGRAM PO MOGRA | ₹7.9 Cr+₹34.8 L (4.62%) | L3 | Rejected-Finance Quoted higher price |
| 4 | L4₹10.3 Cr+₹2.8 Cr (37.2%)Rejected-Finance 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹10.3 Cr+₹2.8 Cr (37.2%) | L4 | Rejected-Finance Quoted higher price |
| 5 | Not Admitted-Fee | - | - | Not Admitted-Fee EMD/Instrument is not valid |
| Sl No | Description | Qty | Unit | BLUE HILL INTERNATIONAL | AKA Logistics Private Limited | HANSESWARI CORPORATE MANPOWER MANAGEMENT LIMITED | SHRI NARAYAN CONSTRUCTION COMPANY |
|---|---|---|---|---|---|---|---|
| 1.01 | MANDATORY JOBS
Engagement of manpower for (a) cleaning & housekeeping of boiler house, coal mills areas, coal feeders areas,ID Fans,FD Fans,PA Fans,ESP areas and other adjacent areas including supply of tools & tackles, (b) Providing round the clock physical assistance to various shift work including supply of tools & tackles, (c) Round the clock operation(including manual/AUTO rejection of coal mill round the clock) & Tit-bit maintenance of MRHS of Stage-II (2 X500 MW) including supply of tools & tackles, necessary consumables as per scope.
For [68 worker] Cost estimation including escalation=[Minimum wages +Tools & tackles + consumables + Over head and profit]
Minimum wage for 68 worker - Rs 13,29,803.52 per month. | 24 | Month | 3,51,06,792 ₹3,51,06,792 Lowest | 4,07,06,352 ₹4,80,33,495.36 | 3,44,18,423.52 ₹4,06,13,739.75 | 3,19,20,000 ₹3,76,65,600 |
| 1.02 | MANDATORY JOBS
Extra semi-skilled manpower engagement as and when basis with tools, tackles & safety equipments for cleaning, bunker chute jam clearing & other purposes on emergency situation.
Cost estimation including escalation=[Minimum wages+Tools & tackles + consumables + Over head and profit]
Minimum wage for extra manpower-Rs 608.17 per manday. | 3,000 | Man day | 18,30,000 ₹18,30,000 Lowest | 23,27,100 ₹27,45,978 | 19,83,000 ₹23,39,940 | 18,30,000 ₹21,59,400 |
| 1.03 | MANDATORY JOBS
For engagement of tractor for shifting mill reject or coal dust from mill reject silo hopper. | 20,000 | TRP | 30,00,000 ₹30,00,000 Lowest | 60,20,000 ₹71,03,600 | 35,00,000 ₹41,30,000 | 42,00,000 ₹49,56,000 |
| 1.04 | MANDATORY JOBS
For engagement of tractor for shifting mill reject/coal/dust
/ash/debrisetc from mill bay, boiler area, ESP area, Ash slurry
pump house area, etc. | 26,000 | TRP | 52,00,000 ₹52,00,000 Lowest | 1,03,87,000 ₹1,22,56,660 | 61,10,000 ₹72,09,800 | 54,60,000 ₹64,42,800 |
| 1.05 | MANDATORY JOBS
Boiler all elevations cleaning. | 24 | Number | 10,80,000 ₹10,80,000 | 14,15,136 ₹16,69,860.48 | 10,56,000 ₹12,46,080 | 8,40,000 ₹9,91,200 Lowest |
| 1.06 | MANDATORY JOBS
Engagement of JCB/Hydra | 2,400 | Hours | 12,00,000 ₹12,00,000 Lowest | 24,11,520 ₹28,45,593.6 | 16,56,000 ₹19,54,080 | 21,60,000 ₹25,48,800 |
| 1.07 | Safety Kits estimation for first year | 1 | Number | 2,50,000 ₹2,50,000 | 4,42,019 ₹5,21,582.42 | 2,40,000 ₹2,83,200 | 1,75,000 ₹2,06,500 Lowest |
| 1.08 | Safety Kits estimation for 2nd year | 1 | Number | 15,000 ₹15,000 Lowest | 22,181 ₹26,173.58 | 15,000 ₹17,700 | 15,000 ₹17,700 |
| 1.09 | Optional Job:
For engagement of tractor for shifting mill reject/coal/dust
/ash/debrisetc from mill bay, boiler area, ESP area, Ash slurry pump house area, etc. | 5,000 | TRP | 10,00,000 ₹10,00,000 Lowest | 19,97,500 ₹23,57,050 | 12,00,000 ₹14,16,000 | 10,50,000 ₹12,39,000 |
| 1.10 | Optional Job
Engagement of JCB/Hydra | 600 | Hours | 3,00,000 ₹3,00,000 Lowest | 6,02,880 ₹7,11,398.4 | 3,90,000 ₹4,60,200 | 5,40,000 ₹6,37,200 |
Tender Value
₹8.9 Cr
EMD Value
₹17.8 L
Closing Date
9 Mar 2026, 3:00 pmClosed
The General Manager, SGTPP
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Biennial Maintenance contract for Cleaning and Housekeeping of Boiler/Coal mill area and other adjacent area and round the clock operation and tit-bit maintenance of MRS for Unit 3 and Unit 4 and upcoming Unit 5 at SgTPP, WBPDCL
2026_WBPDC_993590_1
WBPDCL/SGTPP/NIT/E3865/25-26
Open Tender
Support/Maintenance Service
Lump-sum
730 days
SgTPP, WBPDCL
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance
3 documents required · 3 mandatory
₹0
₹17.8 L
Yes
Contract Cell, SGTPP,Admin Bldg
14 Jun 2026
24 Jan 2026
12 Mar 2026
5 Feb 2026
9 Mar 2026
5 Feb 2026
19 Feb 2026
MANDATORY JOBS Engagement of manpower for (a) cleaning & housekeeping of boiler house, coal mills areas, coal feeders areas,ID Fans,FD Fans,PA Fans,ESP areas and other adjacent areas including supply of tools & tackles, (b) Providing round the clock physical assistance to various shift work including supply of tools & tackles, (c) Round the clock operation(including manual/AUTO rejection of coal mill round the clock) & Tit-bit maintenance of MRHS of Stage-II (2 X500 MW) including supply of tools & tackles, necessary consumables as per scope. For [68 worker] Cost estimation including escalation=[Minimum wages +Tools & tackles + consumables + Over head and profit] Minimum wage for 68 worker - Rs 13,29,803.52 per month.
MANDATORY JOBS Extra semi-skilled manpower engagement as and when basis with tools, tackles & safety equipments for cleaning, bunker chute jam clearing & other purposes on emergency situation. Cost estimation including escalation=[Minimum wages+Tools & tackles + consumables + Over head and profit] Minimum wage for extra manpower-Rs 608.17 per manday.
MANDATORY JOBS For engagement of tractor for shifting mill reject or coal dust from mill reject silo hopper.
MANDATORY JOBS For engagement of tractor for shifting mill reject/coal/dust /ash/debrisetc from mill bay, boiler area, ESP area, Ash slurry pump house area, etc.
MANDATORY JOBS Boiler all elevations cleaning.
MANDATORY JOBS Engagement of JCB/Hydra
Safety Kits estimation for first year
Safety Kits estimation for 2nd year
Optional Job: For engagement of tractor for shifting mill reject/coal/dust /ash/debrisetc from mill bay, boiler area, ESP area, Ash slurry pump house area, etc.
Optional Job Engagement of JCB/Hydra
Optional Job Constructions of approach road at coal reject yard with boulder, coal reject materials etc (width-4 meter, length-400 meters).
Optional Job Dressing of rejection materials at coal reject yard (Approx.Size of yard:- 80 m X 40 m)with the help of dozer
MANDATORY JOBS-Unit-5(Stage -III) Engagement of manpower for (a) cleaning & housekeeping of boiler house, coal mills areas, coal feeders areas,ID Fans,FD Fans,PA Fans,ESP areas and other adjacent areas including supply of tools & tackles, (b) Providing round the clock physical assistance to various shift work including supply of tools & tackles, (c) Round the clock operation(including manual/AUTO rejection of coal mill round the clock) & Tit-bit maintenance of MRHS of Stage-III (660 MW) including supply of tools & tackles, necessary consumables as per scope. For [40 worker] Cost estimation including escalation=[Minimum wages+Tools & tackles + consumables + Over head and profit] Minimum wage for 40 worker - Rs 7,78,251.21 per month.
MANDATORY JOBS, Unit-5(Stage -III): Extra semi-skilled manpower engagement as and when basis with tools, tackles & safety equipments for cleaning, bunker chute jam clearing & other purposes on emergency situation. Cost estimation including escalation=[Minimum wages+Tools & tackles + consumables + Over head and profit] Minimum wage for extra manpower-Rs 608.17 per manday.
MANDATORY JOBS,Unit-5(Stage -III) For engagement of tractor for shifting mill reject or coal dust from mill reject silo hopper.
MANDATORY JOBS,Unit-5(Stage -III) For engagement of tractor for shifting mill reject/coal/dust /ash/debrisetc from mill bay, boiler area, ESP area, Ash slurry pump house area, etc.
MANDATORY JOBS,Unit-5(Stage -III): Boiler all elevations cleaning.
MANDATORY JOBS,Unit-5(Stage -III): Engagement of JCB/Hydra
Safety Kits estimation for first year, Unit-5(Stage -III):
Safety Kits estimation for 2nd year, Unit-5(Stage -III):
Optional Job stage-III For engagement of tractor for shifting mill reject/coal/dust /ash/debrisetc from mill bay, boiler area, ESP area, Ash slurry pump house area, etc.
Optional Job-Stage -III Engagement of JCB/Hydra
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
RTD.pdf
Tender Documents • 1.18 MB
BOQ_2430475.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .