Tender Value
₹13.2 L
EMD Value
₹13,200
Closing Date
18 Jun 2026, 6:05 pm
Executive Engineer, Electric (R&B) Division, Bhuj
Engaging Wireman and H.T. Technician at Smritivan, Bhuj, Dist-Kachchh(For One Year)
310845
1/2026-27
Open
Manpower Supply
Kutch
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER, ELECTRICAL (RandB) DIVISION, BHUJ
₹13,200
3 Jun 2026
3 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
No. less In Figures In Words according
to estimate
1 3 Person Engaging Wireman for day to day Electrical Maintenace work at 217347.72 Rupees Two
Smritivan, Bhuj, On contract basis for 12 Months. (for one Year) Lakh(s) Seventeen
Thousand Three
Hundred Forty
Seven And Paise
Seventy Two Only
2 3 Person Engaging H.T Technician for day to day Electrical Maintenace 221586.08 Rupees Two
and Operation in H.T Sub station at Smritivan, Bhuj, On contract Lakh(s) Twenty
basis for 12 Months. (for one Year) One Thousand
Five Hundred
Eighty Six And
Paise Eight Only
Total Rs.
In Words : Rupees Thirteen Lakh(s) Sixteen Thousand Eight Hundred One And Paise Forty Only
Note : This Estimate has been prepared on the new SOR which is exclusive of GST hence GST additional will be paid to
the agency as per existing guidelines.
I/We am/are willing to carry out the work at ____________% above/below (in Figures)__________________________
percent Above / below (in words) the estimated rates mentioned above amount of my\our tender works out as under :-
Estimated amount put to Tender Rs.
Deduct _____% below Rs.
(-)Less For Dismantle Material Rs.
Net Amount Rs.
(Rupees in Words)____________________________________________________________.
Estimated amount put to Tender Rs.
Add. ________% Above Rs.
(-)Less For Dismantle Material Rs.
Net Amount
(Rupees in Words)____________________________________________________________.
A I/We hereby declare that I/we have visited the site and fully acquainted my self / our selves with the local situation regarding
material,labour and other factors pertaining to the work before submitting this tender.
B I/We hereby declare that I/we carefully studied the conditions of contract, detailed technical specifications and other tender
documents of this work and agree to execute the same accordingly.
C Any Excess in Tender Item/Extra Item if Needs to be Execute. Contractors has to carry out on the instruction of Competant
Authority on Tender Submitted rate, No Excuse will be Accepted. Hence Contactors are Requested to quote the rate
considering this condition.
D Contractors are requested to quote the Tender by considering that payment will be made after availabilty of grant. Contractor
has to start the work immediately after issue of Work Order and as per instruction of Engineer in-Charge irrespective of
availability of grant.
E This Estimate has been prepared on the new SOR which is exclusive of GST hence GST additional will be paid to the agency
as per existing guidelines.
(Signature of the Contractor) Deputy Executive Engineer
Electrical R&B Sub Division
Executive Engineer
Electrical (R&B) Division
Note 1 Please strike out whichever is not applicable.
2 In the case of tendered amount being quoted incorrectly the quoted pered percentage Below/Above will be
considered as final.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD WIREMAN.pdf
Wireman H T Technician Special Condition.pdf
SCHEDULE-B.pdf
Download all tender documents and submit your bid