Tender Value
₹40.3 L
EMD Value
₹40,400
Closing Date
18 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
superintending Engineer
Spot monthly/Bi-monthly billing at site for consumer premises through GPRS men power to be provided as and when required at different S/Dns of Mandvi Division under Bhuj Circle Office.
284239
721-1
Open
Services
Kutch
12 documents required · 12 mandatory
₹1,475
Paschim Gujarat Vij Company Limited
₹40,400
9 Mar 2026
9 Mar 2026
9 Mar 2026
18 Mar 2026
9 Mar 2026
2 Estimated cost in Rs. Rs.40,33,620/-
3 Tender Fees in Rs. (non-refundable) with 18 % GST Rs.1,475/-
Payment of tender fees to be deposited online by
4 Earnest Money Deposit amount in Rs. Rs.40,400/-
Payment of tender fees to be deposited online by
5 On line (e-tendering) Tender offer download last Dt.0.0.26
Date __________ up to 17:00 hours only. (This is
6 On line (e-tendering) Tender offer submission last Dt.0.0.26
Date __________ up to 18:00 hours only. (This is
7 Date of opening of Tender fee, EMD cover of bid at -
Date __________ @ 11:00 hours (if possible)
8 Date of opening of On Line Technical Bid at Date Dt.0.0.26
__________ @ 11:00 hours (if possible)
9 Date of opening of On Line Price bid, Date Dt.0.0.26
__________ @ 12:00 hours (if possible)
10 Validity of Bid 120 Days
Superintending Engineer
Circle Office, PGVCL, Bhuj
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
1.1 The "PGVCL" shall mean The Superintending Engineer, Circle Office, Bhuj,
PASCHIM GUJARAT VIJ COMPANY LTD., having its corporate office at Nana
mava Main Road, Laxminagar, Rajkot. With expression shall unless repugnant to
the context include its permitted assigns or successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has
been accepted by the PGVCL for award of the contract and shall include his
authorized representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act
as Engineer-in-Charge to supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with
Performa, schedules and drawings.
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the
bidder that his tender has been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL with
the contractor and shall include the commercial technical and general conditions,
schedules, drawings and any other conditions specifically agreed between the
parties forming a part of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract
1.8 The "Contract Value" shall mean the total amount indicated in the contract
agreement as per order placed by the PGVCL and calculated from the quantities
indicated in the tender.
1.9 The "Completion Period" shall mean the period starting from the date of issue of
"Order" and required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time to
inspect the works under the contract and/or duly authorized representative of the
PGVCL “Letter of Award” shall mean the official notice issued by the PGVCL
notifying the contractor that his bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been
1.13 “Month” shall mean the calendar month day or days unless herein otherwise
expressly defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall mean the continuous period of seven days.
1.15 Definition of “Similar work” for work of spot billing meter reading : work of
spot monthly/Bimonthly billing at site for consumer premises through GPRS men
power to be provided as and when required.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
2.1 Only online submission of all the relevant Documents is allowed. No Offline /
Physical submission is require. Offers in physical form will not be accepted in any
case. Bidder has to upload scanned copies of original (Notarized / self-attested
copies of original - as specified in this tender) with bid. It shall be sole
responsibility of the bidder that the uploaded scanned documents (in PDF form)
remain legible and should not be password protected.
2.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this
2.3 Further bidders are requested to submit price – bid (Schedule – B) on-line only and
not to submit the price bid in physical form. This is mandatory. If price bid is
submitted in physical form, same will not be opened and only on-line submitted
price bid will be considered for evaluation.
2.4 Follow all the instructions narrated this tender document for submission and no
any further communication in the matter will be entertained. The Bidders must
ensure that all the details are completely filled in their tenders and the
information called for is given in totality. A set of complete tender documents is
required to be submitted online with duly signed and stamped by authority
competent to sign on behalf of bidder on each page as a token of unconditional
acceptance to the conditions of various clauses of tender documents. The bidder's
bid and the documents attached there to shall be considered for forming part of
the contract documents.
2.5 Any technical questions, information and clarifications that may be required
pertaining to this enquiry should be referred to the Superintending Engineer,
PGVCL, Circle Office, Near G.K.General Hospital, Bhuj (Kutch)
2.6 PGVCL reserves the right to reject any OR all tenders without assigning any
Reasons thereof.
2.7 The technical scrutiny committee of PGVCL shall evaluate the technical view of
the tender. PGVCL reserves the right to open or not to open the price bid of the
bidders on the basis of their past performance of their services.
2.8 Incomplete bids, amendments and additions to bids after opening of the bids will
be ignored out rightly.
2.9 The price bid of those who are technically qualified shall be opened. After
technical bid is opened, for modification, if any, all shall be given equal chance.
3 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS
3.1 Bidders willing to participate in tender will have to get themselves registered on
website www.tender.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate /
Digital Signature as per Information technology Act 2000 using which they can
sign their electronic bids. Bidders can also procure the same from (n) code
solutions, a division of GNFC Ltd., who are licensed certifying authority by Govt.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
3.3 Download tender Documents from PGVCL web site up to date shown in the
tender document.
3.4 For details regarding digital certificate and related training the below mentioned
address may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev,
3.5 Bidders who already possess valid Digital certificate need not procure a new
digital certificate.
3.6 Bidders can prepare and edit their offers number of times before tender
submission date and time as mentioned in this tender details table no.1. After
tender submission date and time, bidder cannot edit their offer submitted in any
case. No written or online request in this regard shall be granted.
3.7 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in
Electronic format on website www.tender.nprocure.com before the validity
period mentioned in tender details Table.
3.8 Offers submitted without digitally signed will not be accepted.
3.9 Only online submission of all the relevant Documents is allowed. No Offline /
Physical submission is require. Offers in physical form will not be accepted in any
3.10 Following documents are mandatory for the Bidders.
Copy of Tender Document duly signed and stamped on each page.
Attested Copy of successful work Completion of similar type catagory /
Experience certificate.
Attested copy of PAN card in the name of bidder.
Attested copy of GST
Attested copy of document showing P.F. Number obtained by the bidder.
Attested copy of Memorandum of Association or partnership deed. (If
Attested copy of power of attorney if any for signing the bid documents. (If
Attested copy of Latest Three Year’s Income Tax Return with P & L and
Attested copy of Aadhaar Card.
RTGS / NEFT original transaction slip / Screenshot of tender fees should be
uploaded with the bid online.
RTGS / NEFT original transaction slip / Screenshot of EMD should be
uploaded with the bid online.
Solvency certificate (20% of tender amount) issued by scheduled
/nationalized band or RBI dully attested.
Bidder has to upload scanned copies of original (Notarized / self-attested
copies of original - as specified in this tender) with bid. It shall be sole
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
responsibility of the bidder that the uploaded scanned documents (in PDF form)
remain legible and should not be password protected.
Note: Technical bid without any document out of above will be rejected as
well as Disqualify for competition and their’s “Price Bid” will not be opened.
3.11 Conflict of Interest among Bidders/ Agents:-
A bidder shall not have conflict of interest with other bidders for Particular
quoted item. Such conflict of interest can lead to anti-competitive. Practices to
the detriment of procuring Entity’s interests. The bidder found to have a conflict
of interest shall be disqualified. A bidder may be considered to have a conflict of
interest with one or more parties in this bidding process for particular quoted
a) they have proprietor / partner(s) / Director(s) in common; or
b) they receive or have received any direct or indirect subsidy / financial stake
from any of them; or
c) they have the same legal representative / agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third
parties, that puts them in a position to have access to information about or
influence on the bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation
by a bidder in more than one Bid will result in the disqualification of all bids in
which the parties are involved. However, this does not limit the inclusion of
the components / sub-assembly / Assemblies from one bidding manufacturer
in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two manufacturers or
quote on their behalf in a particular tender enquiry. One manufacturer can
also authorize only one agent / dealer. There can be only one bid from the
1. The principal manufacturer directly or through one Indian agent on his
2. Indian/ foreign agent on behalf of only one Principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation
of the design or technical specifications of the contract that is the subject of
h) In case of a holding company having more than one independently
manufacturing units, or more than one unit having common business
ownership/ management, only one unit should quote. Similar restrictions
would apply to closely related sister companies. Bidders must proactively
declare such sister / common business / management units in same / similar
line of business.
i) Bidder shall not act in contravention / violation to the provisions of
competition act, as amended from time to time.
Every bidder should, at the time of submission of bid; give a declaration, that
bidder shall not have conflict of interest with other bidders, as above.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
TENDER SPECIFICATIONS
1) Bidder has to submit their bid online only with all the relevant
Documents. No Offline / Physical submission is require. Offers in
physical form will not be accepted in any case.”
2) The technical scrutiny committee of PGVCL shall evaluate the technical view of
the tender. PGVCL reserves the right to open or not to open the price bid of
the bidders on the basis of their past performance of their services.
Incomplete bids, amendments and additions to bids after opening of the
bids will be ignored out rightly.
The price bid of those who are technically qualified shall be opened. After
technical bid is opened, for modification, if any, all shall be given equal
All the relevant documents as per requirement of the tender also to be
submitted online along with the Tender fee by NEFT/RTGS/UPI on or before
due date and time. All such document should be strictly submitted by online
only. Otherwise the offer will not be considered and no further communication
in the matter will be entertained.
Bank details for payment towards Tender fee/EMD by NEFT/RTGS/UPI
Name PGVCL, Paschim Gujarat Vij Company Limited
IFSC code SBIN0000334
Branch code BHUJ(00334)
4) POST TENDER CORRESPONDENCE / ENQUIRIES:-
Any correspondence or enquiry subsequent to opening of Technical and
Commercial bids is not desirable, if the same is indulged into, it will be
considered for disqualifying the tender. The tenderer will be required to
abstain from pursuing / canvassing the matter, directly or indirectly with any
Officers of PGVCL, as otherwise the same would also amount to disqualification
5) JURIDICTION :
All questions, disputes or differences arising under out of or in connection with
the tender / Contract if concluded shall be subject to the exclusive jurisdiction
of the court under whose jurisdiction the place from which the tender /
acceptance of tender is issued, is situated i.e. Bhuj
8) The tenderers should thoroughly read all the following clauses before
submitting their tender. The original copy of the tender duly signed on every
page, stamped with company’s seal must be submitted along with the bid.
9) Tender Issuing Authority has reserved the rights to accept or reject any tender
without giving any reason
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
10) All prevailing rules of PGVCL regarding works are applicable to vendors which
are not mentioned in this tender copy.
11) If any matter, public dispute arise between PGVCL and Vendor, Vendor is
permitted to represent the matter up to tender issuing authority only and
decision of the tender issuing authority will be final and binding to vendor.
12) OBJECTIVES:
It is proposed to start monthly/bi-monthly spot billing work using GPRS
based PDA (Personal Digital Assistant) with impact blue tooth printers in all
S/dns of Mandvi Division under Bhuj Circle, all logical software for billing, tariff
and exceptional reading detection will be lodged along with consumer past
billing database. GPRS based PDA equipment will print bill on the spot and these
computerized bills will be delivered to consumer at site. All billing data
collected in field will be transferred daily/within 24 hours into PGVCL database
in required format.
Presently, it is proposed to start spot billing system on bi-monthly /
monthly billing basis. On successful completion of two or more billing cycles by
the bidder, PGVCL may offer to convert the billing cycle on monthly basis at the
same rates and terms and conditions (As per actual requirement). The bidder
will be duty bound to accept the same if offered by PGVCL.
07 sub divisions of Mandvi Division for carrying out alternate billing and
the 07 sub divisions of Mandvi Division for carrying out 100% billing through
outsourcing. The above description is of the initial scope of work envisage under
this tender. However, PGVCL reserves the right to increase or decrease the
number of sub divisions where alternate billing to 100 % billing through
outsourcing is required to be carried out which may please be noted and the
same will be binding on the bidder as per the terms and conditions of this
The above description is of the initial scope of work
Qualifying requirement of the bidder:
1. The Bidder should have an experience, with GPRS based PDA of billing work of
metering electrical utility in any Government / reputed PSU having turnover of
atleast Rs. 1000 crores for at least 50,000 consumers per month for 6 months
consistently in F.Y 2023-24 or 2024-25. The bidder has to produce the experience
certificate of satisfactory completion of order from the firm along with copy of the
work order. The bidder should not be black-listed / ceased by any subsidiary
company of GUVNL.
2. The new Bidders ( new to PGVCL ) shall have to give live demo in real time mode
before price bid opening using GPRS in client / Server environments having PGVCL
required functionalities in PGVCL area or other power utility functionality having
near similar scope of PGVCL. The Price bid of only those bidders shall be opened
who will give successful live demo on the above lines to the satisfaction of PGVCL.
3. The new Bidders ( new to PGVCL ) will be required to get the software approved
by the IT department of PGVCL / GUVNL within prescribed time limit given by
PGVCL before opening of the Price bid and this will be required to be done by the
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
bidder within the stipulated time-limit given by PGVCL after opening of Technical
bid. The Price bid of only those bidders shall be opened who will get the software
approved by PGVCL authority.
4. The offer of the Bidders not satisfying the any of the above criteria are likely to be
rejected. The Bidder itself should posses the entire qualifying requirement
mentioned above. The Bidder shall not allow forming consortium to meet the
qualifying requirement. However, in exceptional cases, PGVCL reserves right to
accept / reject the bids from any bidder not satisfying the qualifying requirements
looking to the other credentials of the bidder.
13) SCOPE OF WORK
The scope of work will include following:
I. The spot billing work is to be carried out as per existing route code data available
from PGVCL. If any correction is required, same may be done with the approval of
engineer in-charge of sub-division.
II. During preparation of energy bills in route code, if any new consumer is noticed
without billing records of PGVCL; separate data is to be furnished immediately or
writing in monthly report.
III. The spot billing work is to be completed in scheduled program given by the
concerned Division / sub-division office. No change is permitted without pre-
approval. The bidder will engage manpower to visit all consumers of assigned
area with GPRS based PDA Equipment. The deployment of the man power will be
according to quantum of work and in co-ordination with engineer in charge of the
sub division or the division office.
IV. Representative of the bidder will issue bills created using GPRS based PDA
equipment on the spot after taking the meter reading. Bills will be printed on pre
printed rolls of 55mm width, approximately. The preprinted roll will be provided
by the bidder without any extra charge. All prepared bills must be signed by the
concerned meter reader with his name in rubber stamp.
V. Bill printed by such terminals will be attached to pre-printed bills forms supplied
VI. Representative of bidder will enter all abnormalities found at consumer’s
premises into the system i.e. burnt meter, glass broken, MMB / Meter without
seal / Tilting meter / no meter box at the site and using of power without meter
by consumer. This data should be provided in excel sheet only to sub-division,
Division and Circle office. (Guideline for this is attached herewith as “Annexure-
VII. The bidder is expected to give the reports of following type:
i. Large variation in consumer consumption i.e. more/less than 30% of average
consumption of last three months.
ii. Any form of tampers or irregularities in detail.
iii. Discrepancies in usage, purpose and tariff amendments.
iv. Unbilled consumer’s details.
VIII. All billing data collected through GPRS based PDA terminals during the day will
have to be transferred online into PGVCL billing system.
IX. The bidder is required to submit samples of printouts form by GPRS based PDA
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
terminal along with technical bid.
X. The contract shall be awarded item wise. The period of the contract will be of
one year & PGVCL has right to extend the period of contract for further one year
with same terms and condition in concurrence with Bidder. As well as, also PGVCL
have also right to extend the period of contract for further three months with
same terms and condition without concurrence with bidder, in company interest
work. Similarly PGVCL has right to terminate the contract without showing any
reason with one month notice.
XI. The quantity mentioned in scheduled – C is approximate. The payment will be
made as per actual work carried out.
XII. The software suitable for PDA for meter reading and spot billing etc. will have to
be approved within 20 (Twenty) days from the date of issue of order from I.T.
Department of PGVCL/ GUVNL, with tariff structure. On merit, maximum 10 days
extension will be granted for valid and proper reason. No further extension will
be granted. The decision of PGVCL will be final.
XIII. After printing of pre-printed bill in such agency, the bidder has to collect the bills
and all types of binding works and bill cutting work will have to carry out by the
bidder. The P.G.V.C.L. will be provided only yellow and pink printed cover page.
Paisa 10 (Ten paisa) per bill will be given for reimbursement this work.
XIV. During the work of spot billing your employee should have to wear “IDENTITY
Bids are invited in two parts
(a) Technical Bid - Only online submission.
(b) Price Bid - Only online submission.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
TECHNICAL SPECIFICATION
A. Technical Bid:
1. QUALIFYING REQUIREMENT FROM BIDDER:
I. The bidder should have an experience of such type of metering utility (
Electrical/ Telecommunications / Gas / Water meter reading work) with GPRS
based PDA billing work in any Government / Semi government / reputed
private firm, for at least 50,000 consumers per month/ 1,00,000 consumers in
bi-monthly billing (in a single financial year) for at least one year or more. The
bidder has to produce the experience certificate of satisfactory completion of
order from the firm along with copy of the work order. The experience
certificate must be signed by the order issuing authority or one rank below the
order issuing authority whose orders are enclosed with the tender as supporting
evidence of successful completion of work. The bidder should not be black
listed / ceased by any subsidiary company of G.U.V.N.L.
II. The bidder should have annual turnover of at least Rs.35.00 Lacs in a single
financial year for past two consecutive years.
Further bidders are requested to submit price – bid on-line only and not to
submit the price bid in physical form. This is mandatory. If price bid is
submitted in physical form, same will not be opened and only on-line
submitted price bid will be considered for evaluation. The bidder must clearly
quote their rates in Schedule – B.
TERMS AND CONDITIONS:
The tender should thoroughly read all the following clauses before submitting
their tender. The original copy of the commercial terms and conditions duly
signed, stamped with company’s seal must be submitted along with the bid.
1. PRICE EVALUATION:
No price preference shall be given on any account. All tenders will be evaluated
on firm price end cost basis i.e .Including all taxes, unless otherwise mentioned in
the tender documents. The parties however will have to give the detailed break-
up of the end cost. If more than one party is to be considered for placement of
order, they will have to match their end cost with L-1 end cost, which is
technically acceptable. If PGVCL feels that there is a lack of serious competition
or any other reasons, PGVCL may negotiate with the L-1 party or re-invite the
tender. PGVCL’s decision shall be final and binding on all the parties.
2. VALIDITIES OF THE OFFERS:
The offer will have to be kept valid for a period of 120 days from the date of
opening of the tenderer technical bids. In case of finalization of the tender is
likely to be delayed, will be asked to extend the same without change in the
prices or any terms and condition of the offer. In any change is made, original or
during the extended validity period, the offer will be liable for out rejection
without entering in to further correspondence in this regard and no reference will
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
3. PAYMENT TERMS :
Payment will be done on monthly basis. You will have to submit bill at the end of
a month for work carried out during the month. Bill will be verified and checked
by concern billing staff as per work assigned and approved by Dy. Engineer of
concerned sub-division processed for payment as per procedure of P.G.V.C.Ltd.
Payment will be made within thirty days of receipt of the bill duly certified and
signed by the concerned S/Dn and concerned division office.
Event – Delay in Billing Penalty
Delay in Billing Penalty will be calculated based on assessment of the
consumers for which billing is delayed beyond
two days and calculated by formula as under :
Penalty = 0.01 x Delay in Days x (Assessment of the
consumers affected}
As per example : If consumer billing is delayed by
days and the assessment of the area consumers
is about Rs. 10,00,000/-, the penalty will be as
Penalty = 0.01 x 3 Days x Assessment Rs.1000000/-
Penalty = Rs.30000/-
For any abnormalities/issues in billing agency has to
inform immediately in writing the reasons which
may be responsible for Delay billing from either
side. Concerned AO-R & SE may jointly take
decision in the matter.
Event – irregularities Penalty
Wrong Calculation / Wrong reading Two Times of correct bill
Any irregularities (Incorrect calculation billing amount for any
/ incorrect rate application not to serve the irregularity.
spot billing at the site etc.) observed in bills
issued by a representative / employee will be
treated seriously. In case of such irregularities.
Wrong FLZ, Meter Reading Without Site visit Two Times of correct bill
Any irregularities (Less billing / Bill prepared in amount for any
lock or zero reading without reaching to irregularity.
consumer destination or meter / bill not
prepared at site/ bill is prepared in locked
status / Zero unit without visit of the site etc.)
observed in bills issued by a representative /
Malpractice Penalty of Rs. 3,00,000/-
If any authorized representative /employee of will be levied for each
agency is involved in conniving with the such case as a token of
consumers /indulged in mal-practice of any penalty. The above
kind. penalty is over and above
the losses to the PGVCL if
assessment is not paid by
consumer, which is to be
recovered from the
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
concerned agency and
legal action will be taken.
The person to be engaged / employed by the bidder for billing work should have
knowledge of local language and having experience of carrying out the similar
type of billing work. Further it should be ensured that the person should not be
involved in electricity theft in past. Such persons will have to be produced before
the concerned Billing-in-charge and SDO before engaging them and for approval
of bio-data along with latest passport size color photograph in prescribed
Performa of PGVCL. (The Performa of bio-data is attached herewith as
“Annexure-B”) Approval of concern billing-In-charge and SDO shall be
compulsorily obtained before engaging/employing a person by the party for the
billing work. The bio-data copy will be kept at concerned S/Dn of PGVCL as a
record of employee. The frequent change of employee is to be avoided. The
employee engaged by the bidder should always be with an official I-card issued
by the bidder while on duty & should be attached on his/her shirt in such a way
so that it is easily visible.
During preparation of Energy bills in route code, if any new consumer is noticed
without billing records of PGVCL; separate data is to be furnished immediately. If
data is provided/not provided after 180 days from the connection release date,
total bill amount will be recovered from the bidder.
Not reachable “N” status billing will not be paid any commission & same to be
justified by bidder & if justification is not satisfactory subdivision can deduct the
penalty of Rs. 100/- per bill.
All billing data collected through during preparation of energy bills in route code
GPRS based PDA terminals during the day into PGVCL billing system.
The bidder has to report the different types of observation reports as per scope
of work. Clause no.13 & Annexure-A clause no.19 & 20 to Sub-Division, Division
falling in which Rs.1000/- will be penalized for each cycle.
FIR shall be lodged against bidder for any malpractice found & noticed.
Minimum qualification of the persons engaged in reading work to be HSC pass.
5. POST TENDER CORRESPONDANCE/ENQUIRIES:
Any correspondence or enquiry subsequent to opening of technical and
commercial bids is not desirable, if the same is indulging in to, it will be
considered for disqualifying the tender. The tenderer will be required to abstain
from pursuing / canvassing the matter, directly or indirectly with any officer of
PGVCL, as otherwise the same would also amount to disqualification of the
6. SECURITY DEPOSIT:
(Within 15 days of receipt of intimation of security deposit letter from the Circle
Office, PGVCL, Bhuj, the successful bidder, to whom the work is awarded, shall
be required to furnish a security deposit to respective Circle Office, PGVCL, Bhuj
for an amount equal to 5% (Five percent) of the total contract price towards
faithful performance of the contract in accordance with the terms and conditions
specified therein. The amount will be paid in bank guarantee or online. The bank
guarantee of nationalized bank shall be valid up to 120 days after the completion
of the entire contract work period.
7. IMMEDIATE IMPLEMENTATION OF TARIFF / DATA FORMATE:
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Any changes in the bill, required by officer-in-charge of concerned sub
division/Division/circle/corporate office, like Tariff/Tax/Duty/Fuel charge, detail
format of consumer etc. should be done on priority basis, and on bidder cost.
Delay in billing will be liable for penalty.
8. COMPLIANCE OF LAW:
The successful bidder will certify that he has complied with provision of
industrial & labor Laws including PF Act; ESI Act etc. may be applicable. Party
must produce all relevant documents / records to be asked by PGVCL at any
9. VARIATION IN THE SCOPE OF WORK:
The scope of work can be increased or decreased by 25% during the execution or
otherwise on the prorate basis by the Engineer-in-charge.
10. FORCE MAJEURE:
Force Majuro means any circumstances beyond the human control including:
(a) War and other hostilities, (whether war be declared or not), invasion, act of
foreign enemies, mobilization, requisition or embargo.
(b) Ionizing radiation or contamination by radioactivity from any nuclear fuel or
from any nuclear waste from the combustion of nuclear fuel, radioactive toxic
explosive nuclear assembly or nuclear components thereof.
(c) Rebellion, revolution, insurrection, military or usurped power and civil war;
(d) Riot, commotion or disorder, except where solely restricted to employees of
(e) Neither party shall be considered to be in default nor in breach of his
obligation under the contract to the extent is that performance of such
obligations prevented by any circumstances of force Majuro that arise after
the date of the notification of a ward.
(f) If either party considers that any circumstances of force Majeure have
occurred which may affect performance of his obligations he shall promptly
notify the other party.
(g) Upon the occurrence of any circumstances of force Majeure the bidder shall
endeavor to continue to perform his obligations under the contract so far as
reasonably practicable. The bidder shall notify the Engineer-In-Charge of the
steps he proposes to take, including any reasonable alternative means for
performance, which is not prevented by force Majeure. The bidder shall not
take any such steps unless directed to do so by the Engineer-In-Charge.
(h) If circumstances of force Majeure have occurred and shall continue for a
period of 180 days, notwithstanding, the bidder may be reason thereof,
having granted an extension of time for completion of the works, either party
shall be entitled to serve upon the other, 30 days notice to terminate the
contract. If at the expiry of the period of 30 days force Majeure shall still
continue, the contract shall terminate.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
11. PARTY’S DEFAULT:
(a) If the bidder is not executing the works in accordance with the contract
or is neglecting to perform his obligations, there under, as seriously, to
affect the program for carrying out of the works, the concern authority
who has issued the work order may give notice to the bidder requiring
him to make good such failure or neglected.
(b) If the bidder:
(I) Has failed to comply within a reasonable time.
(ii) Assigns the contract or subcontracts the whole of the works without
the Engineer-In-Charge’s written consent, or
(iii) Becomes bankrupt, insolvent has a receiving order made against him
or compounds with his creditors, or carries on business under a receiver,
trustee or manager for the benefit of his creditors or goes into
(c) The employer shall, as soon as possible after such termination, certify
the Value of the works and all sum then due to bidder as at the date of
(d) The PGVCL in-Charge shall not be liable to make any further payment to
the bidder until the works have been completed. When the works are so
complete, the employer shall be entitled to recover from the bidder the
extra cost, if any, of completing the work allowing for any sum due to
the bidder. If there is no such extra cost the Engineer-In-Charge shall pay
any balance due to the bidder.
(e) The bidder’s liabilities shall immediately cease when the employer
expels him from the site without prejudice to any liabilities there under
that may have already occurred.
(f) The bidder is fails to complete the billing cycle, as schedule given by
PGVCL, for more than 10 days repeatedly (more than three times in a
span of one year) is liable for termination of complete work order by the
Engineer-in-charge and the bidder shall be put in to “No deal with
PGVCL” for period of minimum 18 months from the date of order of no
(g) If the bidder is not able to complete the work order / part of the work
order due to any reason and the work order is forced to close pre-
maturely, the Engineer-in-charge will submit the proposal and
recommend to put the bidder in “No deal with PGVCL” for period of
minimum 36 months from the date of stop dealing order.
12. SETTLEMENT OF DISPUTES:
(a) Any disputes or differences arising out of or in connection with the
contract shall, to the extent possible, settled amicably between the
(b) If any dispute or difference of any kind whatsoever shall arise between
the Employer and the bidder, arising out of the contract for the
performance of the works whether during the progress for the work or
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
after its completion or whether before or after the termination,
abandonment or breach of the contract, it shall, in the first place, be
referred to and settled by the empowered officer to be appointed by the
Employer, who within a period of Thirty (30) days after being requested
by either party to do so, shall give written notice of his decision to the
Employer and the bidder.
(c) Unless as hereinafter provided, such decision in respect of any matter so
Referred shall be final and binding upon the parties until the completion
of the works and shall forthwith be given effect to by the bidder who
shall proceed with the works with all due diligence, whether he or the
Engineer-In-charge required arbitration as hereinafter is provided or not.
(d) If after the empowered officer has given written notice of his decision to
the parties, and no claim to arbitration has been communicated to him
by either party within thirty (30) days from the receipt of such notice,
the said decision shall become final and binding on the parties.
(e) In the event of the empowered officer failing to notify his decision as
aforesaid within thirty (30) days after being requested aforesaid, or in
the event of either the owner or the bidder being dissatisfied with any
such decision, or within thirty (30) days after the expiry of the first
mentioned period of Thirty (30) days, as the case may be, either party
may require that the matter in dispute be referred to arbitration as
hereinafter provided.
(f) All of the above conditions are subject to “Bhuj” jurisdiction only.
The bidder shall insure against liability to third parties for any death or personal
injury and loss of or damage to any physical property including the property of
the Employer other than the works arising out of the performance of the
contract and occurring before the issue of the last defect liability certificate.
