| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 00 LALPUR KICHHA ROAD RUDRAPUR KICHHA RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263148 | UDAM SINGH NAGAR | UTTARAKHAND | 263148 | L1 | Accepted-AOC Lowest amount quoted | |
| 2 | L2₹18.7 L+₹1.3 L (7.76%)Rejected-Finance | L2 | Rejected-Finance Higher amount quoted | |
| 3 | L3₹20.7 L+₹3.4 L (19.3%)Rejected-Finance | L3 | Rejected-Finance Higher amount quoted | |
| 4 | L4₹21.0 L+₹3.6 L (20.7%)Rejected-Finance JAISALMER | JAISALMER | RAJASTHAN | 342310 | L4 | Rejected-Finance Higher amount quoted | |
| 5 | L5₹23.0 L+₹5.7 L (32.5%)Rejected-Finance | L5 | Rejected-Finance Higher amount quoted |
Tender Value
₹25.9 L
EMD Value
₹51,780
Closing Date
19 Dec 2020, 6:00 pmClosed
CWE A Jaisalmer
CWE A Jaisalmer
OUTSOURCING THE RESOURCE FOR MAINTENANCE AND OPERATION OF WATER SUPPLY INSTALLATIONS AT KHETOLAI, LATHI AND NACHANA UNDER AGE (I) POKARAN
2020_MES_389435_2
83886
Open Tender
Manpower Supply
Works
333 days
AGE (I) Pokaran
Please refer tender documents
10 documents required · 10 mandatory
₹500
Yes
GE(A) JAISALMER
₹51,780
Yes
20 Jan 2021
30 Nov 2020
21 Dec 2020
30 Nov 2020
19 Dec 2020
7 Dec 2020
Amount
Outsourcing the resource for maint and operation of Water Supply net works including pump houses, DG Sets centrifugal pump sets complete with all accessories and attending break down 24 hrs complete in three shifts round the clock ( One FGM each shift) in all Khetolai Pump Houses, located in the same complex loc within 1 KM (Old & New), including to keep up water supply installation shift operational and in healthy condition 24 hrs daily including all daily maintenance with record by providing under mantion adequate strength of staff at KHETOLAI PUMP HOUSE. (a) First Shift - 0600 Hrs to 1400 Hrs - 01 No FGM (b) Second Shift - 1400 Hrs to 2200 Hrs - 01 No FGM (c)Third Shift -2200 Hrs to 0600 Hrs - 01 No FGM comprissing of the following mechinries & equipments :- (a) Centrifugal pump set 55/50 HP -04 Nos ( New Pump House-03 & Old Pump House -01 Nos) (b ) Centrifugal pump set 40 HP -02 Nos ( New Pump House) (c) Centrifugal pump set 20 HP -01 Nos ( Old Pump House) (d) Star Delta Starter -05 Nos (e) Electrical control Panel -05 Nos (f) Change Over Switch -03 Nos (g) DG Set 160 KVA -01 Nos
Outsourcing the resource for maint and operation of Water Supply net works including pump houses, DG Sets centrifugal pump sets complete with all accessories and attending break down 24 hrs complete in three shifts round the clock ( One FGM each shift) in Lathi Pump Houses, located in the same complex loc within 1 KM (Old & New),including to keep up water supply installation shift operational and in healthy condition 24 hrs daily including all daily maintenance with record by providing under mantion adequate strength of staff at LATHI PUMP HOUSE. (a) First Shift - 0600 Hrs to 1400 Hrs - 01 No FGM (b) Second Shift - 1400 Hrs to 2200 Hrs - 01 No FGM (c)Third Shift -2200 Hrs to 0600 Hrs - 01 No FGM comprissing of the following mechinries & equipments :- (a) Centrifugal pump set 40 HP -02 Nos. (b ) Centrifugal pump set 20 HP -02 Nos. (c) Bore well submirsible pump set -02 Nos. (d) Star Delta Starter -07 Nos (e) Colum Pipe with fitting (f) Electrical control Panel -08 Nos (f) Change Over Switch -02 Nos (g) DG Set 63 KVA -03 Nos
Outsourcing the resource for maint and operation of Water Supply net works including pump houses, DG Sets centrifugal pump sets complete with all accessories and attending break down 24 hrs complete in three shifts round the clock ( One FGM each shift) in CETC Nachana Pump Houses, located in the same complex loc within 1 KM (Old & New), including to keep up water supply installation shift operational and in healthy condition 24 hrs daily including all daily maintenance with record by providing under mantion adequate strength of staff at CETC NACHANA PUMP HOUSE. (a) First Shift - 0600 Hrs to 1400 Hrs - 01 No FGM (b) Second Shift - 1400 Hrs to 2200 Hrs - 01 No FGM (c)Third Shift -2200 Hrs to 0600 Hrs - 01 No FGM comprissing of the following mechinries & equipments :- (a) Centrifugal pump set 75 HP -03 Nos. (b ) Centrifugal pump set 7.5 HP -02 Nos. (c) Electrical control Panel -04 Nos (d) Change Over Switch -02 Nos (e) DG Set 160 KVA -01 & 20 KVA 01 = 02 Nos
