Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
23 Oct 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, PGVCL, Division Office, Nakhatrana
Labour work for Replacement of fail TC/Augmentation and De-Augmentation of existing TC under Ravapar Sub Division.
355767
745/07
Open
Electrical and Maintenance Works
Works
Kutch
16 documents required · 16 mandatory
₹885
PASCHIM GUJARAT VIJ COMPANY LIMITED
₹10,000
15 Oct 2026
15 Oct 2026
15 Oct 2026
23 Oct 2026
15 Oct 2026
2 Estimated cost in Rs.
3 Tender Fee in Rs. (non-refundable) with 18 % GST
(Payment of Tender Fee must be accepted through on line only by RTGS /
NEFT in PGVCL Bank Account No. 00000031000722038, Name of Bank : State
Bank of India, IFSC Code No. SBIN0011005, Account holder : PASCHIM
GUJARAT VIJ COMPANY LIMITED) (This is mandatory)
4 Earnest Money Deposit amount in Rs. (1 % of Tender Amount)
(Payment of Tender Fee must be accepted through on line only by RTGS /
NEFT in PGVCL Bank Account No. 00000031000722038, Name of Bank : State
Bank of India, IFSC Code No. SBIN0011005, Account holder : PASCHIM
GUJARAT VIJ COMPANY LIMITED) (This is mandatory)
On line (e-tendering) Tender offer download last Date 23/10/2026 up
to 17:00 hours only. (This is mandatory)
6 On line (e-tendering) Tender offer submission last Date 23/10/2026 up
to 18:00 hours only. (This is mandatory)
7 Date & Time for pre bid meeting (If Required) No
8 Only online submission of all the relevant Documents is allowed. No
Offline / Physical submission is require. Offers in physical form will
not be accepted in any case. (This is mandatory)
9 Date of opening of On Line Technical Bid at Date 26/10/2026 @ 11:00
hours (if possible)
10 Date of opening of On Line Price bid, Date 26/10/2026 @ 12:00 hours
11 Validity of Bid 120 Days
DULERA Digitally signed by DULERA
PRAVINBHAI RATILAL
PRAVINBHAI Date: 2026.10.15 15:50:41
RATILAL +05'30'
Executive Engineer
Division Office, PGVCL, Nakhatrana.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Sr. No. Particulars Page No.
1 Tender Details Table No 1
2 SECTION I: INSTRUCTIONS TO THE BIDDER
3 SECTION II: Schedule A
4 General Instructions to the successful
TERMS & CONDITIONS REGARDING
5 INDUSTRIAL LAWS AND OTHER RELATED
6 SECTION V: TAXES
SECTION VI: General Terms &
Annexures I to XI, BG Formats for EMD and,
SD, Agreement and Indemnity Bond
9 SECTION VIII Schedule B
10 SECTION IX Technical Specifications
11 SECTION X ા સફોમર બદલવાનું કામ મેળવનાર કો ા ટરે યાનમાં રાખવાના
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
GENERAL INFORMATIOS FOR BIDDERS
1.1 The "PGVCL" shall mean the Executive Engineer, Nakhatrana Division, PASCHIM GUJARAT VIJ
COMPANY LTD., having its corporate office at Nanamava Main Road, Laxminagar, Rajkot.
With expression shall unless repugnant to the context include its permitted assigns or
successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been
accepted by the PGVCL for award of the contract and shall include his authorized
representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as Engineer-
in-Charge to supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with
Performa, schedules and drawings.
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the bidder that his
tender has been accepted.
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL with the
contractor and shall include the commercial technical and general conditions, schedules,
drawings and any other conditions specifically agreed between the parties forming a part of
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per
order placed by the PGVCL and calculated from the quantities indicated in the tender.
1.9 The "Completion Period" shall mean the period starting from the date of issue of "Order" and
required to complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time to inspect the
works under the contract and/or duly authorized representative of the PGVCL “Letter of
Award” shall mean the official notice issued by the PGVCL notifying the contractor that his
bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been issued.
1.13 “Month” shall mean the calendar month day or days unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension, LT means Low Tension & UG means Under Ground.
1.16 Electricity Rules: - All the works shall be carried out in accordance with latest rules under
Electricity Act-
1.17 Testing: - After completion of work execution required Tests are to be taken in presence of
Engineer in Charge whenever required.
1.18 Definition of “Similar work” means experience of Labour Work for Replacement of Failed /
Healthy / Augmentation / De-augmentation / Damaged / Burnt Transformer.
2 PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.1.1 Only registered vendor in PGVCL shall be entitled for participating in tender
process. Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and
having experience of Labour Work for Replacement of Failed / Healthy /
Augmentation / De-augmentation / Damaged / Burnt Transformer, along with
satisfactory work completion certificate regarding execution of work, including work
order outward number along with its value, from order issuing authority, for last
(three Years) _ ending last day of month previous to the one in which tenders are
invited., of any DISCOM of GUVNL or any Govt. / Private DISCOM of any state of India.
The work executed through open / advertised tender shall only be considered for
experience of work. The work done through limited tender shall not be considered
for experience. These bidders will be considered as an experience bidder.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
2.1.2 Bidders fulfilling eligibility criteria as mentioned in section 1 Clause No.2 and sub
clause No. 2.2and not possessing any experience of Labour Work for Replacement of
Failed / Healthy / Augmentation / De-augmentation / Damaged / Burnt Transformer
can also participate in tender for Labour Work for Replacement of Failed / Healthy /
Augmentation / De-augmentation / Damaged / Burnt Transformer. These bidders
will be considered as an NEW bidder.
2.2 Following documents are mandatory for the Bidders.
Work Completion certificate (by Order Issuing Authority only) with copies of Work
Orders for the similar works executed.
Memorandum of Association or partnership deed.
Document showing P.F. Number obtained by the bidder.
Power of attorney if any for signing the bid documents.
Latest solvency certificate issued by Nationalized or scheduled bank for a sum of
Minimum 20% of Tender cost
Registration Number under Shop and Estt. Act (If as case may be applicable)
PF Code Number allotted by concerned PF Authority
Labour License (If as case may be applicable)
Registration under ESIC (If as case may be applicable)
Vehicle R.C. Book or Vehicle Ovener’s noterised undertaking.
Vehicle insurance policy.
E. P. F. Registration in the name of bidder.
GST Registration Certificate in the name of bidder
PAN card in the name of bidder
Valid Labour Insurance Policy in the name of bidder
Latest bank solvency certificate from any Nationalized/Scheduled bank
Adhar Card (Optional) (In case of Bidding is done on Individual name)
Valid Electrical License of the Contractor
The vendor registration certificate issued form Circle office is to be attached.
Latest Income Tax Return
Bidder has to upload scanned copies of original (Notarized / self-attested copies
of original - as specified in this tender) with bid. It shall be sole responsibility of
the bidder that the uploaded scanned documents (in PDF form) remain legible and
should not be password protected.
2.3 Conflict of Interest among Bidders/ Agents:-
A bidder shall not have conflict of interest with other bidders for Particular quoted item.
Such conflict of interest can lead to anti-competitive. Practices to the detriment of
procuring Entity’s interests. The bidder found to have a conflict of interest shall
bedisqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
a) they have proprietor/partner(s) / Director(s) in common; or
b) they receive or have received any direct or indirect subsidy / financial stake from any of
c) they have the same legal representative / agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that
puts them in a position to have access to information about or influence on the bid of
another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation by a bidder
in more than one Bid will result in the disqualification of all bids in which the parties are
involved. However, this doesnot limit the inclusion of the components / sub-assembly /
Assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their behalf in
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
a particular tender enquiry. One manufacturer can also authorize only one agent/dealer.
There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one Principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that is the subject of the Bid;
h) In case of a holding company having more than one independently manufacturing units, or
more than one unit having common business ownership/ management, only one unit
should quote. Similar restrictions would apply to closely related sister companies. Bidders
must proactively declare such sister / common business / management units in same /
similar line of business.
i) Bidder shall not act in contravention / violation to the provisions of competition act, as
amended from time to time.
Every bidder should, at the time of submission of bid; give adeclaration, that bidder shall not
have conflict of interest with other bidders for particular quoted item, as above.
3 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS
3.1 Bidders willing to participate in tender will have to get themselves registered on
website https://tender.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate / Digital
Signature as per Information technology Act 2000 using which they can sign their
electronic bids. Bidders can also procure the same from (n) code solutions, a division of
GNFC Ltd., who are licensed certifying authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown in the tender
3.3 For details regarding digital certificate and related training the below mentioned
address may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev, Ahmedabad
Toll Free No: 1-800-233-1010 Mob: 9327084190; 9898589652, E-mail: [email protected]
3.4 Bidders who already possess valid Digital certificate need not procure a new digital
3.5 Bidders can prepare and edit their offers number of times before tender submission
date and time as mentioned in this tender details table no1. After tender submission
date and time, bidder cannot edit their offer submitted in any case. No written or
online request in this regard shall be granted.
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic
format on website https://tender.nprocure.com before the validity period mentioned in
tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Only online submission of all the relevant Documents is allowed. No Offline / Physical
submission is require. Offers in physical form will not be accepted in any case.
4 UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND SPECIFICATIONS
4.1 All interested parties are requested to understand this Tender Document in detail in
order to comply with PGVCL’s requirements including but not limited to the Tender
fees, EMD and deadlines, selection criteria, selection methodology, scope of work,
and minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and documents and
fully inform himself as to all the conditions and matters which may in any way affect
the Work or the cost thereof. If any Bidder finds discrepancies or omissions in the
specifications and documents or is in doubt as to the true meaning of any part, he
shall at once request in writing in advance before filling in the tender, within the
time limit as per Table no 1, for an interpretation / clarification by the PGVCL
Nakhatrana Division office. Then The PGVCL Nakhatrana Division office will issue
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
interpretation and clarifications as he may think fit of such interpretations and
clarifications, the Bidder may submit his bid but within the time and date as
specified in the Table no1. All such interpretations and clarifications shall form a
part of the specifications and documents, and accompany the bidder's proposal. In
case of difference of opinion about interpretation of specification etc. the decision
of Executive Engineer, Nakhatrana Division will be final and shall be binding to the
4.3 Verbal clarifications and information given by the PGVCL or his employee(s) or his
representative(s) shall not in any way be binding on the PGVCL.
4.4 All interested parties requested to strictly abide by all terms prescribed in this RFP
Document and provide accurate information to the best of their knowledge without
misleading PGVCL to be considered for participation in this Project.
4.5 Bidders should be in touch with websites https://pgvcl.nprocure.com &
www.pgvcl.com for information regarding revision / corrigendum / Amendment in
the Tender Document till due date of online submission and thereafter. No
separate information shall be sent in this regards and also not publish in
5 TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules in force
during this Tender Period.
5.1 The Tender fees is payable, as per following Table, between the dates & time
mentioned in Table no 1, by online RTGS / NEFT only. The bank detail is as under...
Name of Bank : State Bank of India
Bank Account No.
IFSC Code No. SBIN0011005
Account holder : PASCHIM GUJARAT VIJ COMPANY LIMITED
Tender Fees in Present rate of Total Tender
Sr. No. Tender Amount
Above Rs 5,00,000/- up
Above Rs 10,00,000/- up
Above Rs 25,00,000/- up
5.2 The tender fees once paid for tender document will not be refunded under any
circumstances or not transferred to other bidder.
5.3 The Tender Fees is Non-refundable under Normal Circumstances. However, if
purchaser Company decides to scrap/cancel the Tender, by one or another reason, in
which Bidders are not responsible for cancellation/scarp of Tender fee without GST
amount may be refunded to bidder(s), at sole discretion of the Purchaser Company.
5.4 RTGS / NEFT original transaction slip for tender fees should be uploaded with the bid
6 EARNEST MONEY DEPOSIT (EMD)
6.1 The EMD payable, between the dates & time mentioned in Table no 1, by online RTGS /
NEFT only. The bank detail is as under (The EMD Amount is 1 % of the Tender Estimated
Name of Bank : State Bank of India
Bank Account No.
IFSC Code No. SBIN0011005
Account holder : PASCHIM GUJARAT VIJ COMPANY LIMITED
6.2 RTGS / NEFT transaction slip for EMD should be uploaded with the bid online.
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will be returned
after the award of the contract.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
6.4 EMD of the successful bidder to whom a contract is awarded will be returned after the said
bidder pays the security deposit and signs the contract agreement.
6.5 If the successful bidder fails to submit a Security Deposit within 15 days from the date of
LOA of the contract or fails to sign the contract agreement then the EMD amount will be
forfeited in favour of PGVCL without any notice or and action for “Stop deal” will be
initiated as decided by tender inviting authority
6.6 No interest will be payable by the PGVCL on the above Deposit.
6.7 Tenders submitted without Earnest Money Deposit by the firms will be rejected without
entering in to further correspondence in this regard and no reference will also be made.
7 In case of On line Tenders
7.1 Technical & Commercial Bid cover:
7.1. Following documents are mandatory and to be in submitted through online only along
with the stamp & Sign of bidder. No Offline / Physical submission is require. Offers in
physical form will not be accepted in any case. Bidder has to upload scanned copies of
original (Notarized / self-attested copies of original - as specified in this tender) with
bid. It shall be sole responsibility of the bidder that the uploaded scanned documents
(in PDF form) remain legible and should not be password protected.
1 Attested Copy of successful work Completion certificate, as mentioned on page no
point no 2.11 of this document.
2 Attested copy of Memorandum of Association or partnership deed.
3 Attested copy of document showing P.F. Number obtained by the bidder.
4 Attested copy of power of attorney if any for signing the bid documents.
5 Attested copy of latest solvency certificate issued by Nationalized or scheduled
6 Attested Copy of registration Number under Shop and Estt. Act (If as case may be
7 Copy of PF Code Number allotted by concerned PF Authority
8 Copy of Labour License (If as case may be applicable)
9 Copy of Registration under ESIC (If as case may be applicable)
10 All Annexures of this tender documents, duly signed by the bidder, in chronological
11 Certificate – A
12 Copy of Tender Document duly signed and stamped on each page.
13 Vehicle R.C. Book or Vehicle Ovener’s noterised undertaking.
14 Vehicle insurance policy.
15 The contractor shall have a separate provident fund code of RPFC and the
Contractor who do not possess separate P.F. Code shall not be considered for
acceptance of tender.
16 Contractor has to submit such certificate showing separate P.F. Code along with
17 List of available safety gadgets, as per annexure XI, with the bidder.
18 Copy of documents mentioned in Section 1, Clause No. no 2.2 of this tender.
19 Attested copy of Valid Electrical License of the Contractor
20 Attested copy of vendor registration certificate issued form Circle office.
21 Attested copy of Latest Income Tax Return.
7.2 Commercial / Price Bid:
7.2.1 The bidder must clearly quote their rates in Schedule – B of this tender, in
percentage above than, below than or equal to, the tender rate in figure as well as
in words. The bidder should specify whether the quoted rates are with or without
prevailing taxes, if applicable, in force at that time, The bidder must work out the
total price of their tender offered accordingly and the total amount should be
total price of their tender offered accordingly and the total amount should be
clearly written in words & figure, in case of any discrepancy whatever written in
words shall prevail. Company shall at liberty to decide the matter as it deem fit.
7.2.2 In case of non SOR rate, Item wise rate should be mentioned and item wise rate
will be consider for the lowest party.
7.2.3 Further bidders, for “On line tenders”, are requested to submit price – bid on-
line only and not to submit the price bid in physical form. This is mandatory. If
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
price bid is submitted in physical form, same will not be opened and only on-line
submitted price bid will be considered for evaluation. In On Line price Bid, GST is
to be mentioned in separate raw/Column.
7.2.4 PGVCL reserves the right to reject any OR all tenders without assigning any
reasons thereof.
7.2.5 No deviation in terms & condition in Schedule-B and Technical Specification will be
entertained. All the documents related to this Tender shall be final and binding to
all the bidders. Any ignorance for this shall not relieve the contractor from their
contractual liability arising as per Tender documents.
8. The works referred herein shall cover the entire scope of the Tender.
9. The issuance of bid document would not mean that the bidder has qualified for the
bidding. Hence bidders should ensure themselves of their credentials before submitting
10. Executive Engineer, PGVCL, Nakhatrana Division reserves the right to spread the order if
11. Does not anticipate change in the PGVCL ownership during the proposed period of work.
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned in Table1, PGVCL
may, for any reason, whether at its own initiative or in response to a clarification
requested by a respective bidder, modify the bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & n-procure website in case of on
line tender, PGVCL will bear no responsibility or liability arising out of noncompliance of
the same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders and will be given due
consideration by the bidders while they submit their bids and invariably enclose such
documents as a part of the bid.
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for submission and no any
further communication in the matter will be entertained. The Bidders must ensure that
all the Annexures are completely filled in their tenders and the information called for is
given in totality. A set of complete tender documents is required to be submitted duly
signed and stamped by authority competent to sign on behalf of bidder on each page as
a token of unconditional acceptance to the conditions of various clauses of tender
documents. The bidder's bid and the documents attached there to shall be considered
for forming part of the contract documents.
14.2 For “On Line Tenders”
14.2.1 Tender Papers & Specifications may be down-loaded from Web site
https://pgvcl.nprocure.com (For view, download and on line submission) and
PGVCL web site www.pgvcl.com (For view & down load only).
14.2.2 The bidder has to follow instruction given in this section point no 4 to 7. Only
online submission of all the relevant Documents is allowed. No
Offline / Physical submission is require. Offers in physical form will
not be accepted in any case. Bidder has to upload scanned copies of
original (Notarized / self-attested copies of original - as specified in this
tender) with bid. It shall be sole responsibility of the bidder that the uploaded
scanned documents (in PDF form) remain legible and should not be password
Price bids to be submitted ON LINE only before time limit specified in “Tender
Details” Table no1 of this document.
15.REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions, schedules and
other details called for in this specification and keep himself fully informed about all
which may, in any way, affect the work, or cost thereof. The bidder should sign on
each page of tender documents, as mentioned in Section 1 point no.17, failure to
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
furnish the required information or submission of tender not as per the specification
will be at the Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this tender.
15.3 If any bidders firm or/and partner or proprietary firm anywhere in companies
(PGVCL, UGVCL, MGVCL, GETCO, DGVCL, GSEC) under GUVNL are under criminal
investigation for any kind of fraud for public and theft of material or/and with
handlings the material and any civil and/or criminal case pending at any stage than
offer of such bidder /firm will be out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids online as set out
in the Table no1, shall be rejected.
15.5 Any deviation found in Data/Details/Documents in online offer (e-tendering)
submitted documents of bidder, offer of the same shall be liable for rejection at the
discretion of PGVCL.
15.6 The Bidders shall specifically note that any over writing or corrections or manuscript
in the bid shall be ignored and will not be considered authentic unless same are
signed with Bidder's Stamp/Seal as mentioned in Section 1 point no.
15.7 Conditional bids shall not be accepted.
15.8 DELAYED AND LATE TENDERS:
No tender shall be accepted / opened, as mentioned in the Table no 1, in any
case which are received after due date and time of the receipt of tender
online. Any correspondence in the matter will not be entertained.
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be
accompanied by its translation in English. Failure to comply with this may disqualify a bid. In
the event of any discrepancy in meaning, the English language copy of all documents shall
17. SIGNATURE OF BIDDER
17.1 The bid must contain the name, residence, address and place of business of the
person or persons making the bid and must be signed and sealed by the bidder with
his usual signature. The name of all persons signing should also be typed or printed
below the signature.
17.2 Bids by corporation/ company must be signed with the legal name of the
corporation/ company by the President, Managing Director or by the Secretary or
other person or persons authorized to bid on behalf of such corporation/ company in
17.3 A bid by a person who affixes to his signature the word 'President', 'Managing
Director' 'Secretary', 'or other designation without disclosing his principal will be
17.4 Satisfactory evidence of authority of the person signing on behalf of the Bidder shall
be furnished with the bid.
17.5 The Bidder's name stated on the tender shall be exact legal name of the firm.
17.6 Erasures or other changes in the bid documents shall be over the initials of the
person signing the bid.
17.7 The bidder should sign, as described above, on each page of tender documents &
then they have to upload scanned copies of this tender documents online only.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening of the
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted by each
bidder in his bid for the complete scope of works including all duties and Taxes, will be
evaluated by the PGVCL to ascertain the best and lowest evaluated bid in the interest of
the PGVCL, for the complete works covered under these specifications and documents.
21. ARITHMETICAL ERRORS
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will prevail. If
there is discrepancy between the unit price and the total price which is obtained by
multiplying the unit price and quantity, or between sub-total and the total price, the unit
or sub-total price shall prevail, and the total price shall be corrected. In case of
discrepancy between sub-total price obtained by adding various prices in the schedule and
the sub-total price indicated for that particular schedule, the sub-total obtained by
addition of various arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the prices
arrived at from various schedules, identified for that purposes, in the bid proposal sheets.
If the bidder does not accept the correction of the errors as above, his bid will be
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful bidder
22.2 The contract will be awarded to the best qualified and responsive bidder offering
the lowest evaluated bid in conformity with requirements of these specifications
and documents and PGVCL shall be the sole judge in this regard and subject to
the provisions of these instructions to bidders and other terms and conditions
detailed out in these documents and specifications. A responsive bid is one which
accepts all terms and conditions of these specifications and documents without
any modifications.
22.3 PGVCL Reserves the right to award separate contract to two or more parties in
line with the terms and conditions specified in the specification.
23. ADDITIONAL DOCUMENTS:
At the time of evaluation of tender PGVCL Nakhatrana Division office may ask bidder to
submit required documents other than mentioned in section I Point no 2.2, if required.
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this Tender
consist 365 Days. The commencement date of Order shall be Date of issue of the Order.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
1. Name of the Bidder
2 Postal Address
4 e-mail address & URL
Type of Company
Attach Proof of Company Registration
Proprietorship/ Partnership/ Private
5 along with a copy of the Partnership
Limited/ Public Limited
Deed/ Article of Association and
Memorandum of Understanding
Name and designation of the
representative of the Bidder to whom all
reference shall be made to expedite
technical co-ordination.
7 Office Address
Stores Address where materials issued by
PGVCL will be stored
Store Documents to be submitted
10 Office Telephone/Fax no.
11 Office e-mail address
12 Permanent Account Number(PAN),
15 Labour License No.
Insurance Policy No. and for nos. of
Labours in the name of bidder Nos. of Labours Insured in this
Material Insurance Policy No. and Amount Policy No._______________________
of Sum Insured in the name of bidder Amount of Sum Insured in this policy
18 Solvency Certificate No.
19 Vendor Registration Number
20 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge and belief.
If any information found to be concealed, suppressed or incorrect at later date, our tender shall be
liable to rejected and our company debarred from executing any business with PGVCL.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
1. Replacement of Transformer work to be carried out as per site situation and as per
instructions of Engineer –In-Charge.
2. The Work for the Replacement of Transformer work must be done as per attached
Specifications and Standards.
3. Necessary shutdown for connection with HT line will be provided as per availability or
convenience of the PGVCL which shall be acceptable to the contractor & contractor shall try
to complete the work in minimum time.
4. Successful Bidder must have ensured for that the safety Gadgets are issued to his Labour, by
him, and required regulations of Safety will be followed while carrying out the meter
replacement work.
5. Transportation of labour & Transformer should be done by contractor his own cost.
6. If necessary, order of one Sub Division will be transferred to other Sub Division, depending
upon requirement of PGVCL. You are bound to work any where under Nakhatrana Division as
per instruction of Engineer-in-charge.
7. Replacement of Transformer work to be carried-out immediate as per instructions of Engineer
8. If only one transformer burnt or failed then contractor’s duty that they should replace it.
9. Transformer loading-unloading work from Division Store/TMS section must be done by
contractor his own cost.
10. Rates are to be provided as per the circular No:- KC/Exp/SOR TC replacement/2024/3560,
11. In case of replacement of fail TC second time in a month at same location then approval is
required for fail TC replacement as per circular No:-NO.PGVCL/TECH-2/TRANSFORMER//T-
12. The contractor should have to kept permanently Skilled labours gang in respective Sub-
Division for each annual order. If Concern Engineer-in-charge will report that work is delayed
due to non availability of skilled labour, penalty will be deducted a per rules.
13. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action will be initiated
against the Contractor
14. In case of any Disputes, Superintending Engineer of Concerned area is the final Authority to
take any Decision.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful Bidders
indicating the quantity allocated to them and the security deposit amount to be deposited by
them with PGVCL. Short listed Bidders will be required to deposit the requisite security deposit
within 15 days from issuance of LOI/LOA.
2. Security Deposit:
2.1 Security deposit will be accepted in Cash if the amount is less than Rs. 10000.00 and, if
the amount is more than Rs. 10000.00 thenwill be payable by Demand Draft (DD) OR
Banker’s Cheque OR Bank Guarantee (BG)from Nationalized / Scheduled Banks as per
Govt. GR No. EMD / 10 / 2014 / 570 / DMO dated 01.04.15 will be acceptable. DD should
be drawn on any Nationalized /Scheduled banks in favour of Paschim Gujarat Vij
Company Ltd. payable at Nakhatrana or by Bank guarantee from any
Nationalized/Scheduled nationalized bank decided by Government of Gujarat time to
time only. Cheque will not be acceptable
2.2 The successful Bidders will be required to deposit the requisite security deposit within
days from the date of issuance of LOA of an amount equivalent to 5 % of the value of the
work to be allotted to him and as mentioned in LOA.
2.3 In case, if the Bank Guarantee is furnished / submitted, it should have a clear one time
validity till the completion of awarded work of this work order. Bank Guarantee for
interim period will not be allowed. Security Deposit shall be suitably extended time to
time as per requirement.
2.4 If by any reasons the completion period of this work order is extended, then supplier
should undertake to renew the Bank Guarantee at least one month before the expiry of
the validity failing which PGVCL will be at liberty to encase the same. CORPORATE
GUARANTEES NOT ALLOWED.
2.5 No interest will be paid on the Security Deposit.
2.6 In the event of awarding the order of additional quantity, the successful Bidders will be
required to deposit additional Security Deposit on prorate basis within two weeks of the
issuance of LOA for the additional order quantity.
2.7 In the event of failure to carry out work offered by successful Bidders and as accepted by
them while receiving the order within given time period, will lead to forfeiture of the
Security Deposit up to 100% and will lead to disqualification of the bidder to transaction
business with PGVCL for at least TWO years or the time duration as may be decided by
the Managing Director, PGVCL.
2.8 Security deposit will be returned on after completion of awarded work.
2.9 If the successful Bidders fails to pay security deposit within given time limit then the
letter of intent will stand cancelled. EMD amount will be forfeited in favour of PGVCL
without any notice or and action for “Stop deal” will be initiated as decided by tender
inviting authority.
3. SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt of
LOI/LOA, on Stamp Paper of Rs 300/-as per Company’s rules in the prescribed form of the
P.G.V.C.L. attached with this Tender. The cost Rs.300.00 of the Stamp Paper will have to be
borne by the successful Bidders.
4. For the Tendered work, other than turnkey work,entire material will be issued by PGVCL. Any
other related material required to carry out work mentioned in Schedule A is to be brought by
Bidder. No any extra cost will be paid towards such material.
5. Successful Bidder has to follow all the rules and Regulations of Work Safety. Required tools
and Tackles for Safety are to be arranged by Bidder only.
6. Bidder is responsible to any type theft/damages of Company’s material and also responsible
to any type damages to any property and any kind fatal/non-fatal accidents to anybody during
the execution of work. Insurance of all workers is compulsory, who are involved in Execution
of Tendered work. There will be no any financial liabilities of PGVCL for damage charges paid
such way. Copy of valid Labour Insurance Policy in the name of bidder is to be submitted with
Tender Documents.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
7. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
8. Work must be completed in in specified Schedule narrated in the Tender. If concerned
Engineer not satisfied with quality of work, no any Time limit extension will be granted and
Penalty with applicable GST with cess as applicableand other taxes in force at that time will
be levied on delayed portion of work.
9. Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA. Security
Deposit (In form of DD/BG) and Insurance Policy is also to be submitted with Agreement
within this time limit i.e. 15 (Fifteen) Days.
10. Remaining material is to be credited at Respective Stores of PGVCL within a month after
completion of work.
11. Agreement and Indemnity Bond is to be executed on Rs. 300/- Stamp Paper and cost of stamp
paper is to be borne by Bidder. Solvency Certificate is to be submitted as per PGVCL rules and
Tender Condition.
12. Bidder is solely responsible for the material supplied by PGVCL.
13. Coal and Salt are to be brought by Bidder at his own expenses, for earthing work, and work to
be done as per PGVCL rules and RE specification for this work.
14. Work is to be carried out in presence of PGVCL authorized representative and to be duly
certified also.
15. No idle Labour charges will be paid by the PGVCL in case such occasion of idle Labour arises,
due to want of any materials or any other situations.
16. PGVCL have full rights to accept or reject the offer received against the Tender.
17. Bidder has to submit the Performance Certificates under whom the similar kind of Tender
work has been executed. Such Certificates must not older than 3 Years from Date of
submission of the Bid. Such Certificate must be duly signed by Cadre Executive Engineers
and above only.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS:
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force in India,
including any such laws passed or made or coming into force during the period of the
2. Wages to be paid at the time of payment etc.by the contractor
2.1 The successful bidder shall pay minimum prevailing rates per day, as may be specified here
after, or rates fixed under the Minimum Wages Act, whichever is higher. The wages of every
contract labour employed by him under this contract shall be paid by him before the expiry of
7th day of the month irrespective of which the wages are payable i.e. wages of a last month
have to be paid by him in the first week of the next month). The contractor shall have to
make wages to his workers through bank only. The agency shall have to submit the copy of a
letter given to the Bank advising for crediting wages in individual account of the workmen
along with photocopy of the cheque showing total payment to be made to all such workmen
whose accounts are operated in that branch. (If there is more than one Branch, the agency
will have to submit separately for each branch.)
2.2 The successful bidder shall give his telephone number and address to the company so that in
case of labour trouble etc. the contractor can be contacted. The contractor shall arrange to
have his office outside the factory premises and the contractor shall keep himself present
through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5. Identity cards as prescribed under the factories Act/Shops and establishment Act (As the case
may be applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract labour
(regulation and abolition) Act for employing necessary manpower required by them. In
absence of such license, the contract shall be liable to be terminated without assigning any
reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and keep the
PGVCL indemnified in respect thereof. Some of the major liabilities under various labour and
industrial laws which the Contractor shall comply with below conditions.
7.1 Payment of contribution by way of employer's contribution towards provident fund,
administrative charges etc. at the rates made applicable from time to time by the
Government of India / Government of Gujarat or other statutory authority.
7.2 Payment of deposit in respect of each contract labour at the prevailing rate with the
office of the commissioner of labour as per the Contract Labour (Regulation and
abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and abolition) Act rules
framed there under depending upon the number of workmen.
7.4 Paid leave facility and wages as per the provision of the Factories Act at the rate of one
day for every 20 days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as per
industrial Dispute Act. Any payment to the Contractor's employee arising out of any
claim of disputes under the Industrial Dispute Act 1947 or any other labour Laws.
7.6 Payment of compensation in case of accidental death or injury as per Employee's
compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed or
any government Contractor under any of the provisions of the Minimum wages act,
Payments of wages Act, Employee's compensation Act, Contract Labour regulation
abolition Act, Employee provident fund or any other law due to act of omission of the
Contractor, the PGVCL may make such payment and shall recover the same from the
successful bidder's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such amount as
may be necessary to cause of observe, or for non-observance of the provisions
stipulated in the notifications/byelaws/Acts/Rules/ Regulations/including amendments.
If any, on the part of the Contractor, the PGVCL shall have the right to deduct any
money due to the successful bidder under this contract or any other contract with the
PGVCL including his amount of security deposit for adjusting the payment. The PGVCL
shall also have right to recover from the Contractor any sum required or estimated to
be required for making good the loss or damage suffered by the PGVCL.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation fund and
under the liabilities insurance. The Contractor will arrange insurance policies for arranging
payment to his staff injured / met with accident (Fatal / nonfatal) on duty of sufficient
amount as per Labour laws. In case of any such happening Contractor will be liable for any
other payment to workers / staff engaged as per existing rules. Contractor will not make any
such payment to the Contractor's staff or any compensation etc. during the pendency of the
9. Following Salient features of some major laws are applicable to establishments engaged.
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and conditions of
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition to other
liabilities prescribed under the various labour laws, in force from time to time,
from statutory authorities like GOI-GOG, which the Contractor shall have to comply
10. It should be ensured that before commencing the said work, the successful bidder should
submit the details of their labourer such as a full name, address and age with proof and
subsequently changes of workers details are submitted accordingly.
11. The successful bidder shall employ adequate number of an experienced staff at site for
daily supervision and for maintenance of various register and records required under the
law and contract. No payment for supervision shall be admissible.
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act, Workmen’s
Compensation Act, Insurance Rules etc. or any other act, rules or regulations that have to
be observed by the contractor for carrying out the work.
13. The contract will be governed by the company as per works terms & conditions of the
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No female
worker shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
14.2 Contractor shall maintain a valid labour license under the Contract Labour (Regulation
and abolition) Act for employing necessary manpower required by him. In the absence of
such a license, the contract shall be liable to be terminated without assigning any reason
thereof. Contractor should also employ qualified and experiences persons as per
requirement of Electricity Act and rules for carrying out supply and erection work under
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any Government
agency under any of the provisions of the Minimum Wages Act, Payment of Wages Act,
Employee Compensation Act, Contract Labour Regulation Abolition Act, Employee
Provident Fund or any other law due to act of omission of the Contractor, PGVCL may make
such payment and shall recover the same from the Contractor’s bills.
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of each
concerned employee The contractor's contribution and the workers’ contribution towards
Provident Fund and Family Pension Scheme shall be done at the rate made applicable by
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
the Government from time to time and deposited by the contractor with Regional
Provident Fund Commissioner, Rajkot.
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who are
members of the Provident Fund as the contribution to the Deposit Linked Insurance Scheme
with Regional Provident Fund Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Rajkot at the rates applicable.
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labour shall be provided by the Contractor to his, workers. He shall maintain Leave
Records, Leave Cards for individual labourer which shall be duly verified, approved and
certified by the Authorized Officer of PGVCL. Remuneration for such leave period shall be
fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the performance
of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed
under the Minimum Wages Act. The wages of every Contract Labour employed by him
under this contract shall also be paid by him before the expiry of 7th day from the last day
of the month in respect of which the wages are payable (i.e. wages of a month have to be
paid by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the Contractor shall be
punishable to the extent of Rs. 100/- for each day of default.
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so that, in
case of labour trouble etc. the Contractor can be contacted. The Contractor shall arrange
to have his office within working area and the contractor keep himself present throughout
the working hours.
20.4 The separate P.F. code issued from RPFC is required to be taken by the contractor and if it
is not taken, offer of the firm will not be considered. The attested documentary evidence
to be upload scanned copy along with the offer online only.
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be ensured
that all the contract labourers are covered under the provident fund scheme and
employees’ pension scheme and their contributions are remitted regularly to the
concerned RPFC. The photo copies of the Chelan in this regard should be collected from
the concerned contractor and kept in the file of the concern contractor.
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses
titled Insurance Bidder’s attention is specifically invited to these clauses. Bid price shall
include all the costs in fulfilling all the insurance liabilities under the Contract.
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may
be pertinent to the Works and obligatory in terms of law to protect his interest and interests
of the PGVCL against all perils detailed herein. The form and the limit of such insurance as
defined herein together with the under-writer in each case shall be acceptable to the
PGVCL. However, irrespective of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of Contractor alone.
The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall be
in the name of the Contractor. The Contractor shall, however, be authorized to deal
directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely convertible
22. Any loss or damage to the equipment during handling, transportation, storage, erection,
putting in to satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the Contractor.
The Contractor shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the equipment, damaged or
lost. The transfer of title shall not in any way relieve the Contractor of the above
responsibilities during the period of Contract. The Contractor shall provide the PGVCL
with copy of all insurance policies and documents taken out by him in pursuance of the
Contract. Such copies of documents shall be submitted to the PGVCL immediately after
such insurance coverage.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
The Contractor shall also inform the PGVCL in writing at least sixty (60) days in advance
regarding the expiry/cancellation and/or change in any of such documents and ensure
revalidation, renewal etc., as may be necessary well in time.
23. The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks,
loss or damage in transit, theft, pilferage, earth quake, riot and strikes and malicious
damages, civil commotion, weather conditions, accidents of all kinds, etc. The scope of
such insurance shall be adequate to cover the replacement/reinstatement cost of the
equipment for all risks up to and including delivery of goods and other costs till the
equipment is delivered at Site. The insurance policies to be taken should be on replacement
value basis and/or incorporating escalation clause. Not with standing the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor
shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project requirements.
24. All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the PGVCL may from
time to time, during the pendency of the Contract, ask the Contractor in writing to limit
the insurance coverage, risks and in such a case, the parties to the Contract will agree for
a mutual settlement, for reduction in Contract price to the extent of reduced premium
amount. The Contractor, while arranging the insurance shall ensure to obtain all discounts
on premium which may be available for higher volume or for reason of financing
arrangement of the project.
25. The clause entitled ‘Insurance’ covers the additional insurance requirements for the
portion of the works to be performed at the Site.
26. The successful bidder will not be allowed to work after working hours except in special
27. The successful bidder has to engage required strength of skilled persons for execution of
work and proper supervisor to avoid complication and unnecessary delay to complete work
timely. The successful bidder will be solely responsible for labour claims arising out of the
labour employed for this job.
28. The successful bidder should furnish details of past experience of such job of similar nature
completed by him satisfactorily within the time limit in PGVCL will be preferable.
29. The successful bidder will be abide by and fulfil all the terms and provisions of the “Tender
and contract” for works as applicable and in case of any default there to the PGVCL
Company shall forfeit the S.D. or any other action as may be decided by Executive
Engineer, Nakhatrana Division.
30. The successful bidder will certify that he has complied with the provisions of Industrial
& Labour Laws including PF Act, ESI Act etc. as may be applicable. Copy of challans of
PF related to be submitted along with bill.
31. The successful bidder will governed by the PGVCL general conditions of works contract. The
Booklet will be available in the concerned office in any working days. In the event of
placing order, the successful bidder will be bound to the terms & conditions of the booklet.
All the usual terms and conditions of the Company though the same might have not been
mentioned in this specification or contractor booklet will applicable to this contract, and
the decision of the Executive Engineer, Nakhatrana Division shall be binding on the
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on a given taxable
goods and/or services. The amount and % of GST and Cess as applicable should clearly be indicated
separately. (GST/Cess means all applicable Tax/Cess under GST Laws.
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act, CGST Act,
UTGST Act and SGSCT Act, 2017 and all related ancillary legislations).
3. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and
Cess is not mentioned clearly unless the bidder has opted for Composition Scheme under GST Act,
which should be clearly indicated in the price bid. COMPANY may at its discretion consider such
offer with presumption of highest applicable rate of VAT/GST/Cess prevailing when the price
quoted is inclusive of GST and Cess.
4. If the Contractor has opted for the Composition scheme of GST, the same must be clearly specified
with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of the
Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the
price bid shall be final and any additional GST will have to be borne by the tenderer. In no case
additional amount towards tax or otherwise will be paid / reimbursed to supplier/contractor.
Further Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted
for Composition Scheme under GST.
5. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of
GST (later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over
and above as charged in the invoice shall be borne by the Supplier/Contractor. However, any
refund received by the supplier / contractor on account of GST charged from the company; such
refund shall have to be passed on to the company, along with interest if any. Such refund along
with interest needs to be passed on suo-moto by the contractor.
6. Further, the Company has a right to recover the amount of GST along with penal interest at the
rate of 15% per annum if GST charged is not paid/short paid to the government or fail to upload
the details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within
the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GUVNL’s statutory variation clause shall apply.
7. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of
any other additional item of their inputs / input services under the ambit of the Input Tax
Credit provisions under the GST Act, subsequent to the date of submission of the offer, the
same should be passed on to COMPANY and you should inform such changes to COMPANY from
time to time.PGVCL’s GST Registration No.is 24AADCP1453C1ZZ.
8. TAXES, PERMITS & LICENCES :
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed against
the PGVCL or the Contractor in pursuance of the Contract. In addition the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
9. Income Tax –TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance with the
provision of Income-Tax Laws and to that effect a certificate will be issued to the contractor,
however added as contractor has to submit separate invoice for supply parts item as well as
works part item separately, otherwise TDS will be deducted on entire invoice value.”
10. Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay the same
to the respective Govt. Department. Tax will be deducted as per applicable statutory rules.
11. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS, welfare cess
or any other taxes applicable time to time etc. All other statutory liabilities towards this
contract will be on your part.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
12. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within the contract
period will not be considered except GST. No statutory variation will be given for this work
except GST. However, if any decrease takes place within/after the contractual delivery date,
the advantage will have to be passed on to PGVCL.
13. The Contractor shall be fully responsible for deducting the P.F. of the employees/labour
Working under him as per statutory regulations and depositing the same with the concerned
14. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses,
expenses or claims arising in connection with the death of or injury to any person
employed of the Contractor or his subcontractors for the purposes of the Works.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
GENERAL TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the papers, drawings,
etc. attached & if has any doubt as to the meaning of any portion of any condition /
specification, etc. he shall before signing the contract submit the particulars thereof to
PGVCL in order that such doubts are removed.
1.2 The successful bidder shall not, without the consent in writing of PGVCL, transfer, assign or
sublet the work under this contract or any substantial part thereof to any other party.
1.3 The execution of work should be commenced as per the instruction of the Engineer In
Charge as per actual requirement and should be completed within the time limit
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop the work
altogether or reduce or cut it down. If the work is stopped altogether, the Bidder shall
only be paid for work done. If the work is cut down the Bidder shall not be paid for the
work as so cut down, but in neither case shall be paid any compensation what so ever for
the loss or profit which he might have made if he had been allowed to complete all the
work included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through registered post or
telegram or telex or any other way of communication to the successful bidder at his
specified address shall be deemed to have been delivered to the successful Bidder. The
work shall be carried out by the successful bidder with prior approval of PGVCL. Work
carried out without PGVCL’s approval shall not be accepted and the PGVCL shall have right
to reject it and to recover the cost from the successful bidder. He will be liable against all
losses, expenses or claims arising in connection with the death of or injury to any person
employed by the successful bidder or his subcontractors for the purposes of the Works.
1.6 The successful bidder shall be responsible for any damage to the equipment during transit
due to improper or inadequate packing, handling, loading and unloading. The cases
containing easily damageable material shall be very carefully handled. Adequate
protection must be provided for outdoor storage at site in tropical humid climate,
wherever necessary. The successful bidder without any extra cost shall supply any material
found short inside intact store area.
1.7 If the successful bidder neglects to execute the work with due diligence and expedition or
refuses or neglect to comply with any reasonable orders within two days’ notice given in
writing to the successful bidder and if he fails to comply with the notice, then in such a
case PGVCL shall be at liberty to get the work or any part of it, executed through any
other agency/Bidder in the manner and on the terms it thinks proper. If the cost of
executing the work as aforesaid shall exceed the balance due to the Bidder, and the
Bidder fails to make good the deficiency, PGVCL may recover it from the Bidder in any
1.8 PGVCL shall have at all reasonable time access to the works being carried out by the
Bidder under this contract and stores where material issued by PGVCL is stored. All the
works shall be carried out by the Bidder to the satisfaction of PGVCL.
1.9 The quantities mentioned in the accompanying schedule B are only approximate same may
decrease or increase. The PGVCL reserves the right for revising or omitting any of the
quantities. The actual work executed by the successful bidder will be calculated at the
rate given in the contract schedule of the rates binding to the successful bidder.
1.10 No higher rate or revised rate will be application for the work, if work is held-up/closed
due to whatever so reasons.
1.11 Price shall not be changed subject to any upward/downward revision on any account
whatsoever through the period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be applicable to this
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge and
for execution of the works.
1.14 Either successful bidder or successful bidder’s authorized person should contact our
Engineer In Charge as well as Division Office, Nakhatrana daily for the availability of
materials required for this work, failing to which this work order shall be terminated
without giving any notice.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
1.15 The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of Engineer in
1.16 In case of any dispute doubt, the decision of Executive Engineer Nakhatrana Division shall
be unchallengeable and final, which will be binding to the contractor.
1.17 Security Deposit (without any Interest) will be refunded after completion of guaranteed
1.18 All legal complication of disputes is subject to Nakhatrana jurisdiction only.
1.19 A fresh and valid solvency certificate to the extent of 20% of the ordered value will have to
be produced by the contractor and party has to submit attested copy of solvency certificate
to the company before commencing of work.
1.20 The successful bidder will be solely responsible for any accident/damage either to
equipment or any human being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the work.
1.22 The successful bidder will have to make his own arrangement for required all kinds of tools,
tackles, required for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s bill. The
assessment of which will be done by Engineer In Charge in consultation with division office,
and his sole discretion and his decision shall be binding to the successful bidder and shall be
considered as final and unchallengeable.
1.24 The successful bidder will have to give indemnity bond to PGVCL against any possible claim
of compensation for damage to Contractor’s equipment or staff or any of third parties
during the execution of work as per attached format.
1.25 The successful bidder will have to complete entire work, as mentioned in Schedule-B of
contract awarded to him, as per directive and instruction of Engineer In Charge. If he fails
to do so entire work will be carried out at the risk and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the clock, exclusively
for execution of work.
1.27 Specification in any items mentioned in tender are subject to change without any prior
notice and binding to the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all
relevant Govt. Authorities from the bill.
1.29 If the work is required to be carried out during fix outage then the successful bidder has to
deploy adequate man power, material, tools etc. well in advance and has to complete the
entire work during this specific outage period only, failing to which Company shall be at
liable to deduct the amount of revenue loss due to prolong outage.
1.30 The tender include all minor accessories and items of work which may not have been
specifically mentioned in the specification / Schedule etc. but are essential for completion
of work. The contractor will not be eligible for any extra payment in respect of such
minor accessories and item of work.
1.31 The successful bidder shall not refuse to execute the work order at any time and it will be
his sole responsibility to execute and complete this work as per the instruction of Engineer
1.32 For shortage of any materials issued by the PGVCL for the work, recovery shall be made
from you, on the basis of prices of the materials (prevailing on the date of settlement of
materials account) plus 15% supervision charges.
1.33 The successful bidder has to carry out all the works in accordance with revised and latest
provision under I.E. Rule Act made there under and as per instruction of Engineer In
1.34 All the materials issued by PGVCL shall be transported to the work site on same day and to
be preserved in safe custody failing to which PGVCL shall initiate Police action. Similarly as
per instruction of Engineer In Charge, you have to credit the material at PGVCL store
without any loss of time failing to which PGVCL shall initiate Police action.
1.35 Any delay causing extension of outages shall be successful bidder’s responsibility and
appropriate amount (in term of Rupees) as decided by Executive Engineer, Nakhatrana
Division shall be recovered from successful bidder’s bill as a penalty with applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
1.37 The contractor has to follow all labour laws, safety rules and regulations. The PGVCL does
not take any responsibility in case of accident or injury to the workers. The safety, security
of men, materials and equipment shall be sole responsibility of the contractor.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
1.38 The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and that
of local body is a must condition for the successful bidder.
1.39 The successful bidder shall specifically note that PGVCL will not pay any extra amount
towards any type of claim except for the description indicated in Schedule –A. The party
has to carry out all other additional required activities / work as directed by Engineer In
Charge which is not mentioned in Schedule but required to be completed as per the site
condition and for this work no extra payment shall be made by PGVCL.
1.40 The contractor should employ as a Supervisor with sufficient qualification and experience
who could supervise the execution of work throughout. He should always be present on
1.41 The contractor shall be responsible for breakages, losses and a theft of material during
transit or erection after the materials issued from the stores till the completion of work
and is taken over by the PGVCL.
1.42 As regard damages to the materials, equipment, successful bidder himself will be
responsible. If there is any compensation to be paid in respect of “WORKMAN”
Compensation Act or any other statutory provisions, the same will be paid by contractor
directly. If he thinks fit, he may take necessary insurance covering at his cost.
1.43 The successful bidder shall co-operate with the PGVCL for taking measurement etc. as
early as possible and he shall fulfil the entire requirement which is necessary to finalize
1.44 The competent authority can delete any item in schedule of the tender if he feels that the
rate quoted by the contractor for the item is abnormally high when compared to the
estimated rates.
1.45 The successful bidder shall not refuse to execute this work order at any time and it will be
his sole responsibility to execute and complete this work as per the instruction of Engineer
1.46 The erection work should be carried out according to the specification as per
instructions and programmed laid out by the Engineer in charge. Contractor has to
ensure safe shifting and erection of all accessories/equipment as per standard norms.
1.47 The Bidder shall not display the photograph of the work and shall not take advantage
through publicity of the work without written permission of PGVCL.
1.48 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s
representative shall not relieve the successful bidder from full responsibility of completing
the work confirming to the requirement of this contract.
1.49 Under the Contract, the Contractor shall be responsible for loss or damage to the line and
Electrical Equipment until the successful completion as defined elsewhere in the Bid
1.50 All demurrage, wharf age and other expenses incurred due to delayed clearance of the
material or any other reason shall be to the account of the Contractor.
1.51 The law applicable to the contract shall be the laws in force in India. The courts of Rajkot
shall have exclusive jurisdiction in all matters arising under the contract.
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm price basis
(Inclusive of all Taxes) and lowest evaluated bid in the interest of the PGVCL, for the complete
works covered under these specifications and documents.
If more than one party is to be considered for placement of order, they will have to match their
end cost with end cost of L-1 technically acceptable bidder. PGVCL (tender Inviting Authority)
may go to the L-2, L-3 and so on depending upon the requirement. If PGVCL (tender Inviting
Authority) feels that there is lack of serious competition or any other reasons, PGVCL (tender
Inviting Authority) may negotiate with the L-1 party. PGVCL’s (tender Inviting Authority) decision
shall be final and binding on all the parties.
3 QUANTITY DISTRIBUTION
3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who have
confirmed /fulfilled pre eligibility criteria, as mentioned in Section 1 Sr. No. 2 , will only
be considered for price evaluation. PGVCL will not consider the, price bid of any
contractor who does not confirm / fulfil the eligibility criteria as mentioned in Section
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
3.1.1 While placing the order, the quantity distribution to each new contractors / new
firms shall be restricted up to 30 % of the tender amount/Qty. for all such new
bidders provided the price of New contractor is lower than the
regular/experienced contractor. New contractor / new firm will be considered as
a regular contractor only after full filing experience criteria as mentioned in
Bidders qualifying criteria as per point no. 2 in Section I.
3.1.2 The new contractor will be asked to match the L-1 prices of the new contractor
only and the Regular contractor has to match the L-1 price of the
Regular/experienced contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor is very
high, the above condition no. 2.11 shall be suitably relaxed by PGVCL. L-1 regular
contractor however will get heavy weight age in order placement.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each concerned
Divisions under above locations. The planning for each location has to be prepared in consultation of
the Deputy Engineer of the concerned Sub Division under whose control the work is allocated. The
work must be carried out under Supervision of concerned S/dn Head or Authorized Staff appointed
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any store Centres of
PGVCL jurisdiction and successful bidder has to take delivery from these stores at his own only.
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued Fourth Sub
Work Order only after the submission of Inventory sheet with sketch and material account
statement for any of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to the respective sites
and will be fully responsible for any damage to or loss of all materials at any stage during
transportation or erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe custody of all
the stored materials at his own cost. Material which is to be allotted by PGVCL is to be carted,
loaded and unloaded at Bidder’s cost and risk from PGVCL’s respective Stores. PGVCL must have
access to such Store/s at any time of Day thought the contractual period and Contractor will
cooperate for verification of such store/s and Inventory accounting. Failing to which actions
may be initiated after issuance of required Notice to the Contractor. Store address/s is to be
mentioned in the “General information about the Bidder” under Section I of this Tender.
7.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment and
works from theft, fire pilferage and any other damages and loss. It shall be the responsibility of
the contractor to arrange for security till the works are finally taken over by the PGVCL.
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of
100 % cost of materials, which are required to complete the work. Contractor shall have to take
comprehensive insurance policy equivalent to the Order Value against any loss, damage, theft,
pilferage, fire etc. for the complete period of storage, erection and commissioning up to the time of
taking over by PGVCL. The Contractor shall deal directly and pursue the claim with the Insurance
Company and shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the successful Contractor shall be
furnished to Engineer-In-Charge. In absence of the above insurance policy, R.A. Bill payment will be
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge,
pursue and settle all the claims with the Insurance Company for all items, materials and the PGVCL
shall be kept informed about it. Contractor shall replace the lost / damaged materials / items
promptly irrespective of the settlement of the claims by underwriter and ensure that the work
progress is as per agreed schedule. The loss, if any, such replacement will have to be borne by the
Contractor and PGVCL will not entertain any claim / representation in this regard. However it will be
contractor's responsibility to insure the entire project is taken over by the PGVCL.
8. Account of material issued:
8.1 The successful bidder shall have to maintain accurate day to day item wise account of use
of issued materials which shall be got checked from time to time by the Engineer In Charge
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
of the Company. The contractor will be responsible for custody and preserving the issued
materials till the work is hand over by the contractor after completion.
8.2 The successful bidder has to maintain site register, covering all the daily details of
material receipt and utilization, progress of work etc. This register shall be checked and
signed by Engineer In Charge/Deputy /Executive Engineer, Ravapar/Nakhatrana
Sdn/Division during the site visit as per requirement and exigency of work if deem fit.
8.3 After completion of the work against each Sub Work Order, all the surplus materials issued
by the PGVCL shall be returned by you to the respective divisional /Regional stores only at
contractor’s cost.Such Material Shall not be credited in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to complete the
ordered work within 365 Days from the Date of issue of Work Order.
9.2 Time limit of each sub work order should not be maximum up to 60 Days.
9.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due to
heavy rains or other reasonable causes, such facts should be immediately brought to
notice of the Engineer In Charge. If the reasons for stopping the work are genuine the
Engineer In Charge may ask the successful bidder to start the work again as per condition.
The period of such stoppage will not be considered as a part of working days moreover the
successful bidder cannot claim compensation for such stoppage.
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to Engineer In
Charge and Executive Engineer Nakhatrana. If found that the work is unsatisfactory or not
progressing as per schedule then any action would be taken by the PGVCL as may deemed
fit to see that work is completed at the risk and cost of contractor. The completion time
allowed for each Sub work Order shall be strictly observed.
10. Time limit extension will be given, as per Clause No. 12 of this section, if material is not
supplied in time and in any case of objection not cleared in time. But if materials given in
time and there is no any objection, then no time limit extension will be granted and
penalty with applicable GST with Cess will be imposed as per rules.
11 CHANGE OF QUANTITY:
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or decrease
the quantities of items under the Contract but without any change in unit price or other terms
& conditions. Such variations unless otherwise specified in the accompanying GCC and/or
Technical Specifications, shall not be subjected to any limitation for the individual items but
the total variations in all such items under the Contract shall be limited to the extent of 30%
(Thirty Percent) of the contract price by way of suitable amendment to the contract.
11.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above.
The base unit rates, as identified in the Contract shall however remain constant during the
currency of the Contract, In case the unit rates are not available for the change in quantity,
the same shall be subjected to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the Contractor. Responsibility of
material will be that of the contractor.
12. Penalty with GST:
12.1 Penalty with GST is levied on the time limit of Sub Work Orders. If the work is not
completed within the scheduled period as prescribed in Sub Work Order, penalty with
GST and cess as applicable at the rate of 0.5 % per week or part thereof on delayed
portion subject to maximum up to 10 % of the sub work order Value with GST and cess
as per applicable rate. This will be deducted from the bills payable either against this
contract or any bank guarantee or any other amount payable under any other contract
with the PGVCL. For Penalty calculations or Time limit Extension, following points are to
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on which the
first material is issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by Store In-
charge/Store Keeper must be taken against the particular item by the contractor.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
12.4 In Case of non-availability of Material, contractor must visit the respective store every
fortnight and no stock material details are to be submitted to respective Executive
Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such documents produced
12.6 Time limit Extension must be given as per F & A Letter No. PGVCL/F&A/5083/14-06-2017
and PGVCL/F&A/745/11-06-2018.
12.7 At the time of submission of Bill against SWO, all such Documents are to be submitted by
contractor for waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
13. During the execution of Work, if Contractor/Labour are found violating OR Braking the Safety
rules and Regulations, then Engineer-in-Charge will serve the warning Notice on first
Instance. On second Instance the amount of Fine will be Rs. 500.00 or 0.1 % of amount of
SWO (Whichever is high) with GST and cess. Even If after above two instances, still Contractor
found breaking of Safety Rules and Regulations then Procedures for Stop dealing must be
initiated against him as per rules and regulations.
14. Payment terms shall be as follows:
14.1 Payment will be made against Invoice value and shall be paid against actual execution. The
bills should be submitted in Duplicate to respective Executive Engineer, Nakhatrana Division
Office along with following documents:
• Measurement Report of each site by PGVCL authorized inspection Officer (not below the rank
of Deputy Engineer)
• Material Accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
• Copy of Insurance Policy against the Material equivalent to the Order Value as per
Tender Condition No. No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from the actual
date of completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
14.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise only
final bill shall be paid.
14.3 The time limit for the work may be reduced and contractor should make all his efforts to
complete the work within stipulated time limit as may be given by the Engineer In
Charge depending upon emergency of work.
15. FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties including:
15.1 War and other hostilities, (whether war be declared or not), invasion, act of foreign
enemies, mobilization, requisition or embargo;
15.2 Rebellion, revolution, insurrection, military or usurped power and civil war;
15.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel or from
any nuclear waste from the combustion of nuclear fuel, radioactive toxic explosive,
or other hazardous properties of any explosive nuclear assembly or nuclear
components thereof;
15.4 Riot, commotion or disorder, except where solely restricted to employees of the
15.5 Neither party shall be considered to be in default or in breach of his obligations under
the Contract to the extent is that performance of such obligations prevented by any
circumstances of Force Majeure that arise after the date of the Notification of
15.6 If either party considers that any circumstances of Force Majeure have occurred
which may affect performance of his obligations he shall promptly notify the other
15.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor shall
endeavour to continue to perform his obligations under the Contract so far as
reasonably practicable. The Contractor shall notify the Engineer-in-Charge of the
steps he proposes to take including any reasonable alternative means for
performance, which are not prevented by Force Majeure. The Contractor shall not
take any such steps unless directed so to do by the Engineer-in-Charge.
15.8 If circumstances of Force Majeure have occurred and shall continue for a period of
180 days, notwithstanding, the Contractor may by reason thereof, having been
granted an extension of Time for Completion of the Works, either party shall be
entitled to serve upon the other, 30 days’ notice to terminate the Contract. If at the
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
expiry of the period of 30 days Force Majeure shall continue, the Contract shall
16. TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works
connected with line having been completed correctly as per Indian Electricity Rules &
procedure. Any extra cost involved due to incompleteness of work or bad workmanship
found out subsequently shall be set right with and by you at your own cost.
17. HANDING OVER OF ASSET
17.1 After successful completion of the lines and Transformers or any other electrical
equipment the entire newly created network is to be handed over to the concern
Deputy Engineer of PGVCL. The handing over note covering the details of all the
materials used and total work executed must be signed jointly by the bidder and
PGVCL Engineer. Copy of handing over note must be attached along with bill.
17.2 The contractor shall arrange to hand over the complete work immediately on
completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by contractor
due to non-availability of particular item/material for long period of time and TLE cannot be
approved for that work beyond certain time limit Or such item if not required to be installed
at particular location, then Recovery is to be made as mentioned below for not carrying out
that work from SWO issued for that work.
Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor.
19. CONTRACT QUALITY ASSURANCE:
19.1 The Bidder shall include in his proposal the Quality Assurance Program containing the
overall quality management and procedures which he proposes to follow in the
performance of the Works during various phases as detailed in relevant clause of the
General Technical Conditions.
19.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed
for the execution of the Contract. PGVCL reserve the right to inspect the work at any stage
of contract i.e. during the execution and after the execution of work.
19.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items (if
any) are being supplied. Such details shall be accompanied by their list of previous supplies
made performance reports etc. However, in case of orders are placed, specific approval
shall be obtained from the PGVCL for the vendor supplied materials. The quality assurance
program shall be furnished for each material separately for approval.
20. TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
20.1 In case of any type of misappropriations, cheating or intention of cheating, frauds,
irregularities, malpractice, etc. the Managing Director PGVCL reserves the right to cancel
the order without giving reasons thereof and forfeit the security deposit.
20.2 The PGVCL reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the Contractor of
his decision to do so.
20.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall discontinue
the work on the date and to the extent specified in the notice, make all reasonable efforts
to obtain cancellation of all orders and Contracts to the extent they are related to the
work terminated and terms satisfactory to the PGVCL, stop all further sub-contracting or
purchasing activity related to the work terminated, and assist PGVCL in maintenance,
protection, and disposition of the works acquired under the Contract by the PGVCL. In the
event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
20.4 If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners dies
then unless the PGVCL is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of partnership, the
surviving partners, are capable of carrying out and completing the Contract the PGVCL
shall be entitled to cancel the Contract as to its in completed part without being in any
way liable to payment of any compensation to the estate of deceased Contractor and/or
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
to the surviving partners of the Contractor’s firm on account of the cancellation of the
Contract. The decision of the PGVCL that the legal representatives of the deceased
Contractor or surviving partners of the Contractor’s firm cannot carry out and complete
the Contract shall be final and binding on the parties. In the event of such cancellation the
PGVCL shall not hold the estate of the deceased Contractor and/or the surviving partners
of the estate of the deceased Contractor and/or the surviving partners of the Contractor’s
firm liable to damages for not completing the Contract.
21. ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder, in
connection with this agreement except as to matters, the decision for which has been
specifically provided, either party may forthwith give to the other notice in writing of
existence of such questions, dispute, difference and the same shall be referred to the sole
arbitration of a person nominated by Managing Director, PGVCL. This reference shall be
governed by Indian Arbitration Act prevailing at the time of dispute and the rules made
there under. The award in such arbitration shall be final and binding on all the parties.
Work under the agreement shall continue during the arbitration proceedings unless the
PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents forming
part of the enquiry or Contract are property of PGVCL and shall not be used for any other
purpose, except for the execution of the contract. All rights related to the technical
specifications, drawings and records are reserved by PGVCL only and no part or partial
should be reproduced, copied or alter without prior permission to PGVCL in writing. In the
event of the breach of this provision, PGVCL can claim the damages caused by such events.
23. Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
23.1 Has submitted fake, false or forged documents/certificates
23.2 Has revised/withdrawn price bid after opening of Techno: commercial bid,
until and unless it is sought for
23.3 Has refused to accept Letter of Acceptance/Purchase Order/Work Order
after the same is issued by the Company within the validity period and as
per agreed terms and conditions
23.4 Has committed breach of contract or has failed to perform a contract or
has abandoned the contract
23.5 Has failed to provide suitable expertise for the work as per prescheduled
23.6 Has failed to submit all the necessary Test reports/documents within time
schedule / as per Company's time limit, as mentioned in the LOA, if the
Letter of Acceptance (LOA) is placed subject to submission of type reports
/ documents to the firm.
23.7 Has indulged in construction and erection of defective works.
23.8 Has substituted materials In lieu of materials supplied by the Company or
has not returned or has short returned or has unauthorised disposed of
materials/ documents/ drawings/ tools or plants or equipment supplied by
23.9 Has involved in malpractices such as bribery, corruption, fraud, canvassing
23.10 Has unauthorised obtained official company information or copies of
documents, in relation to the Tender/Contract
23.11 Has failed to follow the stipulated mode of communication, if specified by
the tendering authority/ purchaser.
23.12 Any other ground for which in the opinion of the Company makes it
undesirable to deal with the Firm, and
23.13 In case the State Government directs the Company to place a firm in stop
dealing/ banned for business dealing/ blacklisting
23.14 The firm, stop deal and/or banned for business dealing and/ or blacklist
by GUVNL or any subsidiary Companies of GUVNL shall be considered as a
stop deal and/ or banned for business dealing and/ or blacklisting for all
24. Effect of putting a proprietor/firm for Stop dealing/Banned forbusiness dealing are
24.1 The proprietor/all the partners/directors of the stop deal/ banned for business
dealing/ blacklisting firm shall also be considered for stop deal/ banned for
business dealing.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
24.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm
appears in the list of Stop dealing / Banned for business dealing in any Company
of GUVNL and its Subsidiary Companies,
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid submitted by
the Firm shall be returned.
24.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm
is put on Stop dealing/ Banned for business dealing by GUVNL or any of its
subsidiary Companies, during tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will be
treated as “Disqualified Bid” and automatically stand as “Rejected Bid” at
the time of scrutiny of Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price bid, the price bid
of the Firm should not be opened and the bid submitted by the Firm will be
treated as “Disqualified Bid” and automatically stand as “Rejected Bid” at
the time of scrutiny of Technical Bid.
(iii) After opening of price bid, the offer of the Firm should be ignored and will
not be further evaluated. The Firm will not be considered for issue of order
even if its price is the lowest. In this situation, the next lowest bidder shall
be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should be returned after
obtaining confirmation from GUVNL and its other subsidiary Companies that
there are no outstanding dues recoverable from the firm.
24.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and
is already executing work and/ or Letter of Acceptance/ purchase order awarded
to them by another Company, then the firm should be allowed to complete such
awarded work / supply.
24.5 The amount of EMD/SD/ any payment against supply withheld at the instance of
GUVNL or any of its subsidiary Companies shall be appropriated against the dues
recoverable from the firm by GUVNL or any of its subsidiary Companies. EMD/ SD/
PG in the form of bank Guarantee shall be encashed and appropriated.
24.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a
Firm is put on Stop dealing/ Banned for business dealing, all the manufacturing
works of the Firm shall be on Stop dealing / Banned for business dealing for
GUVNL and its Subsidiary Companies & for all Services of the Firm.
24.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary
Concern, then all the Concerns of the same Proprietor shall also be considered to
be on Stop Dealing/ Banned for business dealing.
24.8 The Board of Directors of the concerned Company may however, if he considers it
to be in the interest of the Company, remove the ban in respect of any specific
Service from any Contractor for that Company only.
25. Every bidder should, at the time of submission of bid, give a declaration as per Annexure
VI attached with this Tender, that bidder and/or proprietor/ partner/ director of the firm
has not been placed on Stop dealing / Banned for business dealing / blacklisting by GUVNL
and it’s any Subsidiary Companies.
26. JURISDICTION:
All questions, disputes, or differences arising under out of or in connection with
Tender/Contract if concluded shall subject to the exclusive jurisdiction of the Court under
whose jurisdiction the place from which Tender/Acceptance if Tender is issued, is situated
i.e. respective Location’s Court.
27. The Non SOR circulated by Bhuj Circle office vide no:- KC/Exp/SOR TC
replacement/2024/3560, DATED:-05/09/2024 is to be incorporate in tender.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Sr. Time required for work
No. Mentioned in Tender
1 Labour work for Replacement of fail
TC/Augmentation and De-Augmentation of
exisiting TC under Ravapar Sub Division.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Details of work experience in last three years
(To be completely filled by the Bidder)
Sr. full address, Details of order
Work Description date of Order
No. phone, fax and
the order Value
name of contact
• Copies of MAJOR Work orders along with Work completion certificates should be
attached with this information.
• If necessary, separate sheet may be used to submit the information
Tender for Labour work for Replacement of fail TC/Augmentation and De-Augmentation
of exisiting TC under Ravapar Sub Division.
Tender No: 745/07
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Reason for non-
Company with Ref. &
Work completion with
Sr. full address, Work date of
Order Certification of
No. phone, fax and Description the
Value Order issuing
name of contact order
• Copies of Resumes and appropriate certifications should be attached with this
• If necessary, separate sheet may be used to submit the information.
Tender for Labour work for Replacement of fail TC/Augmentation and De-Augmentation
of exisiting TC under Ravapar Sub Division.
Tender No: 745/07
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. _______________________________________, employee
of PGVCL at _____________________________ (place), is related to our
(designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any
relatives employed or working with Paschim Gujarat VijCo.Ltd.at any of its offices or its
parent Department i.e. Energy & Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly
specified below in this sheet. If there are no deviations offered, it should be clearly
mentioned on this page.
Deviation offered to
Chapter No, Clause No. of Deviation offered
the tender document
Deviation offered
Tender for Labour work for Replacement of fail TC/Augmentation and De-Augmentation
of exisiting TC under Ravapar Sub Division.
Tender No: 745/07
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
Ref: - Tender No: 745/07
All bidders will have to furnish the following undertaking duly filled in signed and
stamped for each quoted item of the tender along with the Technical Bid.
and their proprietor / any partner / any directors of the firm is not stop deal and/or
black listed by GUVNL and or their any subsidiary companies viz. PGVCL / UGVCL /
DGVCL / MGVCL / GSECL / GETCO for the tendered item.
Seal & Signature of the Tenderer/Firm
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
List of Performance Certificate:
Sr. Name of the Authority by Reference No. &
Details of items
No. whom certificate is issued Date
Tender for Labour work for Replacement of fail TC/Augmentation and De-Augmentation
of exisiting TC under Ravapar Sub Division.
Tender No: 745/07
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last
Sr. Type Of Accident Brief Reason for
Fatal/Nonfatal Affected
No. (Electrical/Mechanical) the Accident
Tender for Labour work for Replacement of fail TC/Augmentation and De-Augmentation
of exisiting TC under Ravapar Sub Division.
Tender No: 745/07
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Sub: -UNDERTAKING IN REGARD TO ANY PENDING CRIMINAL CASE FOR FRAUD OR
MISHANDALING OF MATERIAL
Ref: - Tender No: 745/07
signatory of M/s_____________________________________________ hereby declare
that none of the Proprietors / Partners / Directors is not under any criminal
investigation for any kind of fraud for theft of material or/and with handlings the
material and any civil and/or criminal case pending for such matter listed by GUVNL
and or any subsidiary companies viz. PGVCL/UGVCL/DGVCL/MGVCL/GSECL/GETCO
for the tendered items and/or works.
Seal of the Firm Signature of the Tenderer with Designation
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
List of Safety Gadgets Owned by Bidder
Ref: - Tender No: 745/07
hereby declare we will provide ________ nos of labours to carry out this tenders
scope of work. We are having Labour Insurance Policy
our labours. We declare that, as mention below table, we are having following safety
gadgets of our own and they all are in good condition.
List of Safety Gadget Unit owned by
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
On Firm’s Letter Head
CERTIFICATE – “A”
with other firms who have submitted tenders for the same items under this inquiry /
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: 745/07
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.300/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having
their registered office at _____________________________________ (Address of the firms
Registered office) (hereinafter called the ‘Tenderer’) wish to participate in the tender No.
Erection/Supply & Erection Work) (Name of the material/equipment/Work) for
_________________________ Paschim Gujarat Vij Company Ltd. and WHEREAS a Bank Guarantee
for (hereinafter called the “Beneficiary”) Rs._____________ (Amount of EMD) valid till _________
(Mention here date of validity of this Guarantee which will be 5 (FIVE) months beyond initial
validity of Tender’s offer) which is required to be submitted by the tenderer along with the
We, __________________ (Name of the Bank and address of the Branch giving the Bank Guarantee)
having our registered office at ______________________ (Address of Bank’s registered office)
hereby give this Bank Guarantee No.________________ dated _________ and hereby agree
unequivocally and Unconditionally to pay immediately on demand in writing from the Paschim
Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any amount not exceeding
to the said Paschim Gujarat Vij Company Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender or
part thereof by the Tenderer within its validity or Non submission of Security Deposit by the
Tenderer within one month from the date tender or a part thereof has been accepted by the
Paschim Gujarat Vij Company Ltd. would constitute a default on the part of the Tenderer and that
this Bank Guarantee is liable to be invoked and encashed within its validity by the Beneficiary in
case of any occurrence of a default on the part of the Tenderer and that the encashed amount is
liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
____________________ (Mention here the date of validity of Bank) and shall not be terminable by
notice or by Guarantor change in the constitution of the Bank or the firm of Tenderer Or by any
reason whatsoever and our liability hereunder shall not be impaired or discharged by any extension
of time or variations or alternations made, given, conceded with or without our knowledge or
consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is
restricted to Rs. __________ (Amt. of E.M.D.) (Rupees ____________________________________)
(In words). Our Guarantee shall remain in force till _________ (Date of validity of the Guarantee).
