Tender Value
₹43.3 L
EMD Value
₹44,000
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer, R&B Division, Bhuj
SR To Mundra Zarpara Kandagara Road Ch.29/590 By Retaining Wall Ta: Mundra, Dist. Kutch
311223
22 For 2026-27
Open
Repair and Maintenance
Kutch
10 documents required · 10 mandatory
₹1,500
Executive Engineer, R and B Division, Bhuj
₹44,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
Name of work :-
SR To Mundra Zarpara Kandagara Road Ch.29/590 By Retaining
Wall Ta: Mundra, Dist. Kutch
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated In Figures In Words
but may be estimated Quantities
1 476.00 Excavation for foundation in sand, 511.11 Rupees Five Cum
gravel, clay soft soils and murrum Hundred
etc. including shoring, strutting Eleven And
dewatering as necessary and Paise Eleven
disposing of the excavated stuff as Only
directed.(A) Depth upto 3.0m
2 45.26 Providing and filling in foundation 3327.08 Rupees Three Cum
with ordinary Cement concrete M- Thousand
100 mix and providing necessary Three Hundred
vertical pin headers including Twenty Seven
formwork, vibrating, ramming and And Paise
curing complete. Eight Only
3 286.88 Providing and casting in situ 5454.00 Rupees Five Cum
controlled cement concrete M-300 Thousand
for R.C.C. return as per drawings Four Hundred
including centering shuttering, Fifty Four Only
scaffolding where necessary, laying
vibrating, curing and finishing
complete.(A) Height from 0.0 to
M. (1) Piers (2) Abutment (3)
RCC return(4) raft etc
4 21.52 Providing and laying in position FE 91563.57 Rupees Ninety MT
550D TMT bar reinforcement One Thousand
including cutting, bending, Five Hundred
hooking and tying complete as per Sixty Three
detailed drawings for the And Paise Fifty
following.(A) Piers (B) Abutments Seven Only
(C) R.C.C. Returns
5 212.50 Providing and laying - Fitter 1239.35 Rupees One SMT
Media 600mm thick directed at Thousand Two
the back of abutments, returns Hundred
and wing walls as per detailed Thirty Nine
specifications. And Paise
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
6 127.50 Providing, laying and jointing in 876.90 Rupees Eight Rmt
true line and level 110 diametre Hundred
U.P.V.C (Type B) conforming to IS Seventy Six
13592-1992 with one end plain And Paise
and other end socketed with Ninety Only
rubber ring, & fittings conforming
to ISI 14735-1999 of approved.
pipe shall be fixed on wall heigh
at every 1000 mm center to center
or shall be concealed in walls as
directed. for weep hole in
Aburtments, and returns proper
grede and jointing the completed
as per detailed specification.
7 153.42 Filling available excavated 136.92 Rupees One Cum
earth (excluding rock) in Hundred
trenches. plinth, sides of Thirty Six And
foundations etc. in layers not Paise Ninety
exceeding 20 cm. in depth Two Only
consolidating each disposited
layer by ramming and watering.
Rupees Forty Three Lakh(s) Twenty Five Thousand One Hundred Thirty Six And Paise Forty
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications
of Division or as directed.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects
and hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing of material shall be statement attached with the GERI Vadodara. Bill for testing charges
shall be paid by the Executive Engineer and 1% (One Percent) of amount put to tender excluding
cost of materials to be issued as schedule A i.e. Rs. _________ shall be recovered from the
Contractor's running bills as per (R&B) Department No.TNC/1085/(4)/C dated 10-5-85 and 20-12-
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$
YL ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
Note-9 Labour Cess 1% of estimated cost put to tender for this work shall be recovered from the contract
payment as "Labour Cess" in terms of the Gujarat Govt. Gazette - extra ordinary - dt.12.12.2004,
implementation of buildings and other construction work (resolution of employment and conditions
of services Act'1996)
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the
difference of cement consumption shall be deducted from rate of original item at the rate of star
rate mentioned in tender. However for Increase in quantity of cement no additional payment shall
earthquake resistance provision the work shall be carried out as per the instruction of Engineer
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM
ZC[X[ H[ V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S
.HG[ZGF GFD4 SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF
SFD 5Z CFHZ YIF V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST
XZT D]HA lGI]lST YFI TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI
NZdIFG lGI]S SZ[, .HG[Z SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT
SZJFDF\ VFJX4 H[ GMG ZLO\0[A, ZC[X[P
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
BUILDING SPECIFICATIONS BOOK.pdf
GR.pdf
Spe. Index.pdf
Road Work Booklet Part 1.pdf
Road Work Booklet Part 2.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
SBD Book.pdf
Download all tender documents and submit your bid