Note for Ser Item No 1 to 3: (i) Contractors are advised to visit the site before quoting the rates (ii) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/Central Government from time to time whichever is higher (Issued from GOI time to time). (iii)The payment shall be made to the workers through online banking and bank statement of fair wages as per minimum labour wages as mentioned above shall be submitted along with the RARs/FB for payments. (iv) The contractor shall be responsible for the EPF, ESI, Bonus, LWC,Safety etc,and insurance of all trademen employed by him as per existing Labour Rules/Acts/Regulations. (v) Contractor special attention is invited that payment of FGM/worker shall be made only online banking and same shall be deposited in Adhar link account of FGM/worker. Documentary evidence for the same shall be submitted to Accepting Officer/Garisson Engineer/ Engr-in-Charge before payment of RAR/Final bill. (vi) Contractor and his personnel detailed for management and operating of water supply installation shall be responsible for serviceability of installation.In case of any major fault occurs in above mentioned items, he will report directly to concerned JE E/M/AGE E/M,Person deputed for manning & operation will be responsible for minor maintenance and cleaning of surrounding area complete. (vii) Necessary weekly off will be given to manpower employed for this schedule as per existing rules and regulation of state/central govt,and necessary replacement will be provided by the contractor.Rates quoted for this schedule shall deemed to be included this provision. (viii) In case absence of any FGM/worker from any shift will be penalized with a penalty of double the rate quoted by the contractor, in addition to the shift not taken in to consideration for payment.FGM and workmen wanting leave will get it sanctioned before proceeding on leave along with the name of individual who will be performing his duty/shift in his absence.No replacement of FGM /workmen without the knoweledge of department will be allowed.
(ix) Safety equipments tools and first aid kit and uniform by the contractor will be provided to all tradesmean without any extra cost to government. (x) Log book, Muster roll, duty roster, daily breakdown register, attendance register and other requisite register shall be maintained by FGM/worker and get it signed by concerned JE,Engineer-in-Charge and Contractor on daily basis and same shall be submitted monthly to accepting officer for inspection and other details as specified in PS. (xi) FGM should posses ITI certificate in respective trade with minimum 02 years experience or 3 year experince certificate for running of water Supply installation and well conversant with the water supply equipmens with connected panels and must produce qualification and experience certificates duly attested by Gazetted officer.The attested certificate shall be submitted to accepting officer at the time of commencement of work. (xii) The GST included in the rates quoted against all items. (xiii) It is sole responsibility of cotractor if any mishappening occurs including accident/injury due to any reason, Department shall not be held responsible on this account. Nothing exta shall be admissible on this account from the department.
M/s Rashid Mohammed
star electricals
S K TRADER
L C ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .