Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹1,900
Closing Date
8 Jun 2026, 4:15 pm3d left
Deputy Executive Engineer Bhuj Electrical R & B Sub Division, Bhuj
A&A to Motor in Residential building under bhuj electrical sub division, Bhuj, Dist-Kachchh.
309684
03 of 2026-27
Open
Electrical Works
Kutch
7 documents required · 7 mandatory
₹600
Deputy Executive Engineer Electrical R and B Sub Division Bhuj
₹1,900
1 Jun 2026
1 Jun 2026
1 Jun 2026
8 Jun 2026
1 Jun 2026
No. less In Figures In Words according
to estimate
1 9 Ea. Replacing old and u/s by Supplying and erecting Direct-on-line, 2046.26 Rupees Two
Starter with 15A.rating contractor and with 4-14A. range, directly Thousand Forty
operated thermal overload relay in sheet steel enclosure for 3phase Six And Paise
415V.50 c/s. A.C. motor up to 7.5 H.P.complete erected on P.W. Twenty Six Only
Block with necessary connection.
2 9 Ea. Replacing old and u/s by Providing & erecting open well horizontal 18746.61 Rupees Eighteen
mono block pump set with cast iron body, complete for three phase Thousand Seven
submersible motor having Hundred Forty
[D] For 5 HP 3 phase open well horizontal mono block pump set Six And Paise
suitable for 1350 LPM to 310 LPM @ 10 to 42 Mtr head suitable for Sixty One Only
50/65 mm dia delivery pipe
Total Rs.
In Words : Rupees One Lakh(s) Eighty Seven Thousand One Hundred Thirty Five And Paise Eighty Three Only
Note : The Credit of dismentalled materials of Rs. 16355.52 shall be recovered from the First R.A. bill payable to the contrator and there
after the dismentalled materials shall be the property of the contractor.
I/We am/are willing to carry out the work at ____________% above/below (in Figures)__________________________
percent Above / below (in words) the estimated rates mentioned above amount of my\our tender works out as under :-
Estimated amount put to Tender Rs._________________
Deduct _____% below Rs._________________
(-)Less For Dismantle Material Rs._________________
Net Amount Rs._________________
(Rupees in Words)____________________________________________________________.
Estimated amount put to Tender Rs. _________________
Add. ________% Above Rs. _________________
(-)Less For Dismantle Material Rs. _______________
Net Amount Rs. _________________
(Rupees in Words)____________________________________________________________.
A I/We hereby declare that I/we have visited the site and fully acquainted my self / our selves with the local situation regarding
material,labour and other factors pertaining to the work before submitting this tender.
B I/We hereby declare that I/we carefully studied the conditions of contract, detailed technical specifications and other tender
documents of this work and agree to execute the same accordingly.
C Any Excess in Tender Item/Extra Item if Needs to be Execute. Contractors has to carry out on the instruction of Competant
Authority on Tender Submitted rate, No Excuse will be Accepted. Hence Contactors are Requested to quote the rate considering
this condition.
D Contractors are requested to quote the Tender by considering that payment will be made after availabilty of grant. Contractor
has to start the work immediately after issue of Work Order and as per instruction of Engineer in-Charge irrespective of
availability of grant.
E This Estimate has been prepared on the new SOR which is exclusive of GST hence GST additional will be paid to the agency as
per existing guidelines.
(Signature of the Contractor) Deputy Executive Engineer
Electrical R&B Sub Division
Executive Engineer
Electrical R&B Division
Note 1 Please strike out whichever is not applicable.
2 In the case of tendered amount being quoted incorrectly the quoted pered percentage Below/Above will be considered
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SCHEDULE A-B.pdf
Dismantle Material List.pdf
Motor SBD BHUJ.pdf
Download all tender documents and submit your bid