Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹3,141
Closing Date
1 Sept 2026, 3:00 pm5d left
GM(COM)
WEBEL BHAVAN
NIT
2026_WEBEL_1037222_1
WEBEL/ EOT/W/26-27/000065 (RE-TENDER 2ND CALL)
Open Tender
Miscellaneous Services
Item Wise
30 days
WEST BENGAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹3,141
Yes
1 Sept 2026
10 Aug 2026
3 Sept 2026
10 Aug 2026
1 Sept 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description | |||||
| 1.01 | PROVIDING AND FIXING EXTERIOR QUALITY ALUMINIUM
COMPOSITE PANEL (ACP) WALL CLADDING ON EXISTING AL. /MS
FRAME WORK WITH GI BRACKETS, ACP FIXED ON THE EXISTING
FRAME WORK BY FOLDING THE EDGES OF ACP PANEL
(ENGRAVING THE REAR SURFACE OF ACP SHEET) WITH CP
ANGLES, CLEATS AND STRAINLESS STEEL SCREWS FORMING
GROVES AT THE PERIPHERY OF ACP PANEL. SUCH GROOVES
FILLED WITH FOAM AND SILICON SEALANT ETC. COMPLETE
WITH ALL MATERIALS (BUT INCLUDING THE COST OF SILICON
SEALANT), LABOUR, SCAFFOLDING AND ALL OTHER INCIDENTAL
CHARGES COMPLETE IN ALL RESPECT AS PER SPECIFICATION
AND DIRECTION OF ENGINEER-IN-CHARGE. (MODE OF PAYMENT
IS ON FINISHED SURFACE AREA OF ACP)
(B) 4MM THICK
(0.50MM AL.+3.0MM LDPE +0.50MM AL. PVDF COATING) Aluminium
Composite Panel (ACP) | 18 | SQM | - | - |
| 1.02 | SUPPLYING BUBBLE FREE FLOAT GLASS OF APPROVED MAKE
AND BRAND CONFORMING TO IS: 2835-1987; (B) COLOURED,
TOUGHENED GLASS CONFORMING TO IS: 2553-1992 (PART-II) (I)
6MM THICK Coloured, toughened glass conforming to IS: 2553-1992 | 3.5 | SQM | - | - |
| 1.03 | SUPPLYING GLAZING SILICON OF APPROVED MAKE AND BRAND
FOR FIXING OF GLASS ON SUB-FRAME AS PER DIRECTION OF
ENGINEER-IN-CHARGE FOR STRUCTURAL GLAZING/CURTAIN
WALL ETC. GLAZING SILICON FOR FIXING GLASS ON SUB FRAME
Glass on Sub-frame as per direction of Engineer-in-charge for
Structural Glazing/Curtain | 45 | MTR | - | - |
| 1.04 | SUPPLYING WEATHER SILICONE SEALANT OF APPROVED MAKE
AND BRAND FOR FIXING OF GROVE LINE BETWEEN THE
GLASSES AS PER DIRECTION OF ENGINEER-INCHARGE FOR
STRUCTURAL GLAZING/CURTAIN WALL. Fixing of grove line
between the Glasses as per direction | 45 | MTR | - | - |
| 1.05 | SUPPLYING PROFILES OF REQUIRED SECTIONS MADE OF
ALUMINIUM ALLOY EXTRUSION CONFIRMING TO IS 732-1983 AND
IS 1285-1975 ANODISED WITH REQUIRED FILM THICKNESS AND
SPECIFIED COLOUR / NATURAL MAT FINISHED CONFORMING TO
IS 1868-1983 FOR FABRICATION OF STRUCTURAL GLAZING,
CURTAIN WALL FORMED OF BASIC SECTION OF ANY ISI
EMBOSSED / CERTIFIED MAKE AND BRAND AS PER DIRECTION
OF ENGINEER-IN-CHARGE. (PAYEMENT WILL BE MADE ON
FINISHED LENGTH OF THE WORK). FOR STRUCTURAL GLAZING /
CURTAIN WALL WITH 15 MICRON COLOURED ANODISING; FIXING
PLATE (WT. @ 0.515 KG PER MTR.) Anodised with required film
thickness and specified colour / natural mat finished | 25 | MTR | - | - |
| 1.06 | SUPPLYING PROFILES OF REQUIRED SECTIONS MADE OF
ALUMINIUM ALLOY EXTRUSION CONFIRMING TO IS 732-1983 AND
IS 1285-1975 ANODISED WITH REQUIRED FILM THICKNESS AND
SPECIFIED COLOUR / NATURAL MAT FINISHED CONFORMING TO
IS 1868-1983 FOR FABRICATION OF STRUCTURAL GLAZING,
CURTAIN WALL FORMED OF BASIC SECTION OF ANY ISI
EMBOSSED / CERTIFIED MAKE AND BRAND AS PER DIRECTION
OF ENGINEER-IN-CHARGE. (PAYEMENT WILL BE MADE ON
FINISHED LENGTH OF THE WORK). FOR STRUCTURAL GLAZING /
CURTAIN WALL WITH 15 MICRON COLOURED ANODISING; FIXING
CAP (WT. @ 0.342 KG PER MTR.) Fixing cap (Wt. @ 0.342 Kg per
Mtr.) | 10 | MTR | - | - |
| 1.07 | Providing and fixing double scaffolding system (cup lock type) on the
exterior side of building /structure, upto 25 metre height, above ground
level, including additional rows of scaffolding in stepped manner as per
requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre
centre to centre, horizontal & vertical tubes joint with cup & lock system
with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in
the scaffolding for working platform etc. and maintaining it in a
serviceable condition for execution of work of cleaning and/ or pointing
and/ or applying chemical and removing it thereafter. The scaffolding
system shall be stiffened with bracings, runners, connecting with the
building etc, wherever required, if feasible, for inspection of work at
required locations with essential safety features for the workmen etc.,
complete as per directions and approval of Engineer-in-charge. Note:-
(1) The elevational area of the scaffolding shall be measured for;
payment purpose. (2) The payment will be made once only for
execution of all items for such works. | 192 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_2547787.xls
BOQ • 0.26 MB
DateCorrigendum1EOT65R.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].