Such insurance shall be affected before the bidder begins any work on the site.
PGVCL is not at all responsible for any type of claim of the bidder or his
14. ARBITRATION:
All matters, question, dispute s, differences and / or claims arising out of and /
or concerning and / or in connection and / or in consequences or relating to this
contract whether or not obligation of either of both parties under this contract be
subsisting at the time of such dispute and whether or not this contract has been
terminated or purported to be terminated or completed, shall be referred to the
mutually agreed arbitrator under Indian Arbitration Act 1996. The award of the
arbitrator shall be final and binding on the parties to this contract.
As per company’s rule an agreement on stamp paper of appropriate value is to be
done in the prescribed form within 10 days from the receipt of the order. The
conditions, specifications, price-schedule and contract work booklet are to be
signed by the bidder. The agreement will be done by Executive Engineer of
respective division.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
16. SUBMISSION OF BILLS:
You should have to submit the bills regularly in triplicate along with relevant
documents wherever applicable, to the Executive Engineer, PGVCL, Division
Office, Mandvi, concern through respective of sub-division office. If you are late
or not submitting the bills within time limit, PGVCL is not responsible for late OR
non payment of the bills.
17. TIME LIMIT:
You have to complete the work of meter reading with GPRS based PDA
equipment and spot billing of consumers of various sub-division of Mandvi
Division under Bhuj circle of PGVCL, as per the program given by Dy. Engineer
concerned S/Dn. However, detailed time schedule has to be submitted and
decided in advance in consultation with concern sub-division office before
starting of the work. Every billing cycle should be completed with 10 days
without considering the strength of consumers of respective cycle. The penalty
clause will be applicable as per the clause No.4, if the schedule is not
18. JURISDICTION:
All tenders / offers, dispute or difference arising under, but of, or in connection
with the contract, if concluded, shall be subject to the exclusive jurisdiction of
the court, with in whose jurisdiction the acceptance of tender is issued, i.e. Bhuj
19. CONDITION OF CONTRACT:
All conditions of contract enumerated in Tender Form, Booklet of PGVCL for
works, technical Specification in Tender Set any further terms and condition
mutually agreed upon will form part of this contract.
20. TIME SHEDULE:
The commencement period is given for 30 days in a phased manner, which start
from the date of issue of this order, in which the initial work like recruitment of
staff and training, survey of site, arrangement of office, making list of consumer,
development and approval of the software, testing of hand machine etc. to be
done. All the sub-divisions allotted will be covered within period of 90 days from
the date of issue of order. If bidder is failed to start the work with in specified
commencement period, bidder has to submit written submission with genuine
reason for extension not more then 15 days & if bidder can not start the work in
extended period, the work order will be terminated immediately and bidder has
to pay the penalty and legal action will be taken as per terms of work order. The
initial work order will be given for twelve months after commencement period.
The order can be extended for further twelve month, on the basis of
performance from the field offices or concern Executive Engineer. If the tender
is gone in favor of the present working spot billing agency, he has to start all
spot billing work immediately.
You shall be liable for and shall indemnify PGVCL against all loses, expenses, or
claims arising in connection with the death or injury to any person employed by
you of owner for this work, unless caused by any acts or default of the employ.
You shall be liable for and shall indemnify the contractor against all losses,
expenses or claims arising in connection there with PGVCL are not at all
responsible for any type of claim etc.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
22. LEVY OF GOVERNMENT TAXES:
All the taxes applicable to this order viz. Income Tax; Professional tax, GST etc.
will be recovered from your all bills at such rates as may be prevailing at the
time of passing the bills.
The company reserves the right to carry out meter reading in the event of
emergency or otherwise. Unless otherwise specified, you shall abide by all the
specifications and terms and conditions of the tender documents. None of the
conditions stated in your officer or subsequent letter shall be deemed to be
accepted, unless specifically stated herein.
24. The Superintending Engineer, Bhuj is reserve the rights to reject / accept any
tender without giving any reason.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
ANNEXURE – “ A “
-: Guidelines for the Spot Billing:-
1. After completion of PRT 118, bill print process data to be down loaded from e-
Urja and uploaded data in sub division office’s computer where software is
2. Decide meter-reading program with Spot Billing Agency and cut the bill books
and binding cost will be reimbursed at the rate paid by sub-division office to
binders, however concerned Circle Head may decide and tender competitive
rates from the market for the circle as a whole. The meter readers of Spot
Billing Agency are required to be rotated in same Sub Division office each and
every month. No any area should be repeated for at least last three billings or
actual no of billings in multiple of Meter Readers. It is the Spot Billing Agency’s
responsibility to collect & send the Bill Books on daily basis after the
completion of the Billing.
3. Details of consumers of each book with 119PRT are to be verified jointly (Spot
Billing Agency and sub division).
4. The data in the GPRS based PDA Machine of Billing agency are to be uploaded
from the computer of subdivision only on daily basis.
5. At the time of collecting data and bill books, details of pre arranged power
shutdowns should be inquired and if requires rescheduling of reading for Digital
meters may be arranged jointly with Sub Division office. The details of updated
meter change entry, list of PDC Consumers (with last reading of meter removal)
etc should be collected at the time of collecting data in GPRS based PDA & bill
books daily. If once consumer declared PDC and bill served as PDC on the basis
of list provided by sub-division found repeatedly in next billing i.e. master not
updated as PDC and bill found printed, it has to be informed to the higher
office by Spot Billing Agency.
6. Spot Billing Agency verifies consumer number and staple the bill through GPRS
based PDA calculated bill to the regular bill being served to the consumers.
7. If the meter reading is clearly visible and previous meter status is not “F” then
meter Status “Normal“ should be given and bill should be prepared after
entering the current reading from the meter. Also it should be noted that
the meter identity should be same as in the preprinted bill. (i.e. Meter has
not been changed)
8. If the meter is seen but the reading of the meter is not visible by any means
the Meter Status “F” should be given and bill should be prepared on the basis
of average. Any type of new “F” status in billing should create after consulting
with respective sub division in advance.
9. Incase of the Meter is previously declared Faulty and at the time of billing again
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
the meter found “F” than bill should be prepared based on average.
10. If the meter is in the locked premises then second attempt of meter reading
should be carried out after minimum duration of the One Hour and another on
next day. If on next day premises found locked then the Meter status “L” is
given and there after the bill should be prepared and handed over or / dropped
into the consumer premises. Every working day supervisor of the spot billing
agency should remain present at sub division from 5 P.M. to 6 P.M. in for
solution of consumer grievances.
11. Bills have to be delivered to the consumers/consumer’s representative at the
place of Meter and no delivery of bills to other premises should be done.
12. Sub-division has to prepare/maintained the control register in below mentioned
format on daily basis for the respective cycle.
Bill MR No. Book No No. of bills No. of bills Bill amount No. of Bills
Date received issued to not
consumers prepared
No. of G 41 Records No. of G11 Records Recorded / signed by
Sub Division office &
Spot Billing Agency
13. For tiny issues, one representative of Spot Billing Agency should be provided at
the H.Q.of Sub Division office so that sub division office can communicate with
that representative directly. In spite of request/force etc. from the consumer,
Spot Billing Agency do not have to provide any support to the consumer. The
consumer may be informed to contact concerned sub-division office only. In
the same way, sub division offices will not send any consumer to the Spot
Billing Agency.
14. Spot Billing Agency has no authority to modify / alteration in the Bill prepared
from the Machine. In the same way, the sub-division office should not insist to
the Spot Billing Agency to modify/alter the bill.
15. Hence the sub-division office will rectify the bill and pass the necessary
adjustments if required and deemed fit.
16. It should be advised to Spot Billing Agencies not to change the Meter Status “D”
and “U” and hence billing should be carried out after inputting the same
respectively. This Meter Status has to be changed by the S/Division office.
17. If any Consumers’ Premises not found or Meter Not found in the Premises of the
Consumer during reading cycle then the same should be reported to the
S/Division in the form of “Activity Report” after the completion of the Billing
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
18. In case of open / loose wiring / Short circuited wires near the Meter or in the
path of Meter Reading, the same has to be immediately informed to the
S/Division Office in writing by Spot Billing Agency.
19. The work of Spot billing is limited to taking Meter Reading, preparing of bills
and providing other details as per original order. Also following details are to
be provided in form of activity report in excel sheet.
MMB not found.
MMB Glass broken.
MMB Seal not found.
MMB Seal broken.
Meter Terminal cover not found.
Meter Terminal Cover seal not found.
Meter Glass broken.
Meter Body Seal broken.
Meter Digit not visible.
Meters dial not rotating.
Meter Reading figures upset.
Meter damaged.
Meter on height.
Tariff applied is not proper.
M.D. Overshoot.
Direct supply.
Meter found on site but bill not generated.
Bill generated but Meter not found on site.
20. Route code, Change in Address Line, Meter Number and other details if
required to be corrected. It should be informed to Sub Division office by Spot
Billing Agency in writing for master modification after completion of the Billing
Cycle in form of Input File and if deem fit to Sub Division office, they will
correct the master.
21. For Change in the Spot Billing Guidelines, BHUJ circle office AFFIRMATIVE
CONFIRMATION IS REQUIRED.
22. The Bills of Spot Billing Agencies should be cleared within stipulated period
specified in the order.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
ANNEXURE – “ B “
BIO DATA OF STAFF MEMBER FOR METER READING.
(Minimum educational qualification is 12th pass)
DATE OF BIRTH :
PRESENT ADDRESS :
PERMANENT ADDRESS :
QUALIFICATION :
Encl: The certified copy of the educational & experience certificate.
Signature with seal of employer Signature of Employee.
Signature with seal of
CIRLCE / DIVISION AUTHORITY
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender copy 721-1.pdf
Sch B 721-1.pdf
Download all tender documents and submit your bid