Unless demands or claims under this Bank Guarantee are made to us in writing on or before_______
(Date of Validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be
forfeited and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Address Signature of the Bank’s Authorized Signatory
of the Bank with Branch Code, Telephone and with
Fax Nos. Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are
(i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .300/-)
We, Bank of ___________________________________ hereby agree unequivocally and
unconditionally to pay immediately on demand in writing from the Paschim Gujarat Vij Company
Ltd. or any Officer authorized by it in this behalf any amount up to and not exceeding _______ (in
words) Rupees ___________________ to the said Paschim Gujarat Vij Company Ltd. on behalf of
M/s. _________________________________________________who have entered into a contract for
the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of ______________ and
shall not be terminable by notice or by change in the constitution of the Bank or the firm of
Contractors / Suppliers or by any other reasons whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given conceded
or agreed, with or without our knowledge or consent, by or between parties to the said within
written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or
Subsidiaries). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs.___________ (Rupees ___________________________ only). Our guarantee shall
remain in force until ____________________ (Date of validity of the Guarantee). Unless demands
or claims under this Bank Guarantee are made to us in writing on or before_______ (Date of
validity of the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited
and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Address Signature of the
of the Bank with Branch Code, Telephone and Bank’s Authorized Signatory with Official
Fax Nos. Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which
are (i) Axis Bank (ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of
Note: The Banks shall be the Banks recognized / notified by the Finance Department,
Government of Gujarat (GoG) from time to time.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
This agreement is made at ___________the ___day of______month _______Year between the
Paschim Gujarat Vij Company Ltd. &__________________________ (hereinafter referred to as
“the Contractor “which expression shall unless excluded by or repugnant to the context included
its successors or permit assigns) of the one part and the Paschim Gujarat Vij Company Ltd. Having
its Regd. and Corporate Office at Laxminagar, Off Nanamava Road, Rajkot, 360004 (hereinafter
called “The Company” which expression shall unless excluded by or repugnant of the context
include its successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work
No. ____________________, Dated ___________, hereinafter called “The works and more
particularly desorbed enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The
Superintending Engineer/Executive Engineer,, Circle/Division, PGVCL on behalf of the Company,
a list where of is made out in the schedule here under written and all of which said documents are
deemed to form part of this contract and include in the expression “The works “wherever herein
used, upon the terms and subject to the conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance &
Erection of HT / LT Line & T/C and Underground cable up on the terms and subject to the
conditions herein mentioned.
1.) The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein of therefore respectively or are reasonable
necessary for the completion of the works as mentioned and at the time in the manner and
subject to the terms conditions and stipulation contained in this contract and in
consideration of the due provision, executions, construction and completion of the works
agreed to by the contractors as aforesaid the company both hereby covenant with the
contractor to pay all the claims of money as and when they become due and payable to the
contractor under the provisions of the contract such payment to be made at such times in
such manner as is provided by the contract.
2.) The conditions and covenant stipulation here in before in this contract are subject to and
without prejudice to the right of the company to enforce for delay and or any other rights
whatever including the right to reject and cancel on default or breach by the contract of
the conditions and the covenant as stipulated in the general conditions specifications form
Or tender schedule drawing etc. attached with the Company LOA No.
3.) The Contractor will strictly follow the safety Rules and Regulations during the execution of
aforesaid work. The Contractor will also provide all required Safety Gadgets to his
Supervisors and labours to execute the work mentioned in Tender. On violating or breaking
the Safety Rules and Regulations, and if Supervisors/Labours are found without Safety
Gadgets, “The Company” reserves the right to take actions as per the terms and conditions
mentioned in Tender without any prejudice.
4.) The Company reserves the right to terminate the Contract either in part or in full due to
reasons other than those mentioned under clause entitled ‘Contractor’s Default’. The
PGVCL shall in such an event give fifteen (15) days’ notice in writing to the Contractor of
his decision to do so.
5.) The Contractor upon receipt of such notice shall discontinue the work on the date and to
the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Company, stop all further sub-contracting or purchasing activity related
to the work terminated, and assist “The Company” in maintenance, protection, and
disposition of the works acquired under the Contract by the Company. In the event of such
a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
6.) If the Contractor is an individual or a proprietary concern and the individual or the
proprietor dies and if the Contractor is a partnership concern and one of the partners dies
then unless “the Company” is satisfied that the legal representatives of the individual
Contractor or of the proprietor of the propriety concern and in the case of partnership, the
surviving partners, are capable of carrying out and completing the Contract “the Company”
shall be entitled to cancel the Contract as to its in completed part without being in any
way liable to payment of any compensation to the estate of deceased Contractor and/or
to the surviving partners of the Contractor’s firm on account of the cancellation of the
Contract. The decision of the Company that the legal representatives of the deceased
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Contractor or surviving partners of the Contractor’s firm cannot carry out and complete
the Contract shall be final and binding on the parties. In the event of such cancellation the
Company shall not hold the estate of the deceased Contractor and/or the surviving
partners of the estate of the deceased Contractor and/or the surviving partners of the
Contractor’s firm liable to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may be
altered by mutual agreement and if so altered shall not be deemed or constructed to mean and to
effect or alter other terms and conditions of the contract and the contract so altered or revised
shall be and shall always be deemed to have been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the
COMPANY having given contract for the work of _________________________________
No. __________________________, dated _______________ and all future contract that may
be awarded to me in the next one year and in terms of the condition in clause 1.24 of Section VI of
the COMPANY’s tender and contract for work.
I _______________________________ residing at ____________ by this Bond bind myself
responsible for and shall pay compensation to my workmen payable under the workmen’s
compensation ACT – 1923 (viii of 1923) hereinafter called the said Act for death or injuries caused
to the workmen engaged by this presents, if such compensation is paid by the COMPANY as
principal under such sub-section (1) of section 12 of the said Act on behalf of me, to pay such
amount of compensation on demand within 48 hours to the COMPANY that it might have to spend
as legal and other incidental charges in defending any suit or action arising out of the death of
injuries in regard to compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death
or injuries to the workmen engaged by me. During the execution of work of said contract and all
future contracts that may be awarded to me in the next one year is filed by the worker against the
COMPANY, I __________________________________ shall imbrues to the COMPANY such sum that
the COMPANY is required to spend as legal and other incidental charges in defending such suit or
action and also the amount that may be ordered to be paid to the worker / or his heirs as
compensation and that the above written bind shall remain in full force and virtue till the
COMPANY is required to defend such suit or action filed by the workers and or heirs against the
COMPANY. Further it is applicable on death of contractor himself also. No any compensation will
be claimed by legal heirs of contractor.
Signature of the Executant
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Labour Rates for Replacement of Transformer Work (Excluding of GST) as per the circular No:-
No.KC/Exp/SOR TC replacement/2024/3560, DATED:-05/09/2024.
(All Rates are with labour & transportation charges)
Sr. No. Item Unit with
1 Replacement of failed / healthy / aug-deaugmentation / Damaged / burnt all capacity
(5/10/16/25/63/100/200 KVA) Transformer with transportation, labour charges & Credit of
failed Transformer at Division Office Store/TMS Section, Nakhatrana.
1.a --do-- with To & Fro 0 to 25 Kilometer No.
1.b --do-- with To & Fro 26 to 50 Kilometer No.
1.c --do-- with To & Fro 51 to 75 Kilometer No.
1.d --do-- with To & Fro 76 to 100 Kilometer No.
1.e --do-- with To & Fro 101 to 150 Kilometer No.
1.f --do-- with To & Fro 151 to 200 Kilometer No.
1.g --do-- with To & Fro Above 200 Kilometer No.
Total Estimated Tender Cost Rs.
In Word (Rupees Nine Lakh Ninety Seven Thousand Seven Hundred only.)
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For Labour work for Replacement of fail
TC/Augmentation and De-Augmentation of exisiting TC under Ravapar Sub Division.
The work should be strictly as per specifications and approved designs of the PGVCL. The inferior and
unsatisfactory work is liable for rejection and to be rectified at the cost of contractor. The work will have to
be carried out as per programmed laid down by department and under the entire instruction of engineer-in-
Charge and contractor should employ supervisor who could supervise the works through out and he should
remain present on site. No tools & Tackles will be supplied by the department.
1) Replacement of Transformer work must be done as per standard with all type of required wiring,
2) Replacement of Transformer work carried out in area of Nakhatrana Division or more specific within
Ravapar Sub Division area as per instructions of Engineer–In-Charge.
3) Replacement of Transformer work must be done as per instructions of Engineer–In-Charge and in the
presence of responsible line staff.
4) New transformer issue from Store/TMS section & Replaced transformer must be credit at Store/TMS
section by contractor’s own vehicle.
5) Fail TC must be credited in TMS/Store section as early as possible or within 5 working day after
replacement. If it is delayed than specified time duration then Rs.100 is charged for per day and
after 5 days Rs.500 is charged per day.
6) Certificate of credited TC in TMS section is to be provided by JE TMS at time of submission of bill at
Division office.
7) After informed by Engineer–In-Charge if you fail to replace transformer then work done by other
agency at your risk & amount of this work recover from your bill.
8) The vehicle used for this work must be insured and good’s permit of RTO office required. Vehicle
must be on contractor’s name. If vehicle is hired by contractor from third party then noterised
undertaking of party must required. This vehicle’s number must be mentioned In every Gate pass.
9) If new transformer receive from Store/TMS section for replacement work and old transformer not
credited in Store/TMS section then 50% amount cut from bill.
10) If transformer receive from Store/TMS section for replacement work and this transformer use for
release of new connection then 50% amount cut from bill.
11) Following details should be fill up by contractor while submitting the bill of Transformer
19.1 Consumer Name & Consumer Number.
19.2 Consumer’s Address.
19.3 Mobile No. of consumers or Consumer’s representative.
19.4 Feeder Name
19.5 Village Name / Supervisor Name.
19.6 M.R., C.R. Number & Date
19.7 New and Old Transformer’s KVA.
19.8 New and Old Transformer’s Serial Number.
19.9 Total K.M. of TMS/Store to Village & back.
19.10 Oil shortage in Litre.
Before starting the work (new, alteration or addition) and during the works the contractor must obtain line
clear wherever necessary for the concerned officer of this office of other Office. For any damage done to the
Men, Materials and/or property due to non-observance of rules, the contractor will be solely responsible.
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Signature of Tenderer :-
Company’s Round Seal
Date :- Place :-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 873830.pdf
Shedule-B 873830.pdf
NEW TERMS 873830